SystemPower Generation & Water Production

Heat Rate Performance Monitoring

Heat rate monitoring that prices every controllable loss in fuel each day, so the costliest drift is fixed first

See one case, screen by screen ↓
Watch with transcript →

Built forPerformance engineersOperations managersFuel managersMaintenance plannersShift charge engineers

The Problem Today

Plants lose efficiency slowly while each value stays inside its alarm band, so extra fuel burns for weeks.

60-80%
of the cost of power from a thermal plant is fuel published

Corrected in a spreadsheet

  • Historian
  • Fuel flow
  • Conditions
  • Curves
  • Two equal amber lightsA small drift and a costly one look the same
  • Cause argued in a meetingFouling, an air leak or low water flow each mean a different job

The Solution

  1. Corrected each hourEach unit's heat rate corrected to the day's load, weather and gas
  2. Each loss priced in fuelThe gap split into losses, each priced in fuel a day, with or without an alarm
  3. Cause tested, then namedFouling confirmed, with air in-leakage and cooling water flow ruled out
  4. The engineer raises the fixFixes compared on cost and payback, and operations approves the window

Built-in controls

  • The unexplained residual is always shown
  • Only the approved model and fuel price
  • Savings counted only on measured data

What You Get

The costliest drift is fixed first, so less gas is burned for the same output and emissions fall with it.

$580K
a year of fuel per 1% heat rate gain on a 500 MW combined cycle published
  • Drift priced the next morningSeen in the daily report, between monthly performance tests
  • Cleaning paid back by fuelAn online condenser clean pays for itself within days in gas saved
  • Work orders ready to scheduleDrafted with the window, permit and contractor
In short

What is Heat Rate Performance Monitoring?

Heat rate is the fuel energy a unit burns for each kilowatt-hour it sends out, in kJ/kWh. Heat rate performance monitoring compares each unit's actual heat rate, corrected to the day's conditions, with what it should achieve. It also shows where the difference comes from. Heat Rate Performance Monitoring does this each hour and prices each controllable loss in fuel.

How to choose AI solutions for utilities →

Updated

The problem

Power units burn extra fuel for weeks because slow losses never raise an alarm

Heat rate is how much fuel a power unit burns for each kilowatt-hour it sends out. Lower is better, and fuel is most of the cost of power from a thermal plant. A gas-fired steam or combined-cycle unit loses efficiency slowly. Condenser tubes foul and a feedwater heater level drifts. The boiler runs with more air than it needs, and steam temperatures sag. Each value stays inside its alarm band, so nothing trips and nothing reaches the control room. Together, though, these losses add to the fuel burned for every megawatt-hour. The drift is usually found at the monthly performance test, or when output is limited in the summer. By then it has been running for weeks.

Even once it is found, the drift is reported in kJ/kWh or percent. So a small excess-air drift and a large condenser drift look like two equal amber lights. Nobody sees which one costs more. Then people argue about the cause instead of testing it. The condenser could be fouled, short of cooling water or leaking air. Each answer means a different job. The cost, the cause and the work order are left to a spreadsheet and a meeting.

typical60-80%of the cost of producing electricity from a thermal plant is fuel
typical$580K a yearof fuel for a 1% heat rate improvement on a 500 MW combined-cycle plant
typical2-4%heat rate typically recovered by production-cost optimization projects
Where a drift's days go, from its first day to a proven savingestimated
By hand41 days
With the solution5.5 days
  • Drift running unseen between performance tests24 → 1 d
  • Pulling historian data and correcting to the day's conditions2 → 0.1 d
  • Agreeing the cause: fouling, air in-leakage or cooling water flow3 → 0.2 d
  • Pricing the ways to fix it and their payback2 → 0.2 d
  • Raising the work order and agreeing the load window3 → 1 d
  • Measuring what the fix recovered7 → 3 d

Our estimate for one controllable loss, such as a fouling condenser, in calendar days, by hand and with the solution. The 24 days by hand come from the sample case. There the condenser drifted for 24 days before anyone priced it.

How it works

Hourly correction, loss split and fuel price for each unit

What comes in
Plant data in4 sources · historian, fuel and gas quality, conditions, curves
Agents at work
Data checkertags + balances
Then
Heat rate corrector
Loss attributor
Fuel pricer
Then
Loss diagnosticiantests the causes
Then
Action plannerfix + payback
Savings verifier
A person decides
Performance engineerraises the work order
What comes out
Loss tree in dollars a day
Work order with payback
Saving verified
One case, step by step

A fouled condenser, from the morning loss tree to an approved load window

A utility runs five units at two stations, with a sixth in planned outage, on gas at $17.60 per GJ. One is a 620 MW gas-fired reheat steam unit that also supplies extraction steam. Here is what happens on a Tuesday morning, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0107:10

    The morning starts on a loss tree priced in fuel

    Performance engineer

    The performance engineer opens the loss tree for the overnight report. The steam unit's corrected net heat rate is 9,982 kJ/kWh against an expected 9,640. That is +342 kJ/kWh, or 3.5%, and $73,680 a day of fuel. The tree splits the gap into the turbine cycle and condenser ($56.7K a day) and the boiler ($16.4K). The most expensive loss comes first. At the top is condenser vacuum, 128 against 89 mbar(a), at $46,100 a day.

    “$73,680 a day of fuel above the expected heat rate · 4,186 GJ of gas · 235 t CO2. Fix order by money, most expensive first.”

  2. 02One click

    In alarm view, each node is green

    Performance engineer

    The same tree in alarm view shows 0 alarms on the unit, and each loss reads “In band”. Condenser pressure is 128 mbar(a), and its alarm is at 160. The HP heater 6 terminal temperature difference is 7.9 °C, with an alarm at 15. This is what the control room sees, and why nobody called the performance engineer.

    “No alarm. 128 mbar(a) is inside its band. The alarm is at 160. What it burns is below.”

  3. 0305:00 to 05:06

    Each unit corrected before anyone arrives

    Data checker and Heat rate corrector

    Overnight, the Data checker read 2,184 tags for five units. It flagged the feedwater flow transmitter reading 0.8% high against the condensate flow balance. So it used condensate flow plus heater drains instead, and labeled the substitution. The Heat rate corrector then applied model v4.1. Load was 510 MW against 620, cooling water was warmer than design, extraction was 62 t/h and gas was 38.9 MJ/Sm³. Design heat rate is 9,367 kJ/kWh, and with corrections the expected value is 9,640.

    The Data checker never fills a gap or replaces a value without labeling it.

  4. 04Replaying the weeks before

    The day scrubber shows when the drift began

    Performance engineer

    The performance engineer drags the day scrubber back. Early in the drift, the unit was costing $24,340 a day and the condenser only $10,990, at 98 mbar(a). Pins on the scrubber come from the shift and maintenance logs. An intake screen trip let shell debris into the cooling water. Two days later, tube cleaning ball recovery fell to 38%. From there the condenser node grows each day.

    “log: Tube cleaning ball recovery falls to 38%”

  5. 05Open the loss

    Fouled tubes, with the other causes ruled out

    Loss diagnostician

    The loss page plots condenser pressure against the expected pressure from the heat balance. It is corrected to the day's load and cooling water. The loss has cost $561K of fuel since the drift began. The Loss diagnostician tested four causes. Tube fouling is confirmed. Air in-leakage, low cooling water flow and instrument error are each ruled out, with the reading that rules them out.

    “The intake screen tripped and let shell debris into the cooling water. Two days later the tube cleaning balls were no longer recovered (38%), so the tubes fouled with nothing to keep them clean.”

  6. 06The evidence

    Eight readings, each linked to its source

    Loss diagnostician

    The cleanliness factor by the HEI method is 66%, against 84% after the last clean. Terminal temperature difference is 9.8 °C against 4.1. Cooling water temperature rise is normal, at 9.6 °C against 9.4. Vacuum pump air flow is 14 kg/h, where normal is below 20. Condensate dissolved oxygen is 6 ppb. Tube cleaning ball recovery is 38%, where normal is above 90%.

    The Loss diagnostician never states a cause without the tests that rule out the others.

  7. 07Run it again

    Three ways to fix it, priced and compared

    Action planner

    The performance engineer re-runs the diagnosis step by step and gets the same answer as at 05:05. The Action planner compares three options, at $215 a day per kJ/kWh on this unit. Restoring ball cleaning alone recovers $5,390 a day. A full clean at the next planned outage costs $31,000. But it lets the loss run another 132 days, about $6.4M. Cleaning half the condenser at a time while running recovers $38,780 a day for $59,400. It pays back in 1.5 days.

    “Recommended: the best payback, and no outage.”

  8. 08Raise

    The work order is drafted, and the engineer raises it

    Performance engineer

    The work order is ready for the maintenance planner. The tube cleaning contractor cleans the tubes half by half and repairs the ball recovery strainer, at its quoted price. A permit covers isolating water box A, then B. The load limit holds the unit at 400 MW from Thursday 22:00 to Friday 10:00, as two 6-hour blocks. The justification carries the cost, the cause and the payback.

    “Drafted by the Action planner at 05:06. You raise it. Nothing is sent until you do.”

  9. 09Approved

    Operations approves the 400 MW window

    Operations manager

    Raising the work order asks the operations manager for the load window. The operations manager approves any fix that takes a unit below its dispatch. The window is approved, and the work order moves on. The performance engineer raised it and the operations manager approved the window. The maintenance planner schedules Thursday 22:00. The last step stays open until the saving is measured.

    “Load window approved by the operations manager · Thu 22:00 to Fri 10:00 at 400 MW”

  10. 10In the register

    The saving is measured before it counts

    Savings verifier

    The cleaning joins the action register, where each fix is ranked by what it recovers for what it costs. If all open actions were done, they would recover $81,840 a day. The Savings verifier counts a saving only on measured, steady data. For example, an offline compressor wash on a gas turbine at the combined-cycle block was forecast at 55 kJ/kWh and measured at 57. That is $18,300 a day, on ten days of steady data.

    The Savings verifier never counts a saving before 3 days of steady data.

Who it’s for

Five jobs around one heat rate loss, from finding it to running the fix

The same fouled condenser, seen by the five people who find it, approve it, plan it, fuel it and run it. Here is what their week looked like, and what it looks like now.

Performance engineer
Raises work orders and approves the model and curves
Before
Starts at 07:00 with the overnight report across five units, reading deviations in kJ/kWh and percent. Then chases whichever looks biggest. Nothing is in alarm, and the fleet still burns an extra 8,800 GJ a day.
Now
Opens a loss tree priced in dollars a day, with the cause already tested and the fixes compared. Raises the work order from the same screen.
Operations manager
Owns load and outages, and approves load windows
Before
Gets asked for load reductions without the money behind them. Will give a window once someone shows what it pays back.
Now
Gets a load request with the window, the megawatts and the payback attached, and approves it in one step.
Fuel manager
Nominates gas and approves the monthly fuel price
Before
Answers for the fuel bill. The gas order, called a nomination, is built on yesterday's heat rate, so it is only as good as that number.
Now
Sees the fleet's extra gas each day, 8,827 GJ today. Tomorrow's nomination carries about 2,203 GJ a day less once the condenser cleaning is done.
Maintenance planner
Turns approved fixes into scheduled work
Before
Receives fixes as emails and meeting notes, without the load window or the permit.
Now
Receives a work order with the contractor quotation, the isolation permit, the approved load window and the justification attached.
Shift charge engineer
Runs the unit through the night
Before
Carries out the half-condenser isolation and the control-room changes. Has to ask which half goes first and how low to take the unit.
Now
Gets each task in the action register with the time and the reason. For example, returning the FD fan bias to 0% after burner maintenance is scheduled tonight.
The agents

Correction, pricing and diagnosis agents behind each unit's heat rate

Every hour, seven agents correct each unit's heat rate, split the gap into priced losses and test the causes. The performance engineer raises the fix.

Data checker

Reads historian tags each hour. Checks ranges, flat lines and the feedwater and condensate flow balance, and flags drifting instruments. Where a backup measurement exists, it uses it and labels the substitution.

  • Never fills a gap or replaces a value without labeling it
  • Rejects values outside their physical range or flat for more than 2 hours
Heat rate corrector

Computes net heat rate from fuel flow, gas energy content and net output. Corrects it to the day's load, cooling water temperature, ambient conditions and gas quality. Uses the approved model and the manufacturer's curves.

  • Never changes the model or a curve
  • Reports each correction factor with the expected heat rate
Loss attributor

Splits each unit's deviation into controllable losses, using that unit's own sensitivity curves. Shows what it cannot assign to a loss as a residual.

  • Never forces the residual to zero
  • Warns when the residual exceeds 25 kJ/kWh
Fuel pricer

Turns each loss into GJ, dollars and metric tons of CO2 a day. Uses the fuel manager's approved price and the emission factor of 56.1 kg CO2 per GJ.

  • Never uses a price that is not approved for the month
Loss diagnostician

For each loss above $5,000 a day, tests the possible causes against the historian, maintenance and shift logs. The causes include fouling, air in-leakage, cooling water flow, heater level and burner settings. It cites each reading.

  • Never states a cause without the tests that rule out the others
  • Smaller losses are diagnosed weekly
Action planner

Compares the ways to fix a loss on cost, recovery, payback and window. Drafts the work order and the load request.

  • Never raises a work order or reduces load itself
  • Drafts only in the maintenance system
Savings verifier

After a fix, measures the recovered kJ/kWh and dollars against the forecast on steady data.

  • Never counts a saving before 3 days of steady data
Performance engineer

Raises the fix, and operations approves load.

Ask in plain words

Questions about a unit's heat rate, a loss or a fix

Ask what a unit is costing in fuel, what is causing a loss or what a fix pays back. Each answer points to its readings. These answers use the sample data.

Why is the steam unit costing $73.7K a day more than expected?

Its corrected heat rate is 9,982 kJ/kWh against an expected 9,640, so +342 kJ/kWh. At $17.60/GJ and 12,240 MWh a day, each kJ/kWh costs $215 a day. Most of it is one loss. The condenser at 128 mbar(a) against 89 costs $46,100 a day. Next come the HP heater 6 level ($8,830) and excess air after the burner work ($6,250). No alarm is active, because each value is inside its band.

Is the condenser fouled, or leaking air?

Fouled. The cleanliness factor is 66%, down from 84% after the last clean. The terminal temperature difference (TTD) is 9.8 °C against 4.1. Air in-leakage is ruled out, because vacuum pump air flow is 14 kg/h and dissolved oxygen is 6 ppb. Cooling water flow is normal, with a 9.6 °C rise against 9.4. It started when ball recovery fell to 38% after the intake screen trip.

What does cleaning the condenser pay back?

Cleaning half the condenser at a time while running recovers about 180 kJ/kWh, or $38,800 a day. It costs $59,400, made up of $38,000 for the contractor and $21,400 of margin lost at 400 MW. It pays back in 1.5 days. Waiting for the next planned outage is a cheaper job. But it lets the loss run 132 more days, about $6.4M. The operations manager approves the load limit.

Which gas turbine should get the next offline wash?

The one at the combined-cycle block. Its compressor efficiency is 86.1% against 88.4% after its last wash, costing $25,000 a day. An offline wash recovers about 64 kJ/kWh, or $20,500 a day, for $110,000. So it pays back in 5.4 days. The wash on the turbine beside it recovered 57 kJ/kWh, measured. The first low-demand Saturday is the slot.

The screens

The screens a performance engineer uses, from loss tree to work order

From the working solution, on its sample data. Pick one to see it large.

The loss treeA unit's corrected heat rate split into controllable losses, each priced in dollars a day, most expensive first. Beside it are the selected loss and the overnight run.
Alarm viewThe same tree as the alarm system sees it. There are 0 alarms and each value is in band, while the unit burns $73,680 a day above expected.
Replay the driftThe day scrubber set back to early in the drift, with events from the shift and maintenance logs pinned where they happened.
One loss, diagnosedCondenser pressure against expected since the last clean, the causes tested and ruled out, and the three ways to fix it.
The evidenceEight readings against their expected or normal values, each linked to the historian, calculation or log it came from.
The diagnosis, step by stepThe agents re-run the diagnosis on request. They show the tags checked, the expected pressure, each cause tested, the start of the drift and the options compared.
Raise the work orderThe drafted work order with contractor, permit, load limit and justification. Nothing is sent until the performance engineer raises it.
Load window approvedThe work order's steps. It is raised, operations approves the 400 MW window, it is scheduled, and then the saving is verified.
TrendThe daily fuel cost of each loss on a unit since the last clean, stacked, with the events behind each rise. No alarm was raised in 43 days.
ActionsEach priced fix ranked by recovery per dollar spent, its work order and status, and the savings verified on steady data.
FuelExtra gas above the expected heat rate by unit, in GJ, dollars and CO2, and what tomorrow's gas nomination carries.
Expected heat rate modelThe manufacturer's curve, today's corrections to load, cooling water, extraction, gas and ambient, and instrument health.
SettingsFuel price, emission factor, thresholds, the correction run and who raises work orders and approves load limits.
Governance

Who raises, approves and schedules a fix in heat rate monitoring software

Each number links to its sourceEach heat rate, loss and price links to its historian tags, the curve it was compared with and the correction applied. The links go down to the heat balance page and the contractor quotation.
The residual is always shownSome of the gap cannot be assigned to a controllable loss. That part stays on the tree as an unattributed residual and is never forced to zero. A warning shows when it is above 25 kJ/kWh.
People raise, approve and scheduleAgents do not raise work orders, change load or change the model. The performance engineer raises the work order, the operations manager approves any load limit and the maintenance planner schedules it.
A versioned, approved modelThe expected heat rate model and its curves are versioned and approved by the performance engineer. A proposed version is previewed first. Each result keeps the model it was made with.
An approved fuel priceLosses are priced only at the fuel price the fuel manager approves for the month. For the current month that is $17.60 per GJ, approved on the first of the month.
Savings are measured before they countA fix is counted only after the Savings verifier measures it against its forecast, on at least 3 days of steady data. Each setting change is saved as a new version, with who made it.
Configuration

Fuel price, loss thresholds and approvers in the heat rate settings

The fuel price, the thresholds, the schedule and who decides are all settings. Each change is saved as a new version.

SettingDefaultChoose from
Fuel price, $ per GJ17.60Set monthly by the fuel manager · October approved by the fuel manager at the start of the month
Emission factor56.1 kg/GJ (IPCC default)56.1 kg/GJ (IPCC default) · Station fuel analysis, 55.8 kg/GJ
Price a loss when it is above$1,000 a dayAny amount in dollars a day · smaller losses stay in the tree but are not diagnosed daily
Diagnose dailyOnOn · Off. Losses above $5,000 a day get a cause test every morning
Residual warningOnOn · Off. Warns when the unattributed part is above 25 kJ/kWh
Correction runEvery hour, report at 05:00Every hour, report at 05:00 · Every 15 minutes, report at 05:00 · Every hour, report at 06:00
Who raises work ordersPerformance engineerPerformance engineer · Performance engineer or operations manager. The Action planner drafts, and a person raises
Who approves a load limitOperations managerOperations manager · Operations manager and shift charge engineer. Applies to any fix that needs the unit below its dispatch
Connections

Historian, gas chromatograph, curves and logs the heat rate model reads

Plant historianhourly tags for each unit, such as pressures, temperatures, flows, O2 and output
Fuel flow and gas qualityfuel flow and gas calorific value from the station chromatograph
Ambient and cooling water conditionscooling water inlet temperature, ambient temperature and humidity
Manufacturer's performance curvesheat balances, condenser and turbine curves, unit sensitivity curves
Maintenance systemwork orders created there with the justification attached
Shift and maintenance logstube cleaning logs, instrument records, burner work, contractor quotations
What it changes

What one point of heat rate is worth in fuel, CO₂ and days

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

demo
$32Ma year
of fuel for each 1% of heat rate recovered across the sample fleet
1% on a 500 MW CCGT$580K a year
1% on the sample fleet$32M a year
demo
103,000t CO2
a year avoided by the same 1% on the sample fleet
1% of heat rate
emissions fall with fuel
target
1day
to see a drift priced, instead of waiting for the monthly test
One condenser, found by hand24 days, $561K
Priced each morning1 day

“Demo” means seen in the working solution, on its sample fleet data. “Estimated” means our arithmetic on sample inputs, and the days split is our estimate. “Typical” means a published figure. One source is a POWER article, “Utilities and industry continue learnings around benefits of heat rate improvement”. It says fuel is 60 to 80% of the cost of producing electricity from a thermal plant. It also says 1% on a 500 MW combined-cycle plant is about $580,000 a year. Another POWER article is “Coal-fired power plant heat rate improvement options, part 2”. Both say production-cost optimization projects recover 1 to 5% of heat rate, typically 2 to 4%. Methods named as context are ASME PTC 46, PTC 12.2, the HEI condenser method and the IPCC 2006 natural gas default of 56.1 kg CO2/GJ. Names on the screens are sample data.

Questions

Heat rate monitoring software questions from performance engineers

What is heat rate performance monitoring?

Heat rate is the fuel energy a unit burns for each kilowatt-hour it sends out, in kJ/kWh. Heat rate performance monitoring compares each unit's actual heat rate, corrected to the day's conditions, with what it should achieve. It also shows where the difference comes from. Heat Rate Performance Monitoring does this each hour and prices each controllable loss in fuel.

How does heat rate monitoring software work?

Seven agents share the work. They check the historian tags and correct each unit's heat rate with the manufacturer's curves. The corrections cover the day's load, cooling water, ambient conditions and gas quality. They split the gap into controllable losses and price each one in GJ, dollars and CO2. For the most expensive losses, they test the causes, compare the fixes and draft the work order. The performance engineer raises it.

What are controllable losses, and how are they priced in fuel?

Controllable losses are the parts of a heat rate deviation that operations and maintenance can fix. They include condenser vacuum, feedwater heaters, excess air, main steam and reheat temperatures, reheat spray and auxiliary power. Each is converted into kJ/kWh with the unit's own sensitivity curves, then into fuel at the approved price. On the sample steam unit, each kJ/kWh costs $215 a day.

How does it tell condenser fouling from air in-leakage?

The Loss diagnostician tests each cause against its own readings. In the sample case, a cleanliness factor of 66% and a TTD of 9.8 °C, with normal cooling water rise, pointed to fouling. Vacuum pump air flow of 14 kg/h and dissolved oxygen of 6 ppb ruled out air in-leakage. It states a cause only when the tests rule out the others.

Does it work for combined-cycle plants and steam units with extraction?

Yes. The sample fleet has gas-fired reheat steam units and combined-cycle blocks, with losses such as gas turbine compressor fouling and inlet filter pressure drop. Steam extraction is one of the corrections, so a steam unit is judged against what it should achieve at the extraction it supplies.

How does it prove a fix saved fuel?

After a fix, the Savings verifier measures the recovered kJ/kWh and dollars against the forecast. It counts nothing before 3 days of steady data. In the sample, one gas turbine's offline compressor wash was forecast at 55 kJ/kWh and measured at 57.

Can an agent raise a work order or take a unit off load?

No. The agents only draft. They do not raise a work order, reduce load or change the model. The performance engineer raises work orders and approves the model and curves. The operations manager approves any load limit. The maintenance planner schedules the work, and the fuel manager approves the fuel price.

What do we hand over to start on our own units?

You hand over your historian tag lists, the manufacturer's heat balances and curves, your fuel price and your approvers. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once every quality gate has passed. We will walk you through it on your own units first.

Price the drift on your units
from your own historian data.

We'll run Heat Rate Performance Monitoring on a sample of your own historian data and performance curves.