WorkflowMetering & AMI Operations

Meter Testing Compliance

A meter testing program that samples each lot to the standard, keeps each test record complete and sends a failed lot straight to replacement

See one case, screen by screen ↓
Watch with transcript →

Built forMeter shop techniciansMetering engineersMeter shop supervisorsCompliance managers

The Problem Today

Test records sit in four places, so a failing meter lot is judged only at year end, in the annual report.

53 days
a year to run a large utility's sample program by hand our estimate

Four places, joined by hand

  • Test files
  • Asset list
  • Sample
  • Work orders
  • Slow meters lose revenueWorn meters mostly drift slow, so the utility bills less than it should
  • The warranty runs outA lot judged late can miss the manufacturer's warranty

The Solution

  1. Lots built, samples sizedMeters grouped by make and year, and each sample sized to the national standard
  2. Each test file checkedEach record matched to its lot and work order, with every required field filled in
  3. Each lot tracked as results arriveThe lot's score is redone with each result, and a lot that can no longer pass is called
  4. The engineer signs onceReplacement waves, the notice and the report are drafted from the same records

Built-in controls

  • Lots and samples locked once drawn
  • No agent edits a test reading
  • Each report number links to its records

What You Get

More failed lots are found in time to claim the warranty, and fewer test records reach an audit with gaps.

9.5 days
a year for the same program with the solution our estimate
  • Far fewer meters testedour estimateA sample plan needs under 30% of the testing of a periodic plan
  • Slow meters out soonerLots that read slow are replaced inside their removal window
  • Annual report kept currentEach failed lot goes into the commission report when it is decided
In short

What is Meter Testing Compliance?

Meter testing compliance software runs a utility's program for testing meters in service, from the sample plan to the annual report to the commission. Meter Testing Compliance puts each meter into a lot and sizes each lot's sample. It reads each test-board file into a complete test record and tracks each lot's result as tests arrive. It drafts the replacement program, notices, customer letters and the annual report. The metering engineer decides each lot, and regulatory compliance files.

How to choose AI solutions for utilities →

Updated

The problem

A failing meter lot is found months late, because test records sit in four places

Every regulated utility has to prove that its meters measure correctly. Most do it by testing a sample. The meters in service are split into lots of the same make, model and purchase year. A sample size is set for each lot under ANSI/ASQ Z1.9, a national standard for sampling. Each year the sampled meters are pulled and tested on a test board in the meter shop. The whole lot passes or fails on those results. Each test record must hold the meter, its location, the date and the reason for the test. It must also hold the reading as found, and as left after any adjustment. The program is summed up each year in a report to the commission.

Today that work is spread across four places. Each test board exports its own file. The asset register holds the lots, a spreadsheet holds the sample, and the removal work orders live somewhere else. Lots are judged only once, when the annual report is put together, months after the tests. By then less of the 12-month removal window is left. Sometimes the manufacturer's warranty has already run out. A record missing its reason or its as-left reading becomes a finding at audit. In the meantime, meters that read slow lose revenue quietly. A failed lot is also a big job. It means thousands of meter exchanges to plan by route, stock to order and a commission notice due within 30 days.

estimated< 30%of a periodic plan's testing is all a sample plan needs, but then each lot decision rests on the statistics
Where a sample program's working days goestimated
By hand53 days
With the solution9.5 days
  • Declaring lots, sizing samples and raising removal work orders6 → 1 d
  • Chasing gaps in test records, such as seal numbers, as-left readings and manifests8 → 2 d
  • Working out each lot's average, spread and quality score6 → 0.5 d
  • Planning a failed lot's replacement, notice and warranty claim15 → 3 d
  • Assembling the annual meter test report18 → 3 d

Our estimate for one program year at a large utility with electricity and water meters, in working days, by hand and with the solution. The annual report figure starts from the 3 to 4 weeks of compliance analyst time the sample utility estimates today.

How it works

ANSI C12.1 sampling in the meter testing program, lot by lot

What comes in
Meters and tests in4 sources · asset register, test boards, certificates, rules
Agents at work
Lot builderby make and year
Sample plannern per lot
Then
Test record checkerboard files
Certificate reader
Then
Acceptance analystQ against k
Then
Replacement planner
Report writer
A person decides
Metering engineersigns each lot decision
What comes out
Signed lot decision
Replacement program
Annual report filed
One case, step by step

A failing 2016 meter lot, signed for replacement

The sample utility has split its electricity and water meters into 48 lots for this year's sample program. One lot is 8,400 single-phase smart meters of one make and model. They were bought in 2016 and are spread across four districts. One Tuesday morning, a test board in the meter shop has 14 new results. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    All the meters in service on one lot board

    Metering engineer

    The metering engineer owns this year's sample program and signs each lot decision. The lot board shows each lot as a square sized to its meters in service. Make runs down the board and purchase year runs across. On the board, 34 lots have passed, 1 is on watch, 5 are in test, 2 have failed and 6 are due. So far 5,070 of 6,050 samples are tested. The 2016 lot is in test at 61 of 75. Its quality score, called Q, is 1.70. To pass, Q must reach the lot's pass mark k, here 1.53.

    “In test · 61 of 75 · close to k. Q so far 1.70 · best case if the rest read 0.00%: 1.95. 14 results waiting on the board.”

  2. 02The sample plan

    Each lot's sample sized to the standard

    Sample planner

    The plan fits on one line. This lot has 8,400 meters, tested at general inspection level II. That gives code letter L from the Z1.9 table, 75 samples, an acceptable quality level of 2.5% and a pass mark k of 1.53. For any lot size, the plan calculator works out the letter, the sample and k from the approved table. The sample was drawn at random early in the year, and 75 removal work orders were raised the same day.

    Limit: the sample planner does not redraw a sample once results exist, and the random seed stays on the record.

  3. 0307:40

    Fourteen results waiting on the test board

    Meter technician

    The technician tested 14 samples from the 2016 lot this morning, and the board file is waiting. The other boards are busy. One has customer tests, the next has a new shipment of another model, and the fourth has water samples. The test record checker has flagged 3 of 74 records today as incomplete. One reference standard, the precise meter a board tests against, is due for calibration in 6 days.

    “The reference standard is due in 6 days. Its board stops taking tests next week unless it is recalibrated.”

  4. 0410:16

    At sample 68, the lot can no longer pass

    Test record checker and Acceptance analyst

    The test record checker reads the file. It has 14 rows, and each serial number matches the lot and its removal work order. All 14 records are complete, and the board's reference standard was calibrated last month. The acceptance analyst plots each result against the ±2% band and redraws the running quality score. Most meters read slow at light load. At sample 68 the analyst shows the lot cannot reach k, whatever the last seven read.

    “Cannot pass at sample 68: even if each remaining sample reads 0.00%, Q reaches only 1.49”

  5. 0510:17

    The lot crosses its acceptance limit

    Acceptance analyst

    At 75 of 75 the lot fails. The average error is −0.90%, the spread is 0.86, and Q is 1.29 against a k of 1.53. Six of the 75 meters are outside ±2%, and all of them read slow. About 828 meters in the lot are estimated to read below −2%. The lot turns red on the board. All 8,400 meters are flagged for replacement by district, from 3,120 in the largest to 1,060 in the smallest.

    Limit: the acceptance analyst proposes pass or fail and shows its working. It does not sign a lot decision.

  6. 06Check the records first

    The bulletin and certificate behind the drift

    Certificate reader

    The lot record holds the Z1.9 worksheet, each sample, the list of meters out of limits and the agents' notes. Five of the six meters out of limits share one serial range. They were built in production weeks 14 to 22. A manufacturer bulletin names those weeks for drift at light load. Light-load errors in the lot average −2.51%, against −0.49% at full load. The delivery certificate shows that batch passed its light-load test by only 0.4%.

    “The lot was declared as one group before sampling and cannot be split after it, under the commission's rule. The serial range is proposed as its own lot in next year's plan.”

  7. 0710:21

    One signature, with its meaning recorded

    Metering engineer

    The engineer sees the lot, the plan, the result and the decision on one screen. The plan is Z1.9 level II, letter L, 75 samples, an acceptable quality level of 2.5% and k of 1.53. The result is Q 1.29, an average of −0.90%, a spread of 0.86, and 6 of 75 outside ±2%. The decision is that the lot fails and must be removed within 12 months under the commission's rule. The engineer signs as metering engineer.

    Meaning of signature: “I have reviewed the 75 test records and approve this lot decision”

  8. 08Signed

    The replacement program, before the warranty ends

    Replacement planner

    The replacement program was drafted at 10:17. It has five waves by meter-reading route over five months. In each wave, the 2,310 meters in the drifting serial range go first. The deadlines sit on top. The commission notice is due in 30 days, and 48 days are left to claim on the maker's warranty. There is also the 12-month removal window. No customer refunds are due, because no meter read fast beyond +2%. There are 6,200 replacement meters on the shelf and 2,200 more on order. Four crews each do 90 exchanges a day.

    Limit: the replacement planner sends nothing to the commission, a supplier or a customer. The notice, the warranty claim and the 8,400 letters wait for a named person.

  9. 09Same morning

    The annual report's failed groups, redrafted from the same records

    Regulatory compliance manager

    This year's annual meter test report to the commission is a draft built from 5,084 test records. Section 4, Failed groups and actions, now shows the 2016 lot: 8,400 meters, Q 1.29, failed today, replacement in five waves. It sits beside the two lots that failed earlier in the year. Each section carries a note that opens the records behind it.

    Checks before filing: “3 records incomplete on the test bench · 966 samples still to test before year end”. The compliance manager signs and files.

Who it’s for

The meter shop, engineering and compliance roles in a meter testing program

The same lot, seen by the five roles who own it from the test board to the commission: their year before, and their year now.

Metering engineer
Owns the sample program and signs each lot
Before
Owns this year's program of 48 lots and 6,050 samples. Sees a lot's result only when the annual tables are built, too late to act on a failing lot.
Now
Watches each lot's quality score move as results arrive and sees the point where a lot can no longer pass. Signs once to open the replacement program.
Meter shop supervisor
Releases records as complete
Before
Runs four test boards and chases missing as-left readings. The board gives numbers, but it does not say whether the record is complete.
Now
Sees each incomplete record flagged with what is missing and who tested it. Sees the reference standards on their 120-day calibration clocks.
Meter technician
Tests samples and new shipments
Before
Tests 60 to 90 meters a day, scanning, testing and moving on. Does not want to type the address in twice.
Now
The board file is read into complete records without retyping. Each serial is matched to its lot and work order, and each required field and the reference standard are checked.
Regulatory compliance manager
Files the annual report and notices
Before
Builds the annual meter test report from extracts, files the 30-day notices and answers the commission's data requests. Each number has to trace back to a test record.
Now
Opens a report draft with each section linked to its records. The draft is redone whenever a lot changes, and it lists the checks still open before filing.
Customer relations lead
Owns customer-requested tests
Before
Owns customer-requested tests on a 10-working-day clock. The customer wants one sentence. Is the meter right, and is money owed back?
Now
Approves a plain-words result letter with the refund already worked out from the rule and the bill.
The agents

Lot, sample and acceptance agents for meter testing compliance

For each lot, seven agents size the sample, read the test files, track the result and draft the paperwork. The metering engineer signs each decision.

Lot builder

Groups the meters in service into lots of the same make, model, firmware family and purchase year, from the asset register. Reports each lot with its size and districts.

  • Never splits or merges a lot after its sample is drawn
  • Lots frozen at plan approval
  • Every meter in exactly one lot
Sample planner

Sizes each lot's sample to ANSI/ASQ Z1.9 level II from the approved table: code letter, sample size and pass mark k. Draws a random sample, records its seed and raises the removal work orders.

  • Never redraws a sample once results exist
  • Seed recorded on every lot
Test record checker

Reads each test-board file and matches each serial to its lot, sample number and removal work order. Checks the unit, location, date, reason, readings as found and as left, and the technician. Checks the reference standard was calibrated within 120 days.

  • Read-only on readings, and never edits one
  • Flags what is missing and does not fix it
Acceptance analyst

As results arrive, works out the average, the spread, the quality scores against both limits and the estimated share of meters outside limits. Works out the best score a lot could still reach, then proposes pass or fail.

  • Proposes, and the metering engineer signs
  • Shows the working on every decision
Certificate reader

Reads the manufacturer's certificate of conformity for each shipment: quantity, serial range, test results and firmware. Compares it with the shipment manifest and the receiving tests. Links manufacturer bulletins to the lots they name.

  • Never accepts a shipment
  • Quotes the certificate line for each fact
Replacement planner

Turns a failed lot into replacement waves by meter-reading route inside the removal window, and checks stock and crews. Drafts the commission notice, customer letters and any warranty claim. Works out refunds for meters that read fast.

  • Never sends to the commission, a supplier or a customer
  • Plan stays inside the 12-month window
Report writer

Drafts the annual meter test report in the commission's section order. Drafts customer test letters in plain words with the refund worked out.

  • No number without its records
  • Never files, and drafts stay drafts until a named person signs
Metering engineer

Signs every lot decision.

Ask in plain words

Questions about a lot's result, a test record or a customer's meter test

Ask about any lot, test record, customer test or the annual report, or say what to change. Each answer points to its records. These answers use the sample data.

Why is the 2016 lot failing?

Light-load drift in one production run. With this morning's results, 6 of 75 samples are outside ±2%, and all read slow. Light-load errors average about −2.5%, against −0.5% at full load. Five of the six sit in one serial range, in the weeks the manufacturer's bulletin names. The delivery certificate shows that batch passed its light-load test by only 0.4% in 2016.

Can we split the lot by serial range so the rest passes?

Not this year. The commission's rule locks a group once its sample is drawn, and this lot was declared before sampling. Splitting it now would look like choosing the result. The serial range is proposed as its own lot in next year's plan. That also gives the rest of the 2016 meters their own sample.

Which lots could fail next year?

Two to watch. A 2019 lot of another make passed with Q 1.67, only 0.14 above k, and older lots of that model are trending down. Two water lots from 2013 and 2014 passed at 2.46, the lowest of the water lots. The lot board is filtered to the lots on watch.

Draft the commission notice for the 2016 lot

The notice is drafted for the regulatory compliance manager. It covers the 2016 group of 8,400 meters, Q 1.29 against 1.53, six meters slow and removal in five waves. It is due within 30 days of the failure. Nothing is sent until you approve it.

The screens

The lot board, the chart where a lot can no longer pass and the signed replacement program

From the working solution, on its sample data. Pick one to see it large.

The lot boardEvery meter in service in lots by make and purchase year, each lot's status, the quality score by year and the chosen lot's test chart.
The plan calculatorThe number of meters in a lot turned into code letter, sample size and pass mark, from the approved Z1.9 table.
The test benchFour test boards, the incomplete records, reference standards on their 120-day clocks and today's test records.
The point a lot cannot passResults arriving from the test board, each against the ±2% band, and the running quality score falling below k at sample 68.
A lot crosses its limitThe 2016 lot fails at Q 1.29 against 1.53, and all 8,400 meters are flagged for replacement by district.
The lot recordThe sample plan worksheet, the statistics, the agents' notes on the bulletin and certificate, and the meters out of limits.
Sign the lot decisionLot, plan, result and decision on one screen, signed by the metering engineer with the meaning of the signature.
The replacement programFive waves by meter-reading route on a month strip, the notice, warranty and removal deadlines, stock, crews and customer letters.
Customer-requested testsOpen requests on their 10-working-day clocks, and a plain-words result letter with the refund worked out.
New-meter acceptanceThe manufacturer's certificate beside the manifest and the receiving tests, with the mismatched serials held.
The annual meter test reportThe draft report to the commission, each section linked to its records, and the checks still open before filing.
Testing rulesEach clause of the commission's electricity and water rules beside the check that enforces it, and its count.
The plan and who decidesThe sample plan, the acceptance table, the limits and clocks, and who signs what.
Governance

Signed lots and locked samples for ANSI C12.1 meter testing compliance

The metering engineer signs each lotThe metering engineer signs each lot decision, and the meaning of the signature is recorded. A replacement program above 10,000 meters also needs the head of metering. Agents propose. They do not sign.
Lots and samples locked once drawnLots are locked when the plan is approved. Each sample is a random draw, and its seed is kept on the record. No agent can split a lot or redraw a sample after results exist. That rule stops anyone choosing the result.
No agent edits a readingEach reading keeps its source: the board, the file, the technician and the reference standard with its calibration date. The test record checker flags what is missing. A person completes the record, and the reading itself stays as tested.
Nothing leaves without a named personRegulatory compliance signs and files commission notices and the annual report. Customer relations approves customer letters. Warranty claims are reviewed before they go to the manufacturer.
Each report number links to its recordsEach table in the annual meter test report is counted from the lot and test records, with a margin note that opens them. The report cannot be filed while samples are still untested or a lot has no signed decision.
People and agents on one activity trailEach agent step and each human decision is recorded with its time. That covers who released the records, which file was read, and who signed the lot failure and when. Utility data stays in the utility's own environment.
Configuration

The commission's testing rules and the approved Z1.9 sample plan

The sample plan, the limits, the deadlines and who decides are all settings. Each change saves a new draft of the plan, which needs the metering engineer's approval.

SettingDefaultChoose from
AQL2.5%2.5% · 1.5% · 4.0%
Inspection levelGeneral IIGeneral II · General III · Special S-4
Variability methodStandard deviation, unknownStandard deviation, unknown · Range method
Watch margin above k0.200.20 · 0.10 · 0.30. A lot that passes this close to k goes on watch
Group byMake, model, purchase yearMake, model, purchase year · Make, model, firmware, year
Electricity in service · water in service±2.0% WA · ±1.5% normal flow±2.0% WA · ±1.0% WA for electricity; ±1.5% · ±2.0% normal flow for water
Commission notice after a failure · failed-lot removal30 days · 12 months30 days · 14 days; 12 months · 18 months
Customer test clock · reference standard calibration10 working days · 120 days10 · 15 working days; 120 · 90 days
Connections

Asset register, test boards, certificates and work orders in the meter shop

Meter asset registereach meter in service with its make, model, purchase year, location and lot
Test boardsboard result files, with readings as found at full load, light load and power factor
Manufacturer certificates and bulletinscertificates of conformity, shipment manifests, bulletins and supply agreements
Commission testing rulesthe testing rules for electricity and water, the approved sample plan and its acceptance table
Work ordersremoval work orders for each sample, and exchanges for a failed lot
Customer requests and billingcustomer-requested tests, billed amounts for refunds, and the priority register
What it changes

Fewer meters to test and faster lot decisions under ANSI C12.1

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of lots decided to the approved plan, every report number traced to its test records
each lot
decided to the plan
demo
$0.32M
a year of under-registered energy and water recovered on sample inputs, by replacing failed lots sooner
Found at year endmonths later
Found as results arrivesame day
demo
6,050
meters a year tested by statistical sampling at the sample utility, against a far larger periodic cycle
Periodic≈ 150,700
By sample6,050

“Demo” means seen in the working solution, on its sample utility data. “Target” means the design goal, measured in the live solution. “Estimated” means our arithmetic, with the sample utility's inputs shown. The $0.32M figure adds up three lots. The 2016 lot is 8,400 meters × 7,800 kWh × $0.16 × 0.90% ($94K). A 2018 lot is 21,600 × 7,800 kWh × $0.16 × 0.71% ($191K). A 2012 water lot is 14,200 × 180 m³ × $1.90 × 0.64% ($31K). The 150,700 figure is the sample utility's electricity meters on a 15-year cycle plus its water meters on a 10-year cycle. The working-days split is our estimate: 53 days by hand and 9.5 with the solution, for one program year at a large utility. “Estimated” also marks vendor figures. TESCO (Meter Testing 101) and NC Meter School 2022, citing ANSI C12.1, say sample plans need under 30% of the testing of a periodic plan. ANSI C12.1 and ANSI/ASQ Z1.9 are named as context. The pass marks shown are the sample utility's approved plan, and the commission's rules on the screens are sample rules. Names on the screens are sample data.

Questions

Questions from meter shops about ANSI C12.1 meter testing compliance

What is meter testing compliance software?

Meter testing compliance software runs a utility's program for testing meters in service, from the sample plan to the annual report to the commission. Meter Testing Compliance puts each meter into a lot and sizes each lot's sample. It reads each test-board file into a complete test record and tracks each lot's result as tests arrive. It drafts the replacement program, notices, customer letters and the annual report. The metering engineer decides each lot, and regulatory compliance files.

How does statistical sample meter testing work under ANSI C12.1 and Z1.9?

ANSI C12.1 lets utilities test meters in service by sample, with meters split into lots of the same kind. The solution sizes each lot's sample from your approved plan. In the sample case, 8,400 meters at general inspection level II give code letter L and 75 samples, at an acceptable quality level of 2.5%. As results arrive, it works out the average, the spread and the quality score Q. It compares Q with the pass mark k. A lot passes when Q is at least k.

What happens when a meter lot fails its sample test?

The acceptance analyst shows the point where the lot can no longer pass, and proposes the failure with its working. Once the metering engineer signs, the replacement planner's draft program opens. It has waves by meter-reading route inside the removal window, stock and crews, the commission notice, the warranty claim and the customer letters. The annual report's failed-groups section is redrafted from the same records.

Does it handle water meters as well as electricity meters?

Yes. At the sample utility, 20 of the 48 lots are water meters, both piston and ultrasonic. They are tested on a water flow bench against ±1.5% at normal flow. The other 28 lots are electricity meters, tested against ±2.0% weighted average registration. Limits, deadlines and grouping are all settings.

How does it manage customer-requested meter tests and refunds?

Each request runs on a 10-working-day clock. The test record checker flags a record that is incomplete, such as a meter adjusted and put back in service with no as-left reading. The report writer drafts the result letter in plain words, with the refund worked out from the rule. In the sample case that is $38.19 for a meter found 2.61% fast. Customer relations approves and sends it.

Can it check new meter shipments against the manufacturer's certificate?

Yes. The certificate reader compares the certificate of conformity with the manifest and the receiving tests. It checks quantity, serial range, errors and firmware. In the sample shipment of 4,000 new meters, 3 serials on the board were not on the certificate. So the proposal is to accept 3,997 and hold 3. The agent does not accept a shipment itself.

Who signs a lot decision and files with the commission?

People do. The agents read, calculate, draft and propose. They do not sign or send. The metering engineer signs each lot decision with its meaning recorded. Regulatory compliance signs and files notices and the report. Customer relations approves customer letters, and the meter shop supervisor releases records as complete.

What do you need from our meter shop and compliance team to start?

We need your commission's testing rules, your approved sample plan, your test-board file formats and last year's annual report. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own lots first.

Try meter testing compliance
on your own lots and board files.

We'll run Meter Testing Compliance on a sample of your own lots, test-board files and last year's annual report.