- Before
- Works the exception queue before each bill cycle closes, one exception at a time in raw interval data. The rule shows that a gap exists, and nothing about what belongs in it.
- Now
- Opens each exception as an interval strip with the estimate already drawn into the gap. The backtest behind the method and the evidence sit beside it. Then accepts, swaps the method or edits.
One night of VEE exceptions, worked before the bill cycle closes
A large utility reads its electricity meters every 15 minutes and its water meters every hour. Overnight, the rule book raised 6,842 exceptions from one Tuesday's reads. The current bill cycle closes on Thursday at 18:00. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0102:46
6,842 exceptions overnight, 352 left for a person
Triage agentThe run finishes at 02:46. Standing rules approved by the supervisor close 4,906 known false alarms. Another 1,584 are ready to accept in six groups. The remaining 352 need a person, ranked by the bill they hold and the hours to cycle close. At the top is a dental clinic's meter with a 6-hour gap from 10:00 to 16:00. It is on a small-business time-of-use account, and its $648.20 bill is held in the current cycle.
“Rules raise the exception · agents find the cause · you decide what reaches a bill”
- 02Before the analyst opens it
A communication loss, while the clinic had power
Evidence agent and Root-cause agentThe evidence agent reads 72 intervals, 4 register reads, 3 meter events, the outage log (none) and the weather. Comms were lost at 10:02 and restored at 16:04 with no power-fail event, so the clinic had power. Its collector took a firmware update at 09:58, and 212 meters dropped in the same window. The register moved from 48,171.63 to 48,213.47 kWh. So 41.84 kWh went through the meter in the gap.
Evidence the agents used: “Comms lost 10:02, restored 16:04, no power-fail”
- 03Backtested
Four methods tested on eight past Tuesdays
Estimation agentThe agent hides 10:00 to 16:00 on the meter's last 8 Tuesdays and measures each method's error. Similar day scores 2.8%, an average of 4 Tuesdays 4.9%, a neighboring meter 7.4% and a straight line 11.6%. The Tuesday a week earlier matches on weekday, clinic hours (08:00 to 18:00) and weather, 29°C against 30°C. Swapping to the neighboring meter, a pharmacy on the same transformer, redraws the pale line. It moves the peak band from 15.44 to 14.89 kWh.
Straight line: “09:45 and 16:15 reads · over 2 h not allowed”
- 0408:52 Wednesday
The analyst writes the estimate, tied to the register
MDM analystThe analyst keeps the similar day. That Tuesday's six hours held 40.31 kWh. The estimate is scaled ×1.038 to match the 41.84 kWh the register counted. That gives 26.40 kWh in the shoulder band and 15.44 kWh in the peak band. The analyst approves it with the similar-day reason code, and the $648.20 bill is released to the current cycle.
“The original (missing) reads stay on record. The estimate is written as a new version.”
- 05One batch
211 homes on the same collector, one decision
MDM analystThe other meters on the collector are flat-rate homes with a register read either side of the gap. They have the same cause and need the same method. Each meter keeps its own backtest, a test of the method on its own past days. The median error is 3.1% and the worst is 6.8%. The analyst accepts all 211 as one batch. That sends 211 bills worth $19,855.10 to the current cycle, with no field orders.
“Collector batch written: 211 estimates · 211 bills released to the cycle · 0 field orders”
- 06Rank 2
A multiplier keyed wrong at a meter exchange
Root-cause agentA cold store's daily kWh halved on the day its meter was exchanged, though its refrigeration hours did not change. The installation record says its current transformers (CTs) are 400:5, which means a multiplier of 80. Yet the meter was set to 40. The proposal is to correct the multiplier to 80, rebill from the exchange to the latest read, and check the CTs on site. In all, the store was under-billed by $18,640.32.
“A multiplier change needs a second approver. The meter data supervisor will be asked before the rebill of $18,640.32 goes out, and a CT check goes to meter operations.”
- 07Rank 8 · water
Night flow that does not stop points to a leak in the home
Root-cause agentAt one home, hourly night flow has not fallen below 18 L/h for six days. Daytime use follows the household's usual pattern, and no network leak is reported on the street. The cause found is a probable leak on the customer's side. There is no edit and no field order. The customer gets a leak alert.
“No edit. Send a leak alert to the customer. No field order.”
- 08This week
61 visits instead of 418
Meter operations supervisorThe rules alone would have raised 418 investigations this week. The field-order agent recommends 61, each with the meter, the fault, the evidence and the work type. They cover 6 CT or multiplier mismatches, 14 stuck registers and 4 wiring or reverse-rotation faults. They also include 29 meters silent 7 days or more and 8 tamper events. The other 357 meters are fine. Their exceptions came from communication loss with a consistent register, vacant premises, confirmed outages, unrecorded solar and real usage.
“357 × $250 to $500 per visit = $89,250 to $178,500 not spent this week”
- 0933 hours before cycle close
Cleared bills released before the cycle closes
Billing operations leadThe cycle closes on Thursday at 18:00. With the clinic and the collector batch cleared, the bills held fall from 1,214 ($486,300) to 1,002 ($465,797). The billing lead sees what still holds them, such as gaps, register mismatches and spikes, and the largest bills held. The lead then releases cleared bills to billing.
“Total 1,002 bills · cleared bills are released by the billing operations lead”
- 10Monday 06:00
False alarms stopped at the rule that raises them
Rule-tuning agentEach week the rule-tuning agent groups exceptions by rule and by the cause found. It tests each rule change on 8 weeks of reads. For zero consumption, it proposes skipping premises with a vacant flag or a recorded move-out. That means 1,041 fewer exceptions a night and 0 true faults missed. For missing intervals, it proposes one exception per collector during announced firmware windows, 812 fewer a night. Each proposal goes to the meter data supervisor, who approves it or not.
Spike rule: “−604 exceptions a night · 1 true fault found later by another rule (8 weeks) · residential unchanged”