- Before
- Works the tamper-alarm list and approves 15 to 20 site visits a day. Knows most alarms come from crews, batteries and comms faults. A tamper alarm alone is noise. A cover that opens on the night the load fell is a case.
- Now
- Starts with the overnight suspects. Sees the tamper event, the voltage signature and the break in the load shape on one timeline. Approves each visit with its safety notes.
One meter on a residential street: a cover opens and the load drops
A large utility reads its smart meters across five districts. One Sunday night, the cover of one meter on a residential street opens at 02:13. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0104:10-04:52
Each meter read, each transformer balanced
Interval reader and Energy balancerOvernight, the interval reader collects the night's 15-minute reads and events from all meters. The energy balancer balances each transformer for the last 30 days. 412 are above their expected loss. On one feeder, a transformer serving a residential street delivered 18,600 kWh and billed 16,540 kWh. That is a gap of 11.1% against 3.2% expected, or 1,465 kWh nobody can account for.
“The gap says where. The suspects say who.”
- 02Morning
The suspects chart: one dot far below the cluster
Revenue protection analystThe analyst covers two districts. The home screen plots each of the feeder's 214 meters. It compares a meter's own change in use with its neighbors' change on the same transformer, over the last 7 days against the prior 60. Most meters sit in a cluster on the diagonal band. It was a cooler month, and everyone used a little less. Four meters are suspects. One home scores highest, at 94. It shows red with an amber ring, for a tamper event and a voltage signature together.
One home · Suspect · Bypass suspected · 94/100
- 03Replay
Replay the month and watch one meter break away
Revenue protection analystThe replay runs 29 days. The cluster drifts with the weather. After the night the cover opened, one dot breaks away from it. By the Wednesday, the home already scores 63 and its use is falling while its neighbors hold steady. By last night its use is down 71%, while its 21 neighbors fell 6%.
“Replay · on the Wednesday this meter scored 63”
- 04Ruled out
The honest explanations come off first
ExplainerBefore any score, the explainer checks billing for move-outs. It also checks the solar connections register, work orders, outage records and tariff changes. Last night it cleared 1,161 of the 1,912 meters that fell away from their neighbors. On the same feeder, one home fell 79% but had a recorded move-out. Another fell 61% after rooftop solar was connected. Two cover-open alarms were the utility's own meter work, with no fall in use.
Limit: the explainer never clears a meter with an open tamper event without an analyst. It writes the reason on each clearance.
- 05The case file
94 out of 100, and each point names its source
Signature matcherThe case file lines up the meter events, the evening voltage, the energy used each day and an hour-by-hour heatmap on one time axis. The break is marked. Under the approved scoring version, the fall against neighbors earns 33 of 35 points, and tamper and meter events 25 of 25. The voltage signature earns 18 of 20 and the break in the load shape 14 of 15. Likeness to confirmed cases adds 4 of 5. About 22.2 kWh a day goes unbilled. That is 178 kWh since the break, or $1,870 a year.
“Evening voltage 4.8 V below the neighbors' median since the break, while the metered load is low”
- 06The night it changed
The cover opens, and the load does not come back
Signature matcherThe night zoom shows 15-minute reads from Sunday 18:00 to Tuesday 06:00. At 02:13 the meter cover opens. At 02:14 power goes off at this meter only, for 5 min 12 s. The 21 other meters on the transformer stay on, so the network did not cause it. Power comes back at 02:19 and the cover closes at 02:31. From then on the evening peak is gone, and the voltage at the meter sits below its neighbors'. That means current is being drawn through the service without the meter counting it.
“02:14 Power off at this meter only (5 min 12 s)”
- 07How it was built
Built step by step, and like bypasses already confirmed
Six agentsThe case shows how it was built, agent by agent, with a time on each step. It ends with the visit planner's draft, waiting for the analyst. The likeness check compares the case with 1,184 past confirmed theft cases. One confirmed bypass had $3,120 back-billed and another $2,460. Another 212 had the same pattern.
“cover open + one-meter outage at night + evening sag”
- 08One click
The visit, approved with its safety notes
Revenue protection analystThe visit planner has drafted the work order. It sends a two-person revenue protection crew from 09:30 to 10:30 the next morning, as stop 1 of 6 on the district route. The visit is unannounced, as the supply terms allow. The order lists what to bring: a replacement meter, 4 seals, a clamp meter, a camera and fuse pliers. It also tells the crew that another suspect home on the same transformer is on the route. The analyst approves and schedules it.
“Assume a live bypass. Two-person crew · class 0 insulated gloves · test before touch · isolate at the pole fuse on the transformer before the meter is removed.”
- 09The visits board
Six stops, 42 km, and each result back to its case
Field revenue inspectorThe visits board shows what still needs approval, what is scheduled, which crew is on site now and which results are back. The inspector's route starts at the depot at 08:45 with the home that scored 94. Monday's results are already in. One home had a live jumper across the meter terminals, made safe and sealed with six photos. Another had a magnet. A third had no theft, only a new heat pump, so a scoring note was sent.
“Nothing goes to a crew until an analyst approves it.”
- 10Month end
One number for the board, with each dollar shown
Loss-reduction managerThe manager reads the monthly loss report. In the seven months since go-live, $4.90M has come back, a rate of $8.4M a year. Of 412 visits, 251 found theft, or 61%, against 13% before go-live. This quarter, 37 live bypasses were made safe, each on the day it was found. Loss from theft and billing errors is an estimated 1.1% of energy, down from 1.4% last year. Recovery counts only back-bills paid or on a plan. The manager signs the month.
“The rate since go-live, $4.90M in seven months, gives the same $8.4M a year.”