Read failure history and propose changes to maintenance plans
- Each part's joined history, with sources
- Patterns QA can follow and challenge
- Every machine with the same part
Equipment-related deviation analysis that places each deviation on its asset and part, lays its work orders, calibrations and alarms on one timeline, and carries the fix to every machine with the same part.
See one seal's failures traced screen by screen ↓Maintenance and quality keep two histories of the same machine. The maintenance system holds the work orders and calibrations; the quality system holds deviations whose category says equipment and whose equipment field often names the line, not the machine. The investigator emails maintenance for recent work orders, asks automation for trend screenshots and writes the timeline by hand.
So the investigation stops at the part. It closes as seal wear, seal replaced, and the preventive maintenance plan stays on the calendar it was written with, because changing it needs a change control nobody has the evidence for. The same part on the next machine is left until it fails too, and quarterly trending shows equipment as one bar.
Built forReliability engineersMaintenance managersQA equipment and validation leadsCalibration coordinators
Maintenance and quality keep two histories of one machine, so each deviation closes as wear and the part fails again.
Two histories of one machine
Built-in controls
Maintenance and quality work from one history of each machine, and a finding on one part reaches each machine that carries it.
Reliability engineers, maintenance managers, calibration and QA use these screens to find the part behind repeat deviations and change its plan on every machine that carries it. They follow one high-shear granulator's impeller shaft seal.
demoThe plants, machines, people, records and run-hours in this walk are sample data.
Maintenance and quality each held half of the seal's story; these four read the same joined history before any of them signs.
Read failure history and propose changes to maintenance plans
Own the preventive maintenance program and approve work orders and plan changes
Countersign GMP plan changes and decide requalification
Run the calibration program and start impact checks on failed results
The screens around the seal: what waits for signature, what ranks highest in every plant, what the agents would not place, and the rules behind it all.
demoSample data, from the working solution.
What three investigations on one granulator had closed past, and a near-miss on the sister list.
The seals lasted 17 and 15.3 months, which looks like chance, but failed at 417 and 410 run-hours.
Each weeping was met by raising the purge from 0.5 to 0.8 bar, and a major deviation followed 3 to 4 weeks later, 3 of 3.
A software update widened the torque alarm to 380 N·m, so the last batch reached 361 N·m with no alarm.
The first list of sister machines held a homogenizer with a different seal kit; the challenger struck it before any work order.
demoSample data, from the working solution.
Results pass by name from agent to agent, and the drafts end with the maintenance manager.
Places each equipment-related deviation on its asset and component from the equipment field, the narrative and the equipment log.
Lays work orders, calibrations, historian episodes, changes and deviations for one part on one timeline, with run-hours.
Finds a repeat failure at component level: what came first, at what wear, with sources and confidence.
Asks what an inspector would ask and answers each point from the records, hands it to a person, or corrects the agents' own draft.
Plays the next two years forward under each maintenance plan, with editable assumptions.
Finds every asset with the same part number, with its run-hours and its margin to the trigger.
Drafts the work order and change control with citations and links both to the CAPA.
An equipment-related deviation is one the quality system classes as caused by a machine, an instrument or its upkeep. Here each one is placed on its asset and part and joined to that part's work orders, calibrations, alarms and stops, so a repeat failure shows across deviations instead of inside one.
No. Those tools hold work orders, health scores and failure analysis for maintenance. This solution joins that history to the deviations, held batches and CAPAs in the quality system at component level, and sends any plan change through GMP change control with a QA countersignature.
No. They draft both the work order and change control and link them to the CAPA. The reliability engineer submits, the maintenance manager approves and the QA equipment lead countersigns; no agent writes to the CMMS or the QMS.
No. The failure pattern is evidence for the investigator. The root cause of an open investigation is approved by people in the quality system, and a pattern needs the minimum number of events QA has set.
The reliability engineer can ask QA for a look-back on the batches made between the warning and the deviation. QA decides whether they need an impact assessment; the plant's head of quality dispositions, and the client's own person releases to market.
Bad actor analysis ranks the assets that cause the most trouble. Here each branch of the asset tree is weighted by the deviations, held batches and unplanned stops joined to it, down to the component, so the parts behind repeat quality losses stand out first.
Supplier trust rests on lot evidence, and a drifting certificate is caught before it matters.
1-min demoCost of Poor Quality (COPQ) AnalysisQuality spending decided like any investment, from one signed number every plant trusts.
1-min demoElectronic Logbook Search & Shift HandoverNothing that blocks work is lost between shifts: every handover line opens its logbook entry.
1-min demoSend the deviations, work orders and calibration certificates for one machine, and we will place them on its asset tree and line them up in run-hours.