Run the shift, write and sign the handover, and take over the next one
- A brief written from the logbooks
- Blockers on top with their owner
- Any entry found by asking
Electronic logbook search for plant shift teams: the shift's equipment, room and cleaning logs read entry by entry, and the handover written from them with each line opening the logbook line behind it.
See one night shift handed over screen by screen ↓A GMP plant keeps its running memory in logbooks: a use and cleaning log for each major machine, a log for each processing room, cleaning logs and the supervisor's shift notebook. The rules require them, and a cleaning is finished only when a second person has checked it. Nobody searches them.
At the end of a twelve-hour night the supervisor writes the handover from memory and a notebook, and the incoming supervisor plans the morning from it. Nothing ties a handover line to the entry behind it. A room cleaned but not verified, a machine tagged out or a line stopped under a deviation is found when someone walks up to it, and QA finds the missing signature days later at record review.
Built forShift supervisorsQA shop-floor specialistsProduction managersMaintenance technicians
Logbooks are kept but not read, so the handover is rewritten from memory and what blocks work slips between shifts.
Read by walking the floor
Built-in controls
The plant's logbooks become a searchable memory, and each shift starts from a handover where every line opens its entry.
Shift supervisors, QA and production managers use these screens to hand a shift over from what the logbooks say and to find any entry later. They follow one night in a tablet plant's processing area.
demoThe plant, its shift, the people, machines and logbook entries are sample data.
Two supervisors sign each handover, QA reviews the entries, maintenance owns the tags, and production reads the whole plant.
Run the shift, write and sign the handover, and take over the next one
Review logbook entries before batch record review and approve setting changes
Read handovers across areas and plants and approve brief rules
Tag out equipment, inspect and carry out work orders
What one night's 66 entries held that a handover written from memory could have missed.
The draft said cleaned; the cleaning log's checked-by box was empty, so the 07:30 dispensing waits for a second trained person.
A press stopped at 05:40 for picking punches, the fourth time in 30 days, though its upper punches had just been replaced.
The dryer's supply dew point read 15.7 °C and 15.9 °C against a 5.0 °C setpoint, with the next batch charging at about 06:47.
A granulation room held 8 Pa for 12 minutes against at least 10 Pa; the brief hands it to QA without calling it a deviation.
demoSample data, from the working solution.
The brief ends with the two supervisors; flagged entries end with QA.
Reads the area's e-logbooks for the shift and places each entry on the dial at its minute.
Turns entries into statuses that block work and checks the brief writer's draft against them.
Writes the handover item by item, each line citing its entries, with what it blocks and who owns it.
Answers questions by time, place and meaning and opens the page with the line highlighted.
Flags entries for QA: a missing second signature, a late entry without a reason, an out-of-order entry or a correction without a reason.
Counts what incoming supervisors ask first and proposes rules for the order of the brief.
Around the one night: the run as it happens, the other areas handing over at the same hour, and the controls behind it.
demoSample data, from the working solution.
An electronic logbook replaces the paper equipment, room and cleaning logs a GMP plant keeps for its machines and processing areas. Here an area's e-logbooks are read for each shift, each entry is searchable by time, place and meaning, and the shift handover is written from them with each line citing its entry.
Agents read the shift's logbooks, place each entry on a twelve-hour dial and write the brief item by item. What blocks work, such as a room cleaned but not verified, a tag-out or a line stopped under a deviation, goes to the top as must-read with its owner.
No. Each must-read entry has to be opened and kept open before the sign button works, and any question asked between the two supervisors stays in the signed record.
If a must-read entry arrives before the incoming supervisor signs, the outgoing signature is cleared, the export is marked unsigned and the brief is signed again.
No. It names the event, what it blocks and who owns it. QA decides whether an event is a deviation and when a stopped line restarts, and the assistant answers such questions with the name of the decider.
The area's equipment, room and cleaning logs and the shift notebook, plus the warehouse staging log when a supervisor asks for it. Work order and deviation numbers are read as references; nothing outside the plant's manufacturing and quality records is a source.
From reading numbers aloud to deciding: risks reach the person who can act the same morning.
1-min demoGolden Batch AnalysisEvery engineer sees what the best batches knew, and each explained difference becomes a watch.
1-min demoYield Loss AnalysisEvery lost tablet traced to the record that explains it, and recurring losses fixed once, on every line.
1-min demoSend the equipment, room and cleaning logs of one area for one shift, and we will place them on a dial and write the handover with each line cited.