Keep supplier files and scorecards, change testing levels and send corrective action requests
- Certificates tested against the plant's own lab
- Objections answered before the request goes
- Answers in fields they can compare
A supplier quality scorecard built only from lot evidence: each supplier's certificate of analysis set beside the plant's own full test of the same lot, and each lot followed into the batches that used it.
See one supplier's certificates tested screen by screen ↓Reduced testing lets the plant accept most lots of a component on the supplier's certificate plus an identity test. It is defensible only while the plant shows, at intervals, that the certificate can be relied on. In practice the periodic full test is checked against the specification rather than the certificate, so a certificate that reads one point low passes year after year.
The annual supplier review is a spreadsheet of on-time delivery, deviations and audit status, rated once. Lots the plant never tests are accepted on numbers that are not the lot's. A longer drying time in production is never traced back to the filler, and the gap surfaces at an inspection or at a client's audit of the CDMO's supplier control.
Built forSupplier quality specialistsHeads of qualityQC incoming materials analystsProcess engineers
Lots pass on the supplier's certificate, and the periodic full test is checked against the limit instead of the certificate.
Rated once a year, in a sheet
Built-in controls
Supplier trust rests on lot evidence, and a certificate that drifts is caught before more lots are accepted on it.
Supplier quality, QA, QC and process engineering use these screens to test whether a supplier's certificates can be relied on and to act when they cannot. They follow one microcrystalline cellulose filler on reduced testing.
demoThe CDMO, its suppliers, clients, people, lots and results are sample data.
A testing change starts in supplier quality, gets the head of quality's second signature, is enforced at the QC incoming bench, and leans on process engineering for anything about batches.
Keep supplier files and scorecards, change testing levels and send corrective action requests
Approve testing levels, rules and settings, and countersign changes
Test identity on each container and run full tests at receipt
Judge whether a supplier lot shows up in batch process data
The specialist acts on what they find; the head of quality signs second.
Reads supplier certificates and the plant's LIMS results and pairs them lot by lot, attribute by attribute.
Follows supplier lots into batches, drying times, deviations and OOS results.
Builds the six score rows from cited records and proposes rules from rulings.
Argues the supplier's side on method, storage and sample size, then tests the agents' own draft.
Builds the corrective action request from fixed fields the specialist chooses.
Reads the supplier's answer from its fixed fields and attachments and compares the results with the plant's own.
Four findings from one filler's two years of lots that an annual rating had recorded as reliable.
All 6 full tests read 0.9 to 1.4 points wetter than the certificate, while each result passed the 7.0% limit.
The first count of 7 pairs included a 12-month retest of an opened bag; taken out, the mean gap is 1.1 points.
The two wettest lots went into 7 batches that dried 37 to 40 min against a median of 34, an association for the engineer.
The approved rule flagged a starch supplier whose 6 of 6 full tests read 0.4 to 0.7 points above its certificates.
demoSample data, from the working solution.
Around the one filler: what the agents first concluded, how every supplier scores, and the rules the head of quality controls.
demoSample data, from the working solution.
A supplier quality scorecard rates each supplier on quality evidence. Here each row is built from records you can open: the certificate of analysis beside the plant's own full test of the same lot, first-time acceptance, deviations and OOS results, delivery, change notices and audit status.
A manufacturer may accept a supplier's report of analysis in place of full testing, with an identity test on each lot, only while it shows at intervals that the supplier's results can be relied on. This solution makes that check against the certificate value itself, lot by lot, instead of against the specification limit.
The supplier quality specialist ends reduced testing at once, and a deviation opens for the certificate discrepancy. The head of quality opens the reason and the evidence, then countersigns, the score drops, and a corrective action request in fixed fields goes to the supplier.
From its fixed fields and attachments. A typed comment is held unread until the specialist opens it, an answer missing results or printouts can only be returned, and accepting an answer is the specialist's decision.
No. They read, pair, link and draft. The specialist changes the testing level and sends requests, the head of quality signs second and approves rules and settings, and nobody approves their own change.
Certificates, the plant's own lab results, receipts and deliveries, deviations and OOS results, audits and change notices, and no record outside them. A later result changes the draft only; the published score stays as the head of quality countersigned it until the next countersignature.
Quality spending decided like any investment, from one signed number every plant trusts.
1-min demoElectronic Logbook Search & Shift HandoverNothing that blocks work is lost between shifts: every handover line opens its logbook entry.
1-min demoTier Meeting ManagementFrom reading numbers aloud to deciding: risks reach the person who can act the same morning.
1-min demoSend two years of a supplier's certificates and your periodic full tests for the same lots, and we will pair them and show whether the certificate holds.