WorkflowHealth, Safety & Environment

Contractor Safety Prequalification

Contractor safety prequalification that checks every crew against its documents before the crew is dispatched

See one case, screen by screen ↓
Watch with transcript →

Built forContractor safety managersProcurement managersInsurance analystsSite supervisorsSafety directors

The Problem Today

Each package is read once when a contractor joins. After that nobody watches the dates, so crews arrive on lapsed certificates.

~22
deaths per 100,000 line installers in 2021, against 3.5 overall published
½ day
to read one package of 9 to 15 documents by hand our estimate

Each with its own expiry date

  • Insurance
  • Injury logs
  • License
  • Crew cards
  • Gap letters written by handWritten one by one, then chased by email
  • Booked without a checkPlanners book crews without seeing the certificates

The Solution

  1. Each document readInsurance, injury logs, licenses and training read, and injury rates worked out again
  2. Graded by work typeEach rate, limit and crew card checked against your limits for that work
  3. Each date checked again dailyThousands of dates each morning. Amber near expiry, red once it lapses
  4. Uncovered work is heldWork booked for the next two weeks is checked. Lapsed cover holds the job

Built-in controls

  • The safety manager signs each grade
  • Only the HSE director overrides a hold
  • Each value opens the page it was read from

What You Get

Fewer contractor jobs stall at the gate, and fewer crews reach your network on lapsed cover.

  • Gap letters draftedOne numbered gap per check, with its rule and due date
  • Each crew member checkedEach person's cards checked against the work type, on the start day
  • New contractors start soonerour estimateA package waits 1 day for review, down from 10
In short

What is Contractor Safety Prequalification?

It is how a utility checks that a contractor is fit to work on its network before any crew arrives. The contractor must be insured to the contract limits and licensed, with a written safety program. It needs an acceptable safety record, measured by EMR, TRIR, DART and deaths at work. Its crew must be trained for the work. Contractor Safety Prequalification gives each contractor a passport, where each proof is a stamp. Each stamp is read from the document and checked against your limits for each work type.

How to choose AI solutions for utilities →

Updated

The problem

Utilities check contractor safety papers once, then nobody watches them expire

Utilities bring in contractors to work on their networks. Before a crew starts, the contractor safety team has to know the firm is fit for the work. It must be insured to the contract limits and licensed, with a written safety program. Its safety record must be acceptable. That record is measured by EMR, an insurer's score of the firm's injury history. TRIR and DART, its injury rates, count too, and so do deaths at work. And each person on the crew must hold the training cards the work needs. The proof comes as a prequalification package of 9 to 15 PDFs. It holds insurance certificates, the rating letter, three years of injury log summaries and the license. It also holds the safety manual, training cards, a method statement and a questionnaire. A reviewer reads them once, when the contractor is first taken on.

After that, each document expires on its own date. Across all contractors that adds up to thousands of dates, and nobody watches them every day. Planners book crews in the work management system, but the contractor's safety records live somewhere else. So a crew can be sent out on a lapsed certificate. The risk lands on the utility too. For electric work, the rule 29 CFR 1910.269(a)(3) makes the utility, as host employer, tell each contractor the hazards it knows of before work starts. Under OSHA's multi-employer citation policy, the utility can be cited as the controlling employer, the one in charge of the work, for a contractor's hazard.

typical~5×the death rate at work across all jobs, for electrical power-line installers and repairers
typical~22per 100,000power-line installers and repairers died at work in 2021, against about 3.5 for all workers
Where a new contractor's days go before it is approvedestimated
By hand29.5 days
With the solution13.7 days
  • Package waiting for a reviewer10 → 1 d
  • Reading 9 to 15 documents and checking them against the limits0.5 → 0.1 d
  • Writing the gap letter and sending it2 → 0.1 d
  • Contractor closing the gaps14 → 12 d
  • Re-checking the new documents and signing the grade3 → 0.5 d

Our estimated split of one new contractor's prequalification, in calendar days, by hand and with the solution. By hand, the review itself takes about half a day, for 9 to 15 documents at 15 to 30 minutes each. With the agents it takes a median of 19 minutes. The contractor's own time to close the gaps barely changes.

How it works

Contractor safety checks from package in to crew dispatched

What comes in
Proofs in9 to 15 documents · insurance, safety record, licenses, training
Agents at work
Document readervalues + passages
Then
Threshold checker
Crew qualification checker
Then
Expiry watcherevery morning
Work-order gate
Then
Gap letter writercited draft
A person decides
Contractor safety managersigns every grade
What comes out
Passport issued
Work orders gated
Reminders sent
One case, step by step

A ten-day insurance warning, a verified renewal and a held water main job

A utility hires 184 contractors for line work, water mains, substations, vegetation, traffic control and plant work. Today one line contractor's insurance has 10 days left. Its crew is booked for energized work on a feeder four days after that. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Before 07:00

    Each contractor has a passport, and each proof is a stamp

    Contractor safety manager

    Each contractor's record is a passport, and each proof on it is a stamp. The contractor safety manager looks after 184 passports and signs each grade. This line contractor is approved for overhead distribution, energized work up to 35 kV, and underground cable and jointing. Its safety record is inside the utility's limits: EMR 0.82 against 1.00, 3-year TRIR 2.1 against 2.5 and DART 1.1 against 1.5. It has had no deaths at work in three years. All 12 stamps are verified. They cover insurance, the rating letter, injury logs, the license, three crew-training stamps, dielectric tests, the method statement and the safety program.

    “Valid. All 12 stamps verified. Last check yesterday 07:00 · today’s check runs at 07:00.”

  2. 02One click

    Each stamp opens the document it was read from

    Document reader

    The general liability and umbrella stamp opens the certificate from the contractor's insurance broker. It shows one insurer and a general liability policy at $5,000,000 for each occurrence. On top sits an umbrella policy, extra cover, at $10,000,000, with the utility named as an additional insured. The one-year policy period ends in 10 days. That date is highlighted on the page, beside what the agents checked.

    What the agents checked: “Each occurrence ≥ $5M ✓ · Umbrella ≥ $10M ✓ · Utility named additional insured ✓ · Expires in 10 days”

  3. 0307:00

    Today's check turns one stamp amber and tells two people

    Expiry watcher

    The morning check reads 3,912 dates on 184 passports and compares each one with today. Four documents reach 30 days left, and one reaches 10 days. That one is the line contractor's certificate, so its stamp turns amber. The 10-day reminder goes to the contractor's safety director and its broker. It carries the renewal link and the limits the renewal must meet.

    From the reminder: “The energized reconductoring work order on the feeder starts four days after your certificate ends. Unless a renewed certificate is verified, it will be held at 00:00 the day after expiry.”

  4. 0407:01

    The feeder job is marked at risk before anyone is dispatched

    Work-order gate

    The work order is energized reconductoring, replacing the wires on 1.8 km of the feeder, with a crew of five lineworkers. It starts at 07:00, four days after the certificate ends, so the gate marks it at risk. The expiry calendar shows the same picture from the other side. It lists 37 documents expiring in the next 30 days across 26 contractors, and 10 of them within 10 days.

    From the run log: “Starts after the expiry · at risk · held at 00:00 the day after expiry unless the renewal is verified.”

  5. 0510:20

    The renewal arrives and the safety manager stamps it again

    Contractor safety manager

    The broker sends the renewed certificate, and the document reader checks it. The insured and address are the same. Cover is $5M for each occurrence with a $10M umbrella, and the utility is named as an additional insured. There is no gap in cover for the next year. At 10:31 the safety manager accepts it. The stamp is verified for another year, and the feeder work order is cleared.

    The agents report what they found. Only the safety manager accepts a document.

  6. 06Same morning

    A civil contractor’s cover has lapsed, so tomorrow’s water main job is held

    Work-order gate

    A civil contractor's general liability certificate expired four days ago. The 30-day and 10-day reminders went out, and no renewal came. So its passport is blocked. Its work order, replacing a 300 mm water main from 07:00 tomorrow, is held.

    “Blocked. General liability certificate expired. Work orders for this contractor are held.”

  7. 0707:01, each day

    The planners see what can start, and why the rest cannot

    Work planners

    Each morning the gate reads every contractor work order for the next two weeks from the work management system. With the line contractor cleared, 260 are cleared, 5 are at risk and 3 are held. One held job is the water main. Another is a traffic contractor's lane closure, on an auto liability certificate that expired two days ago. The third is a pole inspection on another feeder, by a pole-testing contractor whose EMR of 1.42 fails the overhead limit. Each row says why, and at-risk rows carry a reminder button.

    “Gate runs at 07:00 and whenever a work order is booked · holds lift only on a verified document or an HSE director override”

  8. 08If work must go ahead

    Only the HSE director releases a hold, with a reason and an end date

    HSE director

    The safety manager can ask for an override on a held work order. The request goes to the HSE director, the head of health, safety and environment, with a written reason and an end date. Until the director decides, the work order stays held. The day before, the director had already turned one down for the water main job.

    The HSE director declined the override for the water main job: “No work without cover.”

  9. 09A new package

    A vegetation contractor’s 11 documents, graded by work type

    Document reader, Threshold checker, Crew qualification checker

    A vegetation contractor sent 11 documents through the contractor portal. It wants to work near energized lines and run its own traffic control. The agents read 149 pages and work out TRIR and DART again from the cases and hours. The results are a 3-year TRIR of 2.6, DART of 1.4 and no deaths. Four things fall short. The EMR is 1.18 against 1.00, and the umbrella is $5M against $10M. Only 19 of 22 climbers hold a line-clearance tree trimmer certificate. And the safety program covers 13 of 15 elements. So the proposed grade is conditional for vegetation work and pass for traffic control.

    The safety manager signs the grade with its meaning: “I reviewed the documents and the agents’ checks and approve this grade.”

  10. 10Signed 11:05

    The gap letter lists each gap with its rule, document and due date

    Gap letter writer

    The letter goes to the vegetation contractor's HSE coordinator and lists four gaps. First, the umbrella must rise to $10M before the first work order. Second, the EMR of 1.18 needs a corrective action plan by a set date. Third, the three climbers need line-clearance tree trimmer certificates before they work on a utility feeder. Last, the safety program must add minimum approach distances and electrical hazard training by the same date. The safety manager can edit anything before sending it through the portal.

    “Until the umbrella certificate is verified, no vegetation work order near energized lines can start. Traffic control work can be booked now.”

Who it’s for

Contractor safety prequalification for the people who clear each crew

Five people answer for each contractor on the network. Here is their week by hand, then with the passport.

Contractor safety manager
Signs grades and gap letters
Before
Looks after 184 passports and answers to the HSE director for each contractor on site. Learns that a certificate lapsed when the crew is already in the trench.
Now
Opens the passports that need attention first. Each stamp was checked again at 07:00, the reminder is already sent and the work order already marked.
HSE director
Approves overrides of held work
Before
Approves overrides and reports contractor incidents to the board. Wants to know that any crew on a feeder was cleared that morning.
Now
Sees held work orders with the reason. Is the only person who can release one, with a reason and an end date on the record.
Risk and insurance analyst
Reviews insurance exceptions
Before
Reads certificates of insurance against contract limits, and finds half of them name the wrong insured or the wrong limits.
Now
Opens each certificate at the passage it was read from. Insured, insurer, limits, period and additional insured are each checked against the minimum for the work type.
Procurement category manager
Onboards new field-services contractors
Before
Onboards new contractors and needs answers in days. Meanwhile a good contractor waits six weeks for a yes.
Now
Sees each new package read and graded by work type, with the gap letter drafted and ready for the safety manager to sign.
Site supervisor
Approves method statements
Before
Meets contractor crews at the depot gate, and needs to know before 7 a.m. who can be let through.
Now
Sees each contractor work order for the next 14 days as cleared, at risk or held, with the reason, before the crew arrives.
The agents

Document, threshold, expiry and gate agents in contractor prequalification

Six agents read the documents, check the limits, watch the dates and gate the work orders. The safety manager signs.

Document reader

Reads certificates of insurance, rating letters, injury logs, licenses, training cards and method statements. Pulls out each date, limit and rate with the passage it came from. From insurance, that is insured, insurer, policy number, limits, period and additional insured. From safety records, it takes the EMR and rating year, and the cases and hours it uses to work out TRIR and DART again.

  • Each value carries its page and passage
  • If a value is not on the page, it says so and never infers one
  • Never accepts a document. It reports what it found
  • Reads only the contractor named on the package
Threshold checker

Compares the contractor's EMR, 3-year TRIR, DART, deaths, insurance limits and training with the utility's limits for each work type it asks for. Grades each one pass, conditional or fail, with the reason.

  • Proposes a grade. The contractor safety manager signs
  • Never changes a threshold
Crew qualification checker

Matches each crew roster with the training cards the work type needs, person by person, on the start day. The cards include qualified electrical worker, first aid & CPR, pole-top and bucket rescue, confined space, flagger and line-clearance tree trimmer. Lists anyone who is not covered.

  • Never adds a person to a roster
  • Names people only to the contractor and utility staff
Expiry watcher

Each morning at 07:00, compares each date on each passport with today. At 30 days it sends the first reminder to the contractor and its broker. The stamp turns amber at 10 days, with a second reminder. At expiry the stamp turns red and the work-order gate is told.

  • Never extends a date
  • Never accepts a renewal. The document reader checks it
Work-order gate

Checks each contractor work order in the next 14 days against the passport for its work type and start date. It runs each morning and whenever a work order is booked. Work that is not covered is held in the work management system, and the planner is told why. Work is marked at risk when a stamp ends before the start.

  • Can hold but never release. A verified document or the HSE director’s override releases a hold
  • Holds only contractor work orders
Gap letter writer

Drafts a short letter to the contractor in plain words, from the failed and conditional checks. Each check becomes one numbered gap, with the rule, the document it came from and a due date.

  • Never sends without the contractor safety manager
  • No gap without its rule and source
Contractor safety manager

Signs grades, and only the HSE director releases a hold.

Ask in plain words

Contractor questions on a passport, a document or a held work order

Ask about any contractor, document or work order, or say what to change. Each answer points to the document behind it. These answers use the sample data.

Which crews can’t start in the next two weeks?

Of the 268 work orders booked, 3 are held and 6 are at risk. The civil contractor's water main is held because its general liability expired. The traffic contractor's lane closure is held on expired auto liability. The pole-testing contractor's inspection is held on an EMR of 1.42. At risk is the line contractor's feeder job, which starts four days after its certificate ends.

Why is the line contractor’s insurance stamp amber?

Its general liability and umbrella policies end in 10 days. This morning's check turned the stamp amber. It sent the 10-day reminder to the contractor's safety director and its broker. Its safety record is well inside the limits, with EMR 0.82 and 3-year TRIR 2.1.

Tighten the EMR limit for energized work to 0.90

Done, as a draft for your sign-off. For energized overhead, underground and substation work, the draft sets the EMR limit at 0.90, down from 1.00. One current contractor would move to conditional: a directional drilling firm at 0.97, for underground cable. Two others, at 0.82 and 0.88, would still pass.

Draft the gap letter for the vegetation contractor

Drafted, with 4 gaps. The umbrella is $5M against $10M required. An EMR of 1.18 needs a corrective action plan. Three climbers lack line-clearance certificates, and 2 program sections are missing. Each gap names the rule and a due date. The letter is waiting for you to send.

The screens

The contractor passport, a lapsed certificate and the work-order gate

From the working solution, on its sample data. Pick one to see it large.

The contractor passportOne line contractor's passport. It shows the endorsed work types, the safety record against the utility's limits and 12 dated stamps. The morning check, work orders and reminders sit beside it.
The document behind a stampA certificate of insurance as read, with insured, insurer, limits, policy period and additional insured. Beside it is what the agents checked.
Today’s check, step by stepThe 07:00 run. It read 3,912 dates, turned one stamp amber, sent the 10-day reminder, checked 268 work orders and marked the feeder job at risk.
The expiry calendarAll dates on all passports, 13 weeks ahead. It shows the 30-day, 10-day and expiry clock, and the day's documents and work at risk.
A renewal verifiedThe renewed certificate checked for insured, limits, additional insured and gaps in cover. The safety manager accepts it and the work order is cleared.
A blocked passportA civil contractor's passport. The general liability stamp has been red since it expired, the reminders went unanswered and its water main work order is held.
The work-order gateAll contractor work orders in the next 14 days, cleared, at risk or held, with the reason and the next action.
Request an overrideA held work order released only by the HSE director, for a stated reason and until a set date.
The approved contractor registerEach contractor’s grade (pass, conditional or fail) across eight work types, its passport state, next date, EMR and TRIR.
A prequalification reviewA vegetation contractor’s 11 documents, each value with its source and limit, and the proposed grade by work type, ready to sign.
The gap letterFour gaps, each with its rule, the document it came from and a due date, ready to edit and send through the contractor portal.
The program dashboardPassports by state, documents renewed before the date, crews dispatched on an expired passport, review time, EMR across the register and the most common gaps.
The standardLimits and insurance minimums by work type, required training, the reminder clock, the work-order gate and who decides.
Governance

Cited stamps, signed grades and contractor safety holds on the record

A stamp only from a document it can citeEach stamp and each extracted value links to its document and page. That may be the certificate, the rating letter, the injury log summary or the training register. A reviewer opens it at the passage it was read from.
The safety manager signs each gradeGrades and gap letters need the contractor safety manager's signature. Its meaning is recorded with it: “I reviewed the documents and the agents’ checks and approve this grade.” Agents propose. They do not sign.
Agents hold work but do not release itThe work-order gate can hold a contractor work order before dispatch. A hold lifts only on a verified document or the HSE director’s override, with a stated reason and an end date.
Agents read and people acceptNo agent accepts a document, extends a date, changes a threshold or adds a person to a roster. A renewal is re-stamped only when the safety manager accepts it.
Each contractor sees only its own passportThrough the contractor portal, a firm sees its own stamps, their dates, what is missing and the upload button. It does not see other contractors or the utility's limits for other work types. Contractor documents stay in the utility's own environment.
Each check and decision on the recordEach 07:00 check, each hold, each reminder and each human decision is kept on the activity trail with its time. That includes who signed a grade, who declined an override and why. Changes to the limits need the HSE director's sign-off.
Configuration

EMR, TRIR and insurance limits by work type, signed off by the HSE director

The limits by work type, the insurance minimums, the reminder clock and the gate are settings. Changing them needs the HSE director's sign-off.

SettingDefaultChoose from
EMR limit, energized overhead, underground and substation work1.00Set per work type. The limit is 1.00 for energized and vegetation work, and 1.10 for civil, water mains, meter and traffic work. From 1.00 to 1.25 is conditional with a corrective action plan, and above 1.25 fails.
3-year TRIR limit2.52.5 for overhead, underground cable and substation · 3.0 for vegetation, civil, water mains, meter and traffic work
DART limit1.51.5 for overhead, underground cable and substation · 2.0 for the other work types
Insurance minimums, general liability and umbrella$5M each occurrence · $10M umbrellaEnergized and vegetation work: $5M and $10M. Civil and water: $5M and $5M. Meter and traffic work: $2M and no umbrella.
Required training, overhead distributionQualified electrical worker · first aid & CPR · pole-top and bucket rescueSet per work type. Water mains need confined space entry, trench safety and a water hygiene card. Traffic management needs a certified flagger and work-zone traffic control.
Reminder clock30 days · 10 days · at expiryFirst reminder at 30 days. Stamp amber and second reminder at 10 days. Stamp red and work held at expiry. The contractor and broker are told.
Work-order gateOn for every work typeOn · Off per work type. Turning it off is a draft until the HSE director signs. Looks 14 days ahead, runs at 07:00 and on booking, and holds at 00:00 the day after expiry.
Who decidesContractor safety manager · HSE directorContractor safety manager signs grades and gap letters · HSE director approves overrides of a held work order
Connections

Certificates, rating letters, training cards and the work management system

Certificates of insurancegeneral liability, umbrella, auto and workers’ compensation, with limits, periods and additional insured
Safety recordsEMR rating letters and three years of injury log summaries, with cases and hours
Licences and training cardscontractor licenses checked with the licensing board, crew rosters and each card by person
Safety programmes and method statementsrequired program elements, method statements and prequalification questionnaires
Work management systemcontractor work orders for the next 14 days, read and held before dispatch, planners told why
Contractor portal and brokerspackages and renewals in, reminders and gap letters out to the contractor and its broker
What it changes

Crews cleared before dispatch, and packages reviewed the same day

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of contractor work orders checked against the passport before dispatch
268 of 268
work orders in the next 14 days
target
30days
warning before any certificate lapses, red and held at expiry
Todayfound at the gate
With agents30 days ahead
target
19min
to review a prequalification package, so a good contractor hears the same day
By handabout half a day
With agents19 min

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” is our estimate: half a day by hand, for 9 to 15 documents at 15 to 30 minutes each. “typical” means published figures from the BLS Census of Fatal Occupational Injuries. Power-line installers and repairers died at about 18.6 per 100,000 in 2017 and about 22 in 2021, against about 3.5 for all workers. Regulatory context: OSHA multi-employer citation policy (CPL 02-00-124), 29 CFR 1910.269(a)(3) and ISO 45001:2018 clause 8.1.4.2. Names on the screens are sample data.

Questions

Contractor safety prequalification questions from utility HSE teams

What is contractor safety prequalification?

It is how a utility checks that a contractor is fit to work on its network before any crew arrives. The contractor must be insured to the contract limits and licensed, with a written safety program. It needs an acceptable safety record, measured by EMR, TRIR, DART and deaths at work. Its crew must be trained for the work. Contractor Safety Prequalification gives each contractor a passport, where each proof is a stamp. Each stamp is read from the document and checked against your limits for each work type.

How does contractor prequalification software work with agents?

Six agents share the work. The document reader pulls out each date, limit and rate with its passage. The threshold checker and the crew qualification checker grade the contractor by work type. Each morning at 07:00, the expiry watcher checks each date again. The work-order gate checks the next 14 days of work orders, and the gap letter writer drafts what is missing. The contractor safety manager signs each grade.

Does it track certificate of insurance expiry dates?

Yes, along with the other dates on the passport: rating letters, licenses, training cards, dielectric tests and safety programs. The first reminder goes to the contractor and its broker at 30 days. At 10 days the stamp turns amber and a second reminder goes out, and at expiry it turns red. In the sample program, 389 of 412 reminded documents were renewed before they ended.

How does it stop a crew being dispatched on an expired certificate?

The work-order gate reads each contractor work order in the next 14 days from the work management system. It runs each morning and whenever a work order is booked. If a stamp the work type needs has expired or failed on the start date, it holds the work order and tells the planner why. If a stamp ends before the start, it marks the work at risk. A hold lifts only on a verified document or the HSE director's override.

Can we set our own EMR, TRIR and insurance limits by work type?

Yes. You set the EMR, 3-year TRIR and DART limits, the EMR fail line, the general liability and umbrella minimums, the required training and the gate. Each is set per work type. The work types are overhead, underground cable, substation, vegetation, civil, water mains, meter work and traffic control. Changes need the HSE director's sign-off.

Can a planner dispatch a held crew if the renewal is on its way?

No. A hold lifts only on a verified document or the HSE director's override, with a reason and an end date. The agents read, check, remind and hold. They do not sign a grade, accept a document, change a threshold, add a person to a roster or release a hold. The contractor safety manager signs grades and gap letters.

What does a contractor see?

Only its own passport, through the contractor portal. It sees each stamp, its date, what is missing and the upload button. Other contractors and the utility's limits for other work types stay hidden from it.

Which documents and settings do we provide to start?

You provide your contractor safety standard, insurance minimums, work types and a sample of contractor packages. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own contractors first.

Test contractor safety prequalification
on your own packages.

We’ll run Contractor Safety Prequalification on a sample of your own contractor packages and work orders.