- Before
- Owns the inventory, closes each quarter and answers the assurer from spreadsheets, re-keyed invoices and cylinder logs.
- Now
- Opens the inventory as one chart, posts what the agents have read and checked, and releases evidence packs. Wants each tonne to trace back to a page someone can open.
A handwritten SF6 cylinder log, read overnight and posted to Scope 1
The utility runs power and water networks. Three days after its third-quarter close, a substation supervisor's handwritten cylinder log has been scanned overnight. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning
The inventory opens as one live chart
Sustainability reporting leadThe reporting lead owns the inventory, and the home screen shows it as one chart. On the left, 13 sources flow into Scope 1, Scope 2 (location-based) and Scope 3. From there they flow on to gross emissions for the year to date. Beside the chart, two records read this morning wait to be posted. The totals feed the IFRS S2, GRI 305-2 and CDP 7.8 lines.
Each tonne runs from its source, through its scope, to the disclosure total, with the Q3 close done
- 02One switch
Each flow colored by how good its data is
Sustainability reporting leadThe Color by data quality switch recolors the chart. Each flow is measured by a meter or stack monitor, calculated from activity records with a factor, or estimated from spend, population or averages. In this inventory, 55.8% of the total is measured, 35.8% calculated and 8.4% estimated. The weak flows stand out. They are capital goods, freight, wastewater treatment and most of purchased goods.
Assurers sample hardest where data is estimated.
- 03The afternoon before
A density alarm leads to a top-up and a paper log
Substation maintenance supervisorAt one substation, a breaker in bay 4 raises a stage 1 density alarm. It warns that the breaker's SF6 is running low. The supervisor tops it up from a cylinder and writes it on the cylinder log. The cylinder weighed 41.362 kg before and 41.183 kg after. Gas pressure rose from 5.9 to 6.4 bar g at 20 °C. The scan reaches Source records at 09:12 the next morning. It joins 1,486 records read this quarter.
“Nothing reaches the inventory without its record”
- 0409:12
The handwriting read, the breaker and cylinder matched
Source reader and SF6 balance keeperThe Source reader reads 11 handwritten fields with 0.99 confidence. It checks the 3 in 41.183 against the photo of the scale. The SF6 balance keeper finds the breaker in the asset register. It is a gas-insulated (GIS) breaker that holds 18.6 kg when full. The cylinder matches too, issued by the gas supplier at 41.940 kg. A 0.5 bar rise on 18.6 kg should take 0.17 to 0.19 kg of gas. The 0.179 kg used fits.
The Source reader marks any value it cannot read. Reads below 0.95 confidence go to a person.
- 0509:13
4.2 tCO₂e, and the third top-up this year
Factor matcher and Quality checkerThe Factor matcher applies a GWP of 23,500 (IPCC AR5). So 0.179 kg is 4,206.5 kgCO₂e, or 4.2 tCO₂e. The Quality checker finds two earlier top-ups on this breaker this year. One was in March (0.164 kg) and one in June (0.171 kg). Together that is 0.514 kg, 12.1 tCO₂e and 2.8% of its charge. That crosses the utility's leak rule, so the checker drafts a leak repair order. The order calls for a gas-camera leak search at the next planned outage. If the leak is confirmed, the bay 4 density monitor gets a new seal.
Leak rule: “3 top-ups in 12 months or 2% of charge a year”
- 0609:31 · posted
The repair sent, then the tonnes posted
Sustainability reporting leadThe reporting lead sends the repair order to the compliance engineer for approval. Then the lead posts the log. The SF6 flow pulses with “+4.2 tCO₂e · SF6”. SF6 rises from 1,842.6 to 1,846.8 tCO₂e, and Scope 1 and gross emissions count up with it. No agent can post. The record waited for a person.
Checks: third top-up this year, 2.8% of charge. Repair order sent to the compliance engineer.
- 07Any tonne
The lineage, one record at a time
Group financial controllerOpen the activity data and each record shows its chain. It starts at the cylinder log. Next is the 0.179 kg read from the supervisor's handwriting. Then comes GWP 23,500 from factor set 2025, giving 4.2 tCO₂e, checked by the Quality checker. The chain ends at IFRS S2 29(a)(i) and GRI 305-1. Below sits each cylinder log this year, with its activity, factor and status.
As in the ledger, nothing is posted without a document.
- 08Mass balance
SF6 kept by mass balance, breaker by breaker
Environmental compliance engineerThe SF6 screen tracks the gas across the substations and their breakers with a four-part mass balance. Storage went down by 21.400 kg. The utility bought 260.000 kg and returned 120.000 kg to the supplier. It charged 82.811 kg into new equipment. That leaves 78.589 kg emitted. Times 23,500, that is 1,846.8 tCO₂e. Breakers are ranked by gas lost against the 2% line. This breaker is at the top, with two more being watched.
Breakers ranked by gas lost this year. Repair at 3 top-ups in 12 months or 2% of charge a year. The repair for this breaker has been sent.
- 09Draft, year to date
The IFRS S2, GRI 305 and CDP drafts follow the inventory
Disclosure drafterEach figure in the drafts comes live from the inventory and opens the flow behind it. The IFRS S2 paragraph 29 table picks up the new gross Scope 1. The draft text says each SF6 top-up is traced to a signed cylinder log. Four people sign off in turn. The reporting lead prepares, the compliance engineer reviews, the head of sustainability signs and the group financial controller co-signs. A panel lists what changed since the last review.
The Disclosure drafter writes the text. People publish and sign. A change after review reopens the chain.
- 10The assurer asks
The cylinder log is one click away
Evidence packer · for the assurerThe assurer's sample request is due within the week. It asks for each top-up of this breaker this year, the mass balance and the GWP. The Evidence packer has six items ready. They are the three cylinder logs, the four-part mass balance, the approval of factor set 2025 and the postings. The pack could not leave until today's log was posted. Now the reporting lead releases it.
The request asks for the cylinder logs for each top-up of this breaker this year, the SF6 mass balance and the GWP used.