- Before
- Leads a crew of four plus contractors. On site the crew lead pages a binder or a PDF on a phone, or radios the control room and waits. All they need before anyone climbs is one number from a 186-page book.
- Now
- Asks at the pole and gets the ruling, the limit and the clause in about two seconds. The answer shows what would make the job allowed under the crew lead's own authorization. The crew lead then pins it to the briefing the crew acknowledges.
A cross-arm change beside a live 11 kV line, ruled on before anyone climbs
It is 07:42 on a working morning. A line crew is changing a cross-arm on a pole beside a feeder line live at 11 kV. Their MEWP, a mobile elevating work platform, will put a lineman about two meters from the nearest live wire. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0107:42
The ruling comes first, and it is NO
Overhead line crew leadThe crew lead types or says, “Can I work 2 m from an 11 kV conductor?” The solution already knows the job. It knows the pole, the feeder live at 11 kV, the cross-arm change from a MEWP and the crew lead's high-voltage overhead authorization. The phone also holds an offline copy of Rev 9. The answer leads with a red NO and the limit, a minimum of 3.0 m without barriers. Then comes the source: Electrical Safety Rules, Rev 9, Rule 4.3.2, with the date it came into force.
“At 2.0 m you would be 1.0 m inside the safety distance for 11 kV.” · Ruling in 1.8 s
- 02Drawn to scale
The limit, the ways the job becomes allowed, and the rule word for word
Ruling writer and Rule checkerA gauge draws the conductor, the 0.8 m barrier line, the 3.0 m limit and the 2 m asked about. Under it are three ways the work becomes allowed, each with its own rule. First, the feeder is made dead and grounded under a Permit to Work (Rule 6.1). Second, an Authorized Person fits insulating barriers, and the limit drops to 0.8 m (Rule 4.4). The crew lead's authorization covers that. Third, the live-line team does live work under Rule 4.5, which needs a live-line authorization. Rule 4.3.2 is quoted with Table 4.1 and its 11 kV row highlighted.
Live work needs a live-line authorization. The crew lead's overhead authorization does not cover it.
- 03In the rulebook
The clause in its place, and what Rev 9 changed
Rule finderOne click opens Section 4 of the Electrical Safety Rules at page 47, with Rule 4.3.2 highlighted. The margin says the rule was asked about 37 times in the last 7 days. It notes that Rev 9 made objects held or handled count. It also confirms the translated text was checked and its numbers match. The side panel compares Rev 8 with Rev 9 and lists the two lessons learned on this rule.
“Rev 9 added ‘or any object they are holding or handling’ after a lesson learned”
- 0407:44
The crew lead decides to take the feeder out
Overhead line crew lead · person in chargeThe agents say what the rule allows. The person in charge decides how the work is done. Here the crew lead requests a planned outage of the feeder from 09:30 to 12:30. The request carries the reason: work inside 3.0 m, Rule 4.3.2, and a Rule 6.1 permit. It also lists the customers affected. There are 186, and the 2 on the priority register are called first. At 07:46 the control room sets the Permit to Work for 09:30.
Agents do not switch, isolate or issue permits. The person in charge decides.
- 05In the crew's language
The same ruling, in the reader's language
Rule checkerThree of the five people on this crew read the rules in a second language. One switch shows the ruling in that language. It carries the limit, the gauge and Rule 4.3.2 quoted from the rulebook's own translated text. Before the ruling reached the screen, the rule checker matched 3.0 m and 0.8 m to Table 4.1 in both texts.
Each number matches the clause, in both languages
- 0607:48
Pinned to the job briefing and read on each phone
Overhead line crew lead · person in chargeThe crew lead pins the ruling to the job briefing. It sits beside the wind limit for the MEWP, which is to stop above 12.5 m/s at the platform, and the grounding rule (Rule 6.4). The checks before anyone goes up include the 3.0 m line, marked with a slew limit, and a spotter with no other duty. The briefing goes to the crew's phones. All 5 acknowledge between 07:48 and 07:52, including the contractor jointer, who reads it in a second language.
“Briefing sent to 5 phones, each in the reader’s language”
- 0707:31, at the treatment plant
A reading inside the limit is still a NO
Water treatment operatorEarlier that morning, at a chlorine store, an operator asked a question. Was it safe to go in alone with the detector reading 0.3 ppm? The answer was NO. Two people must always go in, and only below 0.5 ppm. The reading is within the limit, but entering alone is not allowed. The rule checker also found that the published translation of the chlorine procedure says 1 ppm. So it ruled on the stricter 0.5 ppm. And it matched a past incident. An operator alone at 0.4 ppm saw the level reach 1.8 ppm in 90 seconds.
This ruling uses the stricter 0.5 ppm. The mismatch is now with the safety rules manager as a gap.
- 08No guess
When no rule answers, it says so
Rule gap reporterA pump station technician asked what gas readings let a crew go back into a wet well after a break. The closest clause, in the confined-space entry procedure, sets readings for the first entry only. Its match score of 0.61 is below the 0.80 threshold, so the ruling is a gray NO CLEAR RULE. The nearest rule is shown. An earlier near miss is matched, with H₂S (hydrogen sulfide) at 14 ppm after a pump restart. The question goes to the rule owner as a gap.
Ruling writer: “No clear rule · not guessed”
- 09Within one working day
The rules manager decides each gap, with the evidence in front of them
Safety rules managerFive gaps wait for the safety rules manager. They are conflicts, rules that say nothing, and the chlorine mismatch. For the mismatch, the evidence is laid out. The English is the controlled text and says 0.5 ppm. Of the week's 24 chlorine store rulings, 9 were read in translation, and each used 0.5 ppm. Beside this sit the clause in both texts and a drafted fix that is not yet published. The fix corrects the translation and reissues Rev 4.1 to both treatment plants. The manager can correct the translation, edit the wording, ask the procedure owner, or close it as not a gap.
Agents do not write or change a rule. The safety rules manager decides each gap.
- 10The week
What crews asked, and whether the rulings held up
Head of HSEIn one week crews asked 412 questions. The answers were 138 Yes, 121 No, 139 Only if and 14 with no clear rule. The median time to a ruling was 1.9 s. Approach distances led with 96 questions, then chlorine handling with 61. Rule 4.3.2 was cited 37 times. The safety rules team checked a random sample of 60 rulings, weighted toward high-energy topics. Of those, 59 agreed, one had its wording improved, and none were wrong.
“Rulings checked by the safety team · 59 of 60 agreed”