WorkflowHealth, Safety & Environment

Safety Incident Management

Safety incident management that finds serious-injury and fatality potential the hour a report is filed

See one case, screen by screen ↓
Watch with transcript →

Built forSafety advisersSafety managersSafety investigatorsField supervisorsDirectors of safety

The Problem Today

The crew lead's own words set the severity, so a near-fatal case can be filed as first aid and go uninvestigated.

10 days
before potential severity is judged, often at a monthly review our estimate
65%
agreement among safety experts classing the same cases today published

Not read when the case is classed

  • Work order
  • Job brief
  • Photos
  • Statements
  • Reporting clocks in inboxesSevere-injury and log deadlines tracked by hand
  • The same failure repeatsEarlier glove-off cases had the same cause

The Solution

  1. Each record read at intakeReport, work order, job brief, photos and statements, each phrase kept
  2. Classed on energy and controlsHigh energy with no direct control means serious or fatal potential
  3. Investigation openedA full investigation within the hour, led from outside the crew
  4. The HSE manager signsTimeline, causes and fixes confirmed in order, then findings signed

Built-in controls

  • Agents may raise a severity but never lower it
  • Regulator reports drafted by agents, filed by people
  • Safety alerts leave out the injured person's name

What You Get

Each crew hears the lesson while it is fresh, so the same failure is less likely to hurt someone else.

95%
agreement among safety experts once classing is energy-based published
  • Investigation within the hourRecords gathered before the investigator heads out
  • Repeat failures foundFive years searched for the same task, energy and control
  • Fixes that remove the hazardEngineering first, then procedure, then the briefing
In short

What is Safety Incident Management?

Safety incident management software takes an incident from the first report to a classified record. It runs the reporting clocks and an investigation with root causes, corrective actions and a shared lesson. Safety Incident Management adds six agents. They read the report and its records, judge actual and potential severity, start the clocks and open the investigation. The HSE adviser works the steps and the HSE manager signs.

How to choose AI solutions for utilities →

Updated

The problem

Incidents that could have been serious arrive labeled as first aid

When there is an incident at work, a utility's health, safety and environment (HSE) team has to class the incident and investigate it. Reports arrive as a crew lead's phone form, a call to the duty manager or an email from a contractor. For each one, the team makes three calls. It judges how bad the incident was, from first aid to recordable (it goes on the legal injury log) to lost time. Next it judges how bad it could have been. Last, it checks whether a reporting clock has started. Then the right investigation has to be opened and staffed.

Today the crew lead's own words usually decide the first two. Nobody reads the work order that says the line was live, or the statement that says the glove was off. How bad it could have been is judged weeks later at a monthly review, if at all. The same case is classed differently by region, investigator and contractor. The reporting clocks are tracked in inboxes. They are the 8-hour and 24-hour severe-injury reports and the 7-day log entry under 29 CFR 1904, the US rule on recording work injuries. Each runs from when the employer learns of the case. When a full investigation does start, the investigator spends the first day collecting records. These are the work order, the tailboard (the crew's pre-job safety briefing), the photos, the control-room log and the training record.

typical32%of recordable incidents at 11 utilities had serious-injury or fatality exposure
typical42%SIF (serious injury or fatality) exposure rate in water utilities, the highest of the three sectors studied
typical65%agreement among experienced safety professionals classifying the same cases, before an energy-based model
Where the days go between a report and an investigation under wayestimated
By hand18 days
With the solution1.9 days
  • Reading the report and deciding recordable and reportable1 → 0.1 d
  • Judging the potential severity, often left to the monthly review10 → 0.1 d
  • Choosing a qualified lead from outside the crew1 → 0.1 d
  • Gathering the work order, tailboard, photos, logs and training records1 → 0.1 d
  • Building the timeline and the energy-and-controls review2 → 0.5 d
  • Drafting root causes, corrective actions and the safety alert3 → 1 d

Estimated split for one serious-potential incident, in calendar days, by hand and with the solution.

How it works

Each report read with its records and classed on energy and controls

What comes in
Report in7 records · report, photos, statements, work order, logs
Agents at work
Report readerphrases and records
Then
Severity classifieractual · potential
Recordability checker
Similar-case finder
Then
Investigation plannerlead · steps
Then
Learning writer5-why · alert
A person decides
HSE managerconfirms and signs
What comes out
Classified incident
Reporting clocks
Investigation and alert
One case, step by step

A cut hand on a live line, reported as first aid

A line crew is changing a cracked phase B insulator on a pole energized at 12.47 kV. At 07:48 a wrench slips and an apprentice lineworker cuts their left palm on the cross-arm bracket. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0109:05

    The report comes in as first aid

    Crew lead

    After the clinic visit, the crew lead files from a phone. The report says four stitches, light duty, back tomorrow. In the incident file, the severity strip has only one bar filled, Reported: First aid. Actual and Potential both read “not classified yet”. The timeline holds 7 events, from the report, the tailboard and the clinic note.

    “Minor, back on light duty tomorrow.” · Investigation: none yet

  2. 0209:20

    One click on Classify, and the agents read the whole file

    HSE adviser

    The HSE adviser opens the incident and presses Classify. Four agents work one step at a time and keep each phrase they use. They read the 74-word report, the work order, the tailboard and two crew statements. Then they read 3 photos, the boom log and the control-room log. Cover-up means insulating covers placed over live parts. One photo at 07:41 shows cover-up on phases A and C, and none on B. The bucket moved at 07:44, and the feeder was live throughout.

    The energy check reads “Electrical, 7,200 V, above the 50 V line: high energy present”

  3. 03The phrases

    Each phrase it relied on, numbered in the margin

    Report reader

    The report stays exactly as the crew lead wrote it. Five phrases are highlighted and explained. The words “took the left glove off” mean no direct control. “The B phase was still live” means 7,200 V to ground, above the 50 V line. The phrase “a foot and a half from it” means about 18 in. That is inside the 25 in minimum approach distance, the closest a worker may get to a live part. The words “4 stitches” mean medical treatment beyond first aid. “Minor” is kept as reported.

    On “Minor”, the note says “Kept as reported. Actual and potential are decided separately, with the evidence.”

  4. 04Classified at 09:20

    Recordable as it was, fatal as it could have been

    Severity classifier and Investigation planner

    Actual moves to Recordable, and Potential to Fatal. The case is classed as SIF exposure, because there was high energy and no direct control. The rule “potential SIF → full investigation” opens the investigation. Its lead is the senior safety investigator, who is not on the crew. Preliminary findings are due 72 hours after the incident, and the final report within 30 days. The body map draws the path the current could have taken, hand to hand across the chest. The director of HSE and the VP Network Operations are alerted within the 2-hour rule.

    “Raised from first aid, nothing lowered” · 9 steps · 7 records read

  5. 05Step 4 of 9

    One timeline from all sources, confirmed event by event

    HSE adviser

    The investigation is worked in order, and a later step opens only when the earlier one is done. The agents drafted 12 events from the report, the boom log, the photos and three statements. Non-reclose was set on the feeder at 07:22, so the line would not switch itself back on after a trip. The bucket was up at 31 ft at 07:31. At 07:44 it moved 2.1 ft east to reach the seized bracket bolt. The glove came off at 07:46. The adviser confirms each event or opens its source.

    Records · 9, from the crew lead’s report to 3 earlier glove-off cases found by the similar-case finder

  6. 06Step 5 of 9

    For each energy, the control that should have been there

    Severity classifier

    Electrical energy is 7,200 V on phase B. One control is rubber gloves and sleeves. It failed, because the left glove came off at 07:46. Cover-up on each phase in reach failed too, since B was bare after the bucket moved. The 25 in minimum approach distance was broken, at about 18 in. For gravity, with the bucket at 31 ft, the fall-arrest lanyard to the boom was in place. Each answer carries its evidence numbers.

    “SIF exposure confirmed. The cut was the smallest thing that could have happened.”

  7. 07Step 6 of 9

    Five whys, down to causes the organization owns

    Learning writer

    Why was the glove off? The 9/16 in nut would not turn in rubber gloves, and the crew's truck carries no insulated ratchet. Why was nothing re-covered when the bucket moved? The live-line JHA, the job hazard analysis, sets “every phase in reach” once, at the tailboard. Why was there no insulated tool? Live-line kit lists do not include one, and three earlier glove-off cases had the same cause. Qualification is ruled out. The apprentice has been rubber-glove qualified for more than a year.

    The root causes are “No re-cover and re-brief when the bucket moves” and “No insulated tool for seized hardware on the trucks.”

  8. 08Step 7 of 9

    Engineering first, then procedure, then the briefing

    Learning writer

    The first action puts an insulated ratchet and socket set on all 38 bucket trucks. Fleet owns it, it is due next month, and it is approved. The second adds “bucket moved = re-cover and re-brief” to the live-line JHA. Standards owns it, and it is due within a month. In the third, the HSE adviser tells each crew in the network within a week that a glove off means stop the job. A fourth action, checking each live-line kit list for insulated tools, is added on request.

    “Engineering first: remove the reason to take a glove off, before telling people not to.”

  9. 09Step 8 of 9

    The HSE manager signs the preliminary findings

    HSE manager

    The findings fit on one page. They hold the classification, the root causes and four corrective actions with owners and dates. They also list what is still to come, the apprentice’s statement the next day and the electrical test of the left glove. The HSE manager signs, and the signature is recorded with its words and the time.

    “Preliminary findings approved. All four actions start now.”

  10. 10Step 9 of 9

    The lesson goes out while it is fresh, with no names

    Learning writer

    The learning writer drafts an interim safety alert, “Glove off near a live phase”. It goes to all 40 crews in the network and 12 live-line contractors once the findings are signed. It says in plain words what happened, what we found and what to do now. If a job needs a glove off, stop the job. When the bucket moves, re-cover and re-brief. Insulated ratchet sets are on their way to each bucket truck by the end of next month.

    Does not name the injured person in a shared alert, and does not send without sign-off.

Who it’s for

Adviser, manager, director, investigator and crew lead on one incident

The same cut hand, seen by the five people who own it. Here is what their week looked like, and what it looks like now.

HSE adviser
Classifies and works investigations
Before
Has 11 open incidents, 3 investigations and 40 crews. Reads each report on the reporter’s word and chases the work order, the photos and the statements alone. Meanwhile the worst ones come in labeled minor.
Now
Presses Classify and sees actual and potential severity, with each phrase and record behind them. Then works the investigation steps in order on one screen.
HSE manager
Signs cases and submits regulator reports
Before
Signs off cases built from the crew’s summary. Wants to see why a case is high potential, in the words of the people who were there.
Now
Signs preliminary findings that quote the report, the photos and the statements, and submits the severe-injury reports the agents draft.
Director of HSE
Answers to the board for serious injuries
Before
Hears about high-potential events at the monthly review. Wants to hear about a near-fatal case the same morning.
Now
Is alerted on each potential SIF within the 2-hour rule, and sees SIF potential by energy source, month, region and contractor.
Senior safety investigator
Leads full investigations
Before
Spends the first day of an investigation collecting records, and wants them in hand before getting in the truck.
Now
Is named lead the moment the classification is made, with 9 records gathered, the timeline drafted and the clocks running.
Crew lead
Files the report
Before
Files from the clinic parking lot in their own words. The apprentice is fine, four stitches, back tomorrow.
Now
Files the same way. The words stay exactly as written, and the agents decide actual and potential from the evidence.
The agents

Reading, classifying and investigating agents for safety incident management

Six agents read each report with its records, class it on energy and controls and open the investigation. The HSE manager signs.

Report reader

Reads the report, photos and witness statements. Pulls out who, where, the task, the energy and the controls, quoting the exact phrase for each fact.

  • Never edits what a reporter wrote
  • Each fact carries its phrase
Severity classifier

Decides actual severity from the injury and the care given. Decides potential severity with the energy-based test. The test asks whether high energy was present and whether a direct control was in place. High energy without a direct control is SIF exposure, whatever the outcome.

  • May raise a reported severity, and never lowers it without an HSE adviser
  • Never closes a high-potential incident
  • Shows the evidence for each class
Recordability checker

Decides recordable and reportable under 29 CFR 1904. Starts the 8-hour, 24-hour and 7-day clocks and drafts the log entry.

  • Never files with a regulator. Drafts for the HSE manager
  • Keeps watching for a hospital admission for 24 hours
Investigation planner

Opens the investigation the rules require. Picks a lead qualified for the task and not on the involved crew. Gathers the work order, tailboard, photos, control-room and vehicle logs, training records and statements. Builds the nine steps with their due dates.

  • Never assigns a lead from the involved crew
  • Read-only access to operational logs
Similar-case finder

Searches five years of incidents for the same task, energy source and failed control, scores each match and says why it matches.

  • Shows the score and the reason
  • Never merges incidents
Learning writer

Drafts the 5-why from the confirmed timeline and the energy-and-controls table. Proposes corrective actions that remove the energy or add a direct control, ahead of training. Writes a one-page safety alert in plain words.

  • Never names the injured person in a shared alert
  • Never sends without sign-off
  • Each claim cited
HSE adviser and manager

Adviser works the steps, and the manager signs.

Ask in plain words

Questions on high-potential cases, repeat failures and reporting clocks

Ask in plain words, or say what to change. Each answer points to the records behind it. These answers use the sample data.

Why is this incident high potential?

Because the hand was near a live 7,200 V phase with no direct control. The work order puts it on an energized feeder. The crew lead wrote that the left glove was off and the hand about a foot and a half from B phase. One photo shows no cover-up on B. At about 18 inches, the hand was inside the 25-inch minimum approach distance. The cut was minor, but what could have happened was fatal, so a full investigation opened.

Have we had glove-off cases on live lines before?

Three in the last 18 months, all in the same network, each time a tool would not work in rubber gloves. The crew lead says the crew's truck carries no insulated ratchet. The three cases are linked to the root causes of this investigation.

Add an action to check every live-line kit for insulated tools

Added a fourth action to check each live-line kit list for insulated ratchets and sockets. Fleet owns it, it is due in about three weeks, and it is linked to the glove-off cases. It sits with the first action, which buys the ratchet sets for all 38 bucket trucks.

Which reporting clocks run out this week?

Four run out by Friday. One incident's log entry is due tonight at 23:59, with the draft waiting for the HSE manager. This incident's 24-hour admission watch ends Wednesday 07:48, with no admission. Another incident's log entry is due Friday 06:10. This investigation's preliminary findings are due Friday 07:48.

The screens

The incident file, the energy-and-controls review and the safety alert

From the working solution, on its sample data. Pick one to see it large.

The incident fileSeverity as reported, as it was and as it could have been. Beside it are the body map with the potential path, the timeline from all sources and the investigation steps.
As reportedA new incident on the crew lead’s word alone. It reads first aid and is still unclassified, with no investigation opened.
ClassifyingFour agents read the report, the work order, the tailboard, the statements, the photos and the logs, one step at a time.
The report, as writtenThe reporter’s words unchanged, with each phrase the agents relied on highlighted and explained in the margin.
The timelineTwelve events drafted from the report, the boom log, the photos and the statements, each with its source, confirmed one by one.
Energy and controlsEach energy present and the direct control that should have been there, with the pole top drawn from the photo and the boom log.
Root causesFive whys from the confirmed timeline to causes the organization owns, and what was ruled out.
Corrective actionsEach action with its kind, owner, due date and status, engineering first.
Preliminary findingsClassification, root causes, actions and what is still to come, signed by the HSE manager.
Share the learningAn interim safety alert for each crew and live-line contractor, with no names.
Reporting clocksEach running clock with the time left: log entries, the 24-hour admission watch, preliminary findings and final reports.
InsightsHow bad incidents were against how bad they could have been, SIF potential by energy source and month, and cases raised at intake.
Safety settingsHigh-energy thresholds, investigation rules, clocks and approvers.
Governance

Evidence, sign-off and the audit trail in safety incident management software

Each class shows its evidenceEach classification cites the phrases and records it relied on. These are the report as written, the work order, the photos, the boom and control-room logs and the statements. Each is numbered in the margin and one click from the source.
Raise, but never quietly lowerThe agents may raise a reported severity and tell the reporter. Lowering always needs an HSE adviser, and no agent closes a high-potential incident.
The HSE manager signsClassification sign-off and the closing of a full investigation are signed by a named approver, with the meaning of the signature and the time recorded.
Agents draft regulator reports, and people file themThe recordability checker starts the 8-hour, 24-hour and 7-day clocks and drafts the log entry or severe-injury report. The HSE manager submits it, and no agent files with a regulator.
An independent lead, an anonymous lessonThe investigation lead is not from the injured person’s crew. The shared safety alert leaves out the injured person's name and goes out only after sign-off.
Each step on the audit trailEach agent step and each human decision is recorded with the name and the time. That covers who classified, who confirmed the timeline and who signed. Incident data stays in the utility’s own environment.
Configuration

High-energy thresholds, investigation rules, clocks and approvers

What counts as high energy, which incidents open which investigation, the clocks and the approvers are settings, chosen by the utility.

SettingDefaultChoose from
High energy: electrical50 V, or any arc-flash exposureThresholds are also set for gravity (4 ft, or 500 ft-lb), motion (500 ft-lb) and excavation (5 ft). Others cover confined space (19.5% oxygen), stored pressure (15 psi) and chemical releases
Potential serious injury or fatality → full investigationOnOn · Off. Opened the moment the classification is made, with a lead from outside the crew
High energy, control held → learning reviewOnOn · Off. Three steps: what held, why, and who else should know
Raise a severity above what was reportedRaise, and tell the reporterRaise, and tell the reporter · Propose only. Lowering always needs an HSE adviser
Executive alert on a potential SIFWithin 2 hoursWithin 1 hour · Within 2 hours · Within 4 hours. Goes to the Director of HSE and the VP of the region
Preliminary findings72 hours48 hours · 72 hours · 5 days, counted from the time of the incident
Final investigation report30 days30 days · 45 days · 60 days. Extensions need the Director of HSE
Classification sign-off and severe-injury reportsHSE managerHSE manager · Director of HSE. The agents draft, and this person submits
Connections

Work orders, tailboards, logs and rosters each safety incident leaves

Incident reports and photosthe crew lead’s mobile form, in their own words, with the photos from the crew’s phones
Witness statementswritten by the crew and sent with the report, or emailed from the control room
Work orders and tailboardsthe task, method and circuit from work management, plus the job hazard analysis and who signed it
Control-room and vehicle logsnon-reclose and switching records, boom and bucket telematics
Clinic notes and training recordsthe care given and fitness for duty, plus qualifications such as rubber-glove live-line work
Crew and contractor rosterswho was on the crew, the contractor’s qualifications and prequalification
What it changes

Safety incident management results: classing, clocks and investigations

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1hour
from a serious-potential report to a full investigation
Todaymonthly review
With agentssame hour
target
0
missed 8-hour, 24-hour or 7-day reporting clocks, the design goal. Each clock starts when the report is filed
typical
95%
agreement on the class once it is energy-based, up from 65%
65% → 95%
experienced safety professionals

“Demo” means seen in the working solution, on its sample utility data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate, for one serious-potential incident. “Typical” means published figures. A DEKRA study of 1,060 recordable incidents across 11 utilities found 32 % had SIF exposure, and 42 % in water. With the energy-based Safety Classification and Learning model, agreement among experienced safety professionals rose from 65 % to 95 %. Regulatory context: 29 CFR 1904.39 (8 h / 24 h), 1904.29 (7 days), 1910.269 (minimum approach distance). Names on the screens are sample data.

Questions

Safety incident management software questions from HSE teams

What is safety incident management software?

Safety incident management software takes an incident from the first report to a classified record. It runs the reporting clocks and an investigation with root causes, corrective actions and a shared lesson. Safety Incident Management adds six agents. They read the report and its records, judge actual and potential severity, start the clocks and open the investigation. The HSE adviser works the steps and the HSE manager signs.

How does SIF potential classification work?

The severity classifier uses an energy-based test. It asks whether high energy was present, above the thresholds in Settings, and whether a direct control was in place. High energy without a direct control is SIF exposure, whatever the outcome. In the sample case, a cut needing four sutures was classed recordable, with a potential of fatal. The hand was about 18 inches from a live 7,200 V phase, with the glove off and no cover-up.

Is it incident management software for electric and water utilities?

Yes. It reads the records utility crews already produce. These include work orders, tailboards and job hazard analyses, control-room logs, boom telematics and permits. Its thresholds cover electrical contact and arc flash, falls, excavation, confined spaces, stored pressure and chlorine or hypochlorite releases.

Does it decide whether an injury is recordable or reportable?

The recordability checker decides recordable and reportable under 29 CFR 1904, from the care given. It starts the 8-hour, 24-hour and 7-day clocks and drafts the log entry. For 24 hours it keeps watching for a hospital admission. The HSE manager submits, and no agent files with a regulator.

How does it help stop repeat incidents?

The similar-case finder searches five years of incidents for the same task, energy and failed control. In the sample case it found three earlier glove-off cases. In each, a tool would not work in rubber gloves. So the corrective actions put insulated ratchets on all 38 bucket trucks, rather than only restating the rule.

Can an agent lower a severity or close an investigation?

No. The agents read, classify, raise and draft. They do not lower a severity on their own, sign or file. Lowering needs an HSE adviser, and the HSE manager signs the classification and the investigation. The lead is not from the injured person’s crew. Each step is on the audit trail with the name and the time.

Can we set our own energy thresholds, clocks and approvers?

Yes. The settings include the high-energy thresholds and which incidents open a full investigation, a standard investigation or a learning review. They also cover whether agents raise a severity or only propose it, and the executive alert. The preliminary and final report clocks, the admission watch and the approvers are settings too.

What do we send to try it on our own incidents?

Your incident procedure, safety rules, investigation template and a sample of past incidents. The Agentic Solution Engine builds and deploys it from those requirements and documents, and it goes live once each quality gate has passed. We will walk you through it on your own incidents first.

Try safety incident management
on a sample of your closed incidents.

We’ll run Safety Incident Management on a sample of your own closed incidents.