- Before
- Reads, classifies and answers 40 to 60 new reports a week by hand. By the time each one is read, it is too late to see the pattern.
- Now
- Opens the pyramid with each report already classified and the rising trend flagged. Confirms the serious ones and accepts the actions the agents propose.
A kicked-out pole ladder, a rising trend and the alert that followed
A utility runs electricity and water across five sites. During storm repairs after high wind, a pole ladder kicks out at a roadside service connection. By the next morning it is one of 16 similar reports. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Next morning · 08:10
The day opens on the precursor pyramid
Safety advisorThe safety advisor covers network field services at two depots. The home screen is a precursor pyramid. It stacks each report from the last 12 weeks, 916 in all, into five tiers by how bad it could have been. There are 490 unsafe conditions, 233 unsafe acts, 141 low-energy near misses and 38 high-energy ones where a control held. At the top sit 14 with serious potential, up 40 % on the prior 12 weeks. Four reports have arrived since 07:00 and already sit in their tiers. Beside the pyramid is an alert for ladder work at the first depot.
“Common factor: 11 of 16 used the new 3.8 m pole ladders from one batch, delivered without the pole strap. 2 were serious potential.”
- 02That morning · 06:00
Three rising weeks at one depot: 3, 5, then 8
Trend watcherThe weekly trend run counted 916 events over 12 weeks, across 8 work types at 5 sites. Ladder work at the first depot ran 3, 5 and 8 in the last three weeks. Its baseline is 0.9 a week, so the rule fired and opened an alert. The chart marks the day the new ladders arrived, when 24 from the new batch were issued. Chamber work at a third site and chemical handling at a fourth were also watched, and neither one fired.
The rule: three rising weeks, with the last week at least twice the 8-week baseline and at least 3 events.
- 03The common factor
What the 16 share, and where the same ladders went
Trend watcherOf the 16 reports, 11 used ladders from the new batch and 12 were overhead service connections. Crews from one service contractor did 9, and 6 were on wet or soft ground. Time of day and crew were not shared, since seven different crews were involved. The stores records show 14 ladders from the same batch have gone to the second depot since then, with no report from there yet. Another 6 sit unissued in stores at a third site.
“Crews at the second depot do the same service connections. The alert and the strap action cover both depots.”
- 04The day before · 15:50
A voice note from the pole
LineworkerThe lineworker was strapping on at about four meters up to transfer a service. The ladder kicked out at the base on wet ground by the road. A crewmate was footing it and held it, and the live low-voltage (LV) service was within reach. The report reader transcribes the 38-second voice note and describes the 2 photos. It ties each of 6 facts to the phrase or photo it came from. On photo 2, the missing strap is circled beside the batch tag.
“New ladder, no pole strap on it, same as the others in the van. I came down slowly and we stopped the job. Nobody hurt.”
- 05Three minutes later
Four questions, and the tier is serious potential
ClassifierThe classifier answers four questions. High energy present: yes, a fall from 4.1 m and a live 400 V service within reach. Released: yes, the ladder base moved. Serious injury: no. Direct control in place: no. There was no pole strap and the top was not tied, and footing a ladder does not count as a direct control. The tier is serious potential, with confidence 0.93. The crew leader on duty is told at 15:53 and stands the crew down from ladder work at 16:02.
“High energy, released, no direct control: only chance and a colleague stopped a serious injury.”
- 0616:17 that day
Two reports, one event, both kept
Duplicate finderThe crewmate who footed the ladder, a contractor, reports the same event from the same pole 25 minutes later. The duplicate finder matches pole, time and words and joins the second report to the first, so the trend counts one event. Nothing is deleted. In the inbox, the second report shows as joined to the first, and each reporter keeps their own report and gets their own reply.
Duplicates are joined and both are kept. Each reporter still gets a reply.
- 0708:24 · Confirmed
The advisor confirms, accepts the actions and answers both reporters
Safety advisorA safety advisor must confirm a serious-potential report within 24 hours. The advisor confirms at 08:24 and accepts the four proposed actions. Both replies go out at 08:31, 16 h 41 m after the first report and inside the 24-hour clock. Each agent step on the report sits on one list, from the transcribed voice note to the advisor's confirmation.
“Thanks for your report of the ladder at the pole. It has been read and confirmed as serious. You were right about the strap.”
- 08The actions
Highest control first
Action drafterThe action drafter proposes actions from the top of the hierarchy of controls. That is the ranked list that runs from removing a hazard down to protective gear. Each action has an owner and a due date. Substitution: issue stand-off pole ladders from stores until the straps are fitted. Engineering: fit pole straps to all 38 ladders in the batch before reuse. That is 24 at the first depot and 14 at the second, owned by the crew leader and due midweek. Administrative: a toolbox talk on tying the ladder top before climbing, and a query to the ladder supplier on the order spec, owned by procurement.
It only proposes. The safety advisor accepts, and the agent does not close an action.
- 09The alert
A one-page safety alert, in crew words
Action drafter · checked by the safety advisorThe safety alert says what happened, why, and what to do from now on. Check the tag, and do not climb a ladder from the batch until a pole strap is fitted. Use a stand-off ladder. Tie the top each time, because footing is not enough on a round pole. The alert goes to 212 people by text and the crew app. They are 96 overhead and service crew members at one depot, 88 at the other and 28 contractors.
“Report any ladder that moves, even a little. Every report is answered.”
- 1009:05 · Signed
The Head of HSE signs by phone, and it goes out
Head of HSEThe Head of HSE (health, safety and environment) signs each safety alert. Here the signature goes on at 09:05 with the meaning “approved for issue”. The alert is sent the moment it is signed. The screen then tracks who has read it, 168 of 212 crew members so far. The trend was caught in three weeks, before anyone fell.
“Signed by the Head of HSE · 09:05 · meaning: approved for issue”