Contract Manufacturing RFQ Quote Preparation

Contract manufacturing RFQ preparation where each balloon on the drawing carries its operation, its cost and an assumption, and the estimator, the engineer and the program manager sign the quote.

Follow balloon 17 from a drawing note to a sent quote ↓
Watch with transcript →
The problem

One finish note on page two that never reaches the price

An OEM request for quote lands as a stack of drawings, a bill of materials, a volume sheet and a quality requirements file, with a due date two weeks out. The estimator reads it alongside every other open request, and the engineer is asked for cycle times between jobs.

The costly misses are small. A surface finish tighter than the shop's usual turned finish, a material on the bill of materials that disagrees with the drawing, a cleanliness note with no limits. Each one is either priced in silently, priced out by mistake, or found after the order is won.

Built forEstimatorsManufacturing engineersNPI program managersSales leads

The Problem Today

An estimator reads every drawing note by hand, and one missed finish callout changes the cost of every part shipped.

600
requests for quote each year at a large contract manufacturer our estimate

Read by hand today

  • Drawings
  • Parts list
  • Past jobs
  • Questions
  • Notes missed in the packetA finish or material callout never reaches the cost
  • Questions asked too lateUndefined requirements surface after the award

The Solution

  1. Each feature balloonedDimensions, tolerances, notes and symbols numbered on each drawing
  2. Routed from past jobsOperations and cycle times calibrated by what similar jobs actually ran
  3. Questions draftedEach gap in the packet becomes a question, priced both ways meanwhile
  4. People price and signThe estimator prices, the program manager approves, sales sends

Built-in controls

  • Agents never set a price or a margin
  • The approver opens the drawing note before signing
  • No other customer's name leaves the shop

What You Get

The quote goes out with every assumption tied to a drawing note, and the questions asked before the order.

$491K
a year of reading and costing time at six hundred RFQs our estimate
  • Finish and material gaps foundEach one asked and priced both ways
  • Cycle times from actualsCalibrated by what past jobs really ran
  • A package the customer can readPrices by tier, one-time costs and each assumption
One spine RFQ, one morning

A contract manufacturing RFQ for a polyaxial pedicle screw system

A machined-implant shop receives a request for quote from a spine business: 14 drawings, 9 part numbers and three annual volumes, due in 13 business days. The estimator wants a first pass within two days of receipt.

demoThe OEM, the shop, its people, the parts and the prices are sample data.

  1. 01Morning

    14 drawings, 9 part numbers, and nothing ballooned until the read

    Estimator

    The drawing rail lists every sheet in the packet with its revision. The shank drawing sits in the middle, clean, with an empty panel beside it: the agents have not read this packet yet. Until they do, no balloon, assumption or price appears, so nothing on the screen can pass for a reviewed quote.

  2. 02Morning

    Balloon 17 asks for Ra 0.4 µm, and the shop's shanks measure 0.6 to 0.8

    Estimator

    After the read, all 170 features carry balloons. Balloon 17, the neck and sphere finish, is the one no earlier job needed. The routing planner adds a polishing step, $2.28 on every shank, and the question drafter asks whether Ra 0.8 µm is acceptable. Both options will be priced while the answer is out.

  3. 03Morning

    The special thread has pitch and diameters but no flank angles

    Estimator

    On the tulip head, Detail D defines a special internal thread without a gauge definition. The assumption panel shows how it is quoted meanwhile: $12,600 for gauges made to the customer's gauge drawing, and a thread mill at $4,200. Confidence reads 64%, which the screen marks as a call a person must make.

  4. 04Morning

    Six questions, each tied to its balloons and priced both ways

    Estimator

    The questions screen holds what the packet left open: the shank finish, a cleanliness note with no limits, the thread gauges, a crown material that differs between drawing and bill of materials, a tulip revision mismatch, and no release size. Each says how it is priced until the customer answers. Nothing is sent from here.

  5. 0508:21

    Routing confirmed after he opened what past jobs actually ran

    Manufacturing engineer

    The engineer opens the calibration basis first: the closest past jobs, quoted against actual. The last tulip ran 12% over its quote, so its cycle moves from 10.3 to 11.5 minutes. Only then does the confirm button work. He signs with his own login, and any cycle-time change would carry his typed reason.

  6. 0608:25

    Both finishes priced: $87.65 polished, $84.36 if Ra 0.8 µm is accepted

    Estimator

    The cost roll-up builds unit cost from the confirmed routing and the signed machine rates. She applies the margin ladder, 30%, 28% and 26% by volume, and signs the prices for both options. At 65,000 sets a year, option A comes to $6,522,750 and option B to $6,308,380. The agents never set a margin.

  7. 0708:31

    Two records open before her approval counts

    NPI program manager

    Her approval page lists what she must open first: the drawing note for balloon 17 and the draft package with every price and question. The package checks run beside them: prices match the cost sheet, six questions attached, no other customer named, and a capacity note on the machines added at higher volumes.

  8. 0808:33

    Rev A approved for release, with the capital terms in her signature

    NPI program manager

    She approves Rev A. At 65,000 sets a year the quote needs two more Swiss machines and two more mill-turns, funded inside the rates against a volume commitment, and her signature covers that. Sending stays with the sales lead, who must open the package first. A customer answer would make it Rev B and need her again.

$21.55 for one polished 6.5 mm shank at 65,000 a year

The cost roll-up for one shank, option A, each line rounded to the cent and then summed.

Machining, 7.4 min at $118 an hour$14.55
Setup, spread over monthly lots$0.34
Polishing and profilometer checkthe step balloon 17 adds$2.28
Tumble, anodize, passivate, clean, laser mark$1.75
Inspection$0.93
Titanium bar$0.84
Scrap at 4%$0.86
Shank cost$21.55

demoSample data, from the working solution.

Cycle times corrected by what the last jobs actually ran

The routing planner's CAM estimate, scaled by the actual-to-quoted ratio of the closest past job.

PartCAM estimateActual ÷ quotedQuoted
Shank, 6.5 mm solid6.8 min1.0867.4 min
Shank, 5.5 mm solid6.3 min1.0866.8 min
Shank, 6.5 mm cannulated7.4 + 1.8 gundrill1.20 on the gundrill9.6 min
The tulip head10.3 min1.1211.5 min
Crown2.3 min1.05, no close job2.4 min
Set screw3.0 min1.0333.1 min

demoSample data, from the working solution. The crown has no close past job, so its factor is the shop's standard Swiss factor, and the engineer sees it as the weak basis it is.

Around the quote

Queue, packet and capacity behind the RFQ quote

What the sales lead, the engineer and the program manager open around this request.

RFQ queue21 open requests with stage, owner and due date, and five proposed for no-bid: the sales lead signs them together, and the program manager checks a sample of two.
The packetEach drawing's revision against the bill of materials, with the two mismatches found, and the NDA referenced for the legal team, not read.
Past jobsQuoted against actual cycle time, scrap and finish on the five closest jobs. Customer names show only inside the shop.
CapacityMachine hours and machines by volume. The tulip head, not the shank, sets the mill-turn need, and new machines take about 20 weeks.
Audit trailEach read, confirmation, price and approval with role, session, reason and signature meaning, exportable as CSV or an evidence pack.

demoSample data, from the working solution.

Who reads the packet

Seven agents read and cost the packet, and none of them prices it

They balloon, route, compare and draft. People confirm, price, approve and send.

Packet reader

Inventories the packet and checks drawing revisions against the bill of materials.

  • Never accepts terms or reads documents marked for the legal team
Drawing balloon reader

Numbers each dimension, tolerance, note and symbol on each drawing, with its location.

  • Never guesses a value it cannot read
Routing planner

Proposes operation, machine and cycle-time driver per feature from standard routings and CAM estimates.

  • Never confirms a routing
  • Never changes a validated process
Similar job finder

Finds past jobs by geometry, material and process and reads quoted against actual from the ERP.

  • Never shows another customer's name outside the shop
  • Never treats a quote as an actual
Question drafter

Drafts a question for each difference or undefined requirement, with how it is priced meanwhile.

  • Never sends anything to a customer
Cost roll-up

Computes unit cost per line and tier from the confirmed routing and signed rates.

  • Never sets a price or margin
Package assembler

Builds the quote package and checks totals, assumptions and that no other customer is named.

  • Never sends a quote or releases an unapproved package

Price, approval and sending stay with named people

The agents prepare the quote. These steps carry a person's signature.

Margins and pricesThe estimator applies the margin ladder and signs prices. Anything under the floor needs the sales lead's signature first.
Routings and cycle timesThe manufacturing engineer confirms them after opening the calibration basis, and any change carries his typed reason.
Approval of the quoteThe program manager opens the balloon 17 note and the draft package before approving, and a send-back clears the estimator's signature.
Anything sent to a customerOnly the sales lead sends, only an approved package, after opening it. Questions travel inside that package.

demoSample data, from the working solution.

What estimators ask about contract manufacturing RFQ preparation

What is contract manufacturing RFQ preparation?

Contract manufacturing RFQ preparation, from the packet to the sent quote: agents read the drawings and documents, balloon each feature, propose routings and cycle times from past jobs, and draft questions. The estimator prices, the engineer confirms the routing, the program manager approves and the sales lead sends.

Do the agents set prices or margins?

No. The cost roll-up computes unit cost from the confirmed routing and signed rates. The estimator applies the margin ladder and signs the prices, and a price below the floor needs the sales lead's signature before the program manager can approve.

Can another customer's name end up in a quote?

No. Past jobs show customer names only inside the shop, and the package assembler checks the quote for any other customer's name before it can be approved. That setting is locked on.

What happens when the customer answers a question?

The estimator records the answer after opening the reply. The quote moves to a new revision, the affected balloon and price change, and the program manager approves again.

Does it send questions or quotes to the customer?

Never. Only an approved package can be sent, and only the sales lead sends it, after opening it.

Where do the cycle times come from?

From a CAM estimate scaled by the ratio of actual to quoted time on the closest past job. The manufacturing engineer opens that calibration before confirming the routing, and any change he makes carries a typed reason the approver must read.

Bring an RFQ packet you quoted last quarter
and the job it turned into.

We will balloon its drawings, cost it from your past jobs and show the notes your quote priced around.