Inventories the packet and checks drawing revisions against the bill of materials.
- Never accepts terms or reads documents marked for the legal team
Contract manufacturing RFQ preparation where each balloon on the drawing carries its operation, its cost and an assumption, and the estimator, the engineer and the program manager sign the quote.
Follow balloon 17 from a drawing note to a sent quote ↓An OEM request for quote lands as a stack of drawings, a bill of materials, a volume sheet and a quality requirements file, with a due date two weeks out. The estimator reads it alongside every other open request, and the engineer is asked for cycle times between jobs.
The costly misses are small. A surface finish tighter than the shop's usual turned finish, a material on the bill of materials that disagrees with the drawing, a cleanliness note with no limits. Each one is either priced in silently, priced out by mistake, or found after the order is won.
Built forEstimatorsManufacturing engineersNPI program managersSales leads
An estimator reads every drawing note by hand, and one missed finish callout changes the cost of every part shipped.
Read by hand today
Built-in controls
The quote goes out with every assumption tied to a drawing note, and the questions asked before the order.
A machined-implant shop receives a request for quote from a spine business: 14 drawings, 9 part numbers and three annual volumes, due in 13 business days. The estimator wants a first pass within two days of receipt.
demoThe OEM, the shop, its people, the parts and the prices are sample data.
The drawing rail lists every sheet in the packet with its revision. The shank drawing sits in the middle, clean, with an empty panel beside it: the agents have not read this packet yet. Until they do, no balloon, assumption or price appears, so nothing on the screen can pass for a reviewed quote.
After the read, all 170 features carry balloons. Balloon 17, the neck and sphere finish, is the one no earlier job needed. The routing planner adds a polishing step, $2.28 on every shank, and the question drafter asks whether Ra 0.8 µm is acceptable. Both options will be priced while the answer is out.
On the tulip head, Detail D defines a special internal thread without a gauge definition. The assumption panel shows how it is quoted meanwhile: $12,600 for gauges made to the customer's gauge drawing, and a thread mill at $4,200. Confidence reads 64%, which the screen marks as a call a person must make.
The questions screen holds what the packet left open: the shank finish, a cleanliness note with no limits, the thread gauges, a crown material that differs between drawing and bill of materials, a tulip revision mismatch, and no release size. Each says how it is priced until the customer answers. Nothing is sent from here.
The engineer opens the calibration basis first: the closest past jobs, quoted against actual. The last tulip ran 12% over its quote, so its cycle moves from 10.3 to 11.5 minutes. Only then does the confirm button work. He signs with his own login, and any cycle-time change would carry his typed reason.
The cost roll-up builds unit cost from the confirmed routing and the signed machine rates. She applies the margin ladder, 30%, 28% and 26% by volume, and signs the prices for both options. At 65,000 sets a year, option A comes to $6,522,750 and option B to $6,308,380. The agents never set a margin.
Her approval page lists what she must open first: the drawing note for balloon 17 and the draft package with every price and question. The package checks run beside them: prices match the cost sheet, six questions attached, no other customer named, and a capacity note on the machines added at higher volumes.
She approves Rev A. At 65,000 sets a year the quote needs two more Swiss machines and two more mill-turns, funded inside the rates against a volume commitment, and her signature covers that. Sending stays with the sales lead, who must open the package first. A customer answer would make it Rev B and need her again.
The cost roll-up for one shank, option A, each line rounded to the cent and then summed.
| Machining, 7.4 min at $118 an hour | $14.55 |
| Setup, spread over monthly lots | $0.34 |
| Polishing and profilometer checkthe step balloon 17 adds | $2.28 |
| Tumble, anodize, passivate, clean, laser mark | $1.75 |
| Inspection | $0.93 |
| Titanium bar | $0.84 |
| Scrap at 4% | $0.86 |
| Shank cost | $21.55 |
demoSample data, from the working solution.
The routing planner's CAM estimate, scaled by the actual-to-quoted ratio of the closest past job.
| Part | CAM estimate | Actual ÷ quoted | Quoted |
|---|---|---|---|
| Shank, 6.5 mm solid | 6.8 min | 1.086 | 7.4 min |
| Shank, 5.5 mm solid | 6.3 min | 1.086 | 6.8 min |
| Shank, 6.5 mm cannulated | 7.4 + 1.8 gundrill | 1.20 on the gundrill | 9.6 min |
| The tulip head | 10.3 min | 1.12 | 11.5 min |
| Crown | 2.3 min | 1.05, no close job | 2.4 min |
| Set screw | 3.0 min | 1.033 | 3.1 min |
demoSample data, from the working solution. The crown has no close past job, so its factor is the shop's standard Swiss factor, and the engineer sees it as the weak basis it is.
What the sales lead, the engineer and the program manager open around this request.
demoSample data, from the working solution.
They balloon, route, compare and draft. People confirm, price, approve and send.
Inventories the packet and checks drawing revisions against the bill of materials.
Numbers each dimension, tolerance, note and symbol on each drawing, with its location.
Proposes operation, machine and cycle-time driver per feature from standard routings and CAM estimates.
Finds past jobs by geometry, material and process and reads quoted against actual from the ERP.
Drafts a question for each difference or undefined requirement, with how it is priced meanwhile.
Computes unit cost per line and tier from the confirmed routing and signed rates.
Builds the quote package and checks totals, assumptions and that no other customer is named.
The agents prepare the quote. These steps carry a person's signature.
demoSample data, from the working solution.
Contract manufacturing RFQ preparation, from the packet to the sent quote: agents read the drawings and documents, balloon each feature, propose routings and cycle times from past jobs, and draft questions. The estimator prices, the engineer confirms the routing, the program manager approves and the sales lead sends.
No. The cost roll-up computes unit cost from the confirmed routing and signed rates. The estimator applies the margin ladder and signs the prices, and a price below the floor needs the sales lead's signature before the program manager can approve.
No. Past jobs show customer names only inside the shop, and the package assembler checks the quote for any other customer's name before it can be approved. That setting is locked on.
The estimator records the answer after opening the reply. The quote moves to a new revision, the affected balloon and price change, and the program manager approves again.
Never. Only an approved package can be sent, and only the sales lead sends it, after opening it.
From a CAM estimate scaled by the ratio of actual to quoted time on the closest past job. The manufacturing engineer opens that calibration before confirming the routing, and any change he makes carries a typed reason the approver must read.
Every supplier change traced to its validations and filings, with a source on every answer.
1-min demoIncoming Certificate of Analysis and Conformance VerificationEvery certificate value checked against our drawing, and a failing lot held before it moves.
1-min demoOEM Customer Audit Preparation for Contract ManufacturersEvery agenda slot ready with its records, and the weak spots found before the auditor.
1-min demoWe will balloon its drawings, cost it from your past jobs and show the notes your quote priced around.