- Before
- Carries 34 open disputes on a 40-day clock and builds each file by hand. Is sure the answer is in there somewhere, but cannot find it before day 40.
- Now
- Opens each dispute as a balance, with each item weighed by a written rule. Finds the missing photo in one click and signs a letter that cites the scale.
A misread meter, a late photo and a dispute decided on day 36
A household disputes its summer electricity bill from the sample utility. The bill is for 6,352 kWh and $2,316.97. It is day 36 of the 40-day clock for a final answer. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0106:00
Each clock counted and each hold checked before the team logs in
Clock keeperThe clock keeper counts the days on all 412 open disputes. It warns 6 handlers at day 30 and drafts 3 holding letters at day 35. It also checks each hold. In all, $1.86M is held from reminders and disconnection. This month 973 reminders were blocked, and none was sent on a disputed amount. One dispute has reached day 39, and its handler is told.
“Checked 412 holds: 973 reminders blocked this month, 0 sent on a disputed amount”
- 02Morning
The bill, drawn as a balance that leans to the utility
Senior dispute handlerThe handler has 34 open disputes, with those nearest the 40-day clock first. The balance puts the customer’s claims on one side and the utility’s evidence on the other. A written rule weighs each item from 1 to 5. On the customer’s side, usage stayed within 2% of last year until the disputed month (3). The customer also sent their own photo of the meter (2) and a neighbor’s bill (1). On the utility’s side are the actual reading of 61,952 (4) and a meter test at +0.4% (3). There is also a clean site inspection (2) and the reading agreed the month before (1). The customer’s side weighs 6 and the utility’s 10.
Proposed: “Not upheld. The bill stands; offer a 3-month payment plan for $416.97.”
- 03The record
The case file, built the night the customer wrote in
Case builderThe customer wrote in the utility’s app at 21:12. They paid $1,900.00, about a normal August, and disputed the rest. Four minutes later the case builder opened the dispute, put $416.97 on hold and started the clock. The chronology lists each reading, upload, bill, call, inspection and test with its source. For the month-end reading, the photo column shows “None linked”.
“Same house, same habits, and last August was 5,380 kWh. I think the reading is wrong.”
- 04One click
The reader’s photo, uploaded late and not linked
Evidence gathererThe handler clicks Check for missing evidence. The evidence gatherer checks 9 documents. It notices that the month-end reading has no photo, while each other actual reading on the account has one. It searches the reader’s handheld uploads for the next 48 hours. There are 212 photos, and 9 are not linked to a reading. One is for this meter, taken at 09:14 and uploaded at 18:41 the next day.
“The register shows 61,052. The hundreds wheel is a 0, keyed as a 9.”
- 05On the scale
The scale tips to the customer by 4
Evidence weigherThe handler puts the photo on the scale. By the weighing rules, a photo of the register taken at the reading weighs 5. When a stronger item contradicts another, the weaker one loses 3. So the actual reading drops from 4 to 1, contradicted by its own photo. The customer’s side now weighs 11 and the utility’s 7. The proposed decision flips to Upheld, with a credit of $486.00.
Actual reading: “Contradicted by its own photo: weight 4 → 1.”
- 06The arithmetic
The month rebilled at 61,052, tier by tier
Rebill calculatorCorrected use is 5,452 kWh instead of 6,352. The rebill calculator runs each residential tariff tier, the fuel cost adjustment and VAT. The bill of $2,316.97 becomes $1,930.97. The calculator adds the $100.00 service-standard payment owed for a bill issued on a reading later shown wrong. With the $1,900.00 payment, the account ends $69.03 in credit.
$386.00 rebill difference + $100.00 service payment = $486.00 credit. It stays a proposal until the handler signs.
- 07The check
Seven ombudsman decisions on disputes like this one
Precedent checkerThe precedent checker found 7 ombudsman decisions in its look-back where the reader’s photo contradicted an actual reading. Six went for the customer, with awards of $100 to $200 on top of the rebill. In the one the utility won, the customer had only an undated photo against a reader’s photo that matched the bill.
Before the photo was found: “Deciding ‘Not upheld’ goes against 6 of 7 ombudsman decisions on this issue.”
- 08The letter
A final response that cites each item on the scale
Letter writerThe letter writer redrafts the final response in plain words. It covers what we checked, what we found, our decision and the money, and the hold. It also states the right to go to the ombudsman, free, within 12 months. Each paragraph carries the scale items it relies on. The neighbor’s bill is named as considered but not relied on. Six checks run before the letter goes, including the clock, the arithmetic and the hold.
“You told us your household had not changed and that you thought the reading was wrong. You were right, and we are sorry.”
- 09Day 36 of 40
Decided and signed, four days inside the clock
Senior dispute handlerThe credit is within the handler’s signing limit of $2,000, so the handler signs alone. Signing records the decision, the scale as it stands and each weight. The letter goes by email and the utility’s app, and the $486.00 credit goes on the next bill. The hold stays in force until 15 days after the letter.
Meaning of the signature: “I have weighed the evidence on the scale and I decide this dispute.”
- 10The cause
One handheld, 21 readings without their photo
Dispute handler and meter operationsInsights show why. Since a software update, one route’s handheld uploads its photos in a late batch, so they do not link to their readings. Twenty-one readings have no photo. Two are already disputed, this one and another on the same street. One click sends a root-cause note to meter operations.
“The handheld’s photos have uploaded in a late batch since its software update, so they do not link to their readings.”