WorkflowBilling, Credit & Collections

C&I Bill Audit

Commercial and industrial utility bill audit that checks demand charges and multipliers before the bill goes out

See one case, screen by screen ↓
Watch with transcript →

Built forKey-account billing teamsKey account managersBilling operations leadsMeter engineers

The Problem Today

Teams spot-check the biggest bills in spreadsheets, so a wrong meter multiplier can repeat on bill after bill for years.

7.5 h
to check one demand-billed bill by hand, in a spreadsheet our estimate

Four sources, side by side

  • Draft bill
  • Intervals
  • Contract
  • Field order
  • Consistent, so it passesEach figure agrees with the others, so billing validation passes it
  • One wrong peak, many billsIt sets the minimum demand charged for months to come

The Solution

  1. Each draft bill checkedEach key-account bill against its own interval data, before release
  2. Contract and meter readEach contract term cited, and field orders show a mid-month meter change
  3. Demand rebuilt from dataPeak, power factor and time-of-use energy rebuilt from the readings
  4. The specialist stops itThe reason is drafted from the evidence, and the corrected bill follows

Built-in controls

  • Read-only on billing and metering
  • A person sends each customer note
  • Each number cites its source

What You Get

Key-account errors are caught before the customer's energy manager finds them, so fewer refunds and reissued bills follow.

0.8 h
of a person's review per bill, once the agents have rebuilt it our estimate
  • Demand billed that never ranAn old peak scaled with a new multiplier, held before release
  • Wrong bills held out of the runOver- and under-billed accounts stopped before the window closes
  • Under-billing found tooRevenue a wrong bill left out is caught, as well as overcharges
In short

What is C&I Bill Audit?

C&I bill audit software checks a utility's commercial and industrial bills before they are released. C&I Bill Audit puts each demand-billed draft bill beside its own 15-minute data, special contract and meter records. Six agents rebuild demand, ratchet, power factor and time-of-use energy and explain each difference. A key-account billing specialist stops or releases each bill.

How to choose AI solutions for utilities →

Updated

The problem

A wrong bill for a large business still adds up, so it goes out month after month

A utility's largest commercial and industrial (C&I) customers get complex bills, and each one is much more than a meter reading times a price. Demand is the highest 15-minute load of the month, scaled by a meter multiplier. Large sites are metered through current and voltage transformers (CTs and PTs), and the multiplier turns the meter's reading into real kW. That demand is then compared with a contract minimum and a ratchet, a floor set from the last eleven months. Power factor, a measure of how well the site uses power, comes from reactive energy and becomes an adjustment. Energy is split into the time-of-use windows written in a special supply agreement.

When one input is wrong, the bill still adds up. A multiplier may change mid-cycle, a contract amendment may not be loaded, or an estimated interval may be used as the peak. Each number on the bill still agrees with the others, so the billing system's validation passes it. Then the error repeats. A wrong multiplier stays on each bill until someone notices. A wrong peak sets the ratchet floor for the next eleven months. Today a key-account team inside the utility checks a sample of the biggest bills in spreadsheets, next to an interval export. The bill it did not sample is the one the customer's energy manager finds. That means a refund, a canceled and reissued bill, and a hard call with the accounts that carry the most revenue.

typical3yearsof over-charges refunded under PG&E's Electric Rule 17.1 when a bill used an incorrect meter multiplier
typical$357,794over-billed to one university by a US municipal utility, most of it from a CT multiplier error that ran for years
Where the hours go on one complex bill checked by handestimated
By hand7.5 hours
With the solution0.8 hours
  • Pulling the draft bill and the quantities it is billed on0.5 → 0.1 h
  • Exporting the month's 15-minute data and scaling it with the right multiplier1.5 → 0.1 h
  • Finding the special contract, its amendments and the clause that applies1 → 0.1 h
  • Checking field orders for CT, PT and meter changes in the period1 → 0.1 h
  • Rebuilding demand, ratchet, power factor and time-of-use energy2 → 0.2 h
  • Writing the corrected bill and the note to the customer1.5 → 0.3 h

Estimated split of hours for one demand-billed key-account bill. It compares checking by hand in a spreadsheet with the solution, where a person reviews what the agents rebuilt.

How it works

The overnight pre-bill audit of each key-account bill

What comes in
Data in4 sources · draft bills, 15-minute data, contracts, field orders
Agents at work
Draft bill readerlines + determinants
Then
Contract and tariff reader
Meter configuration checker
Then
Interval recalculatordemand · ratchet · PF · TOU
Then
Variance explainer
Correction and note writerbill + note
A person decides
Key-account billing specialiststops or releases each bill
What comes out
Bill stopped or released
Variance explained
Corrected bill + note
One case, step by step

A cold store's September bill, stopped the morning before release

The utility builds its September key-account run on the night of the 10th. The run holds the month's demand-billed draft bills, and the release window closes at 18:00 on the 13th. One of them is for a cold store at a logistics park that added a blast-freezer line in September. Here is what happens to its bill, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Overnight

    Each draft bill checked, the whole run

    Monthly key-account run

    The run is built at 22:00 on the 10th. Each draft is checked against its own 15-minute data, contract and meter records. By morning the release run shows each bill as a dot, placed by money at stake. Most passed all checks. Another 39 are for review, with an explained difference inside the stop rule. And 9 are stopped, with $193,795 of errors: $77,215 over-billed and $116,580 under-billed. Their causes run from a PT ratio keyed wrongly to a winter on-peak window used for a summer month.

    Stop rule: more than $1,000 or 0.5% of the bill

  2. 02Morning

    The draft bill, beside its own 15-minute readings

    Key-account billing specialist

    The specialist opens the cold store's account. On the left is the September bill as the customer will see it, line by line, marked DRAFT · NOT RELEASED. It totals $531,919.53. In the middle are the month's intervals, with the billed demand of 2,480 kW drawn as a dashed line across them. The true interval peak is 2,140 kW, on the 29th at 14:45. That gap of 340 kW is worth $13,940.00 on the demand charge.

    “Recommended: stop · $14,783 over · the specialist decides. A stopped bill is held until its correction is released.”

  3. 03Seconds per agent

    Six agents read the bill, the contract and the field order

    The check run

    The specialist runs the checks again to watch them. The draft bill reader finds 7 lines, with billing demand taken from the maximum-demand register. Next, the contract and tariff reader reads the special supply agreement and its second amendment. It finds 7 billing terms and cites each one. The meter configuration checker finds the field order for a CT change. The interval recalculator rebuilds demand from 2,880 intervals, none estimated. Each step takes between 1.4 and 2.1 seconds.

    “Field order: CTs 200/5 → 300/5 on the 22nd at 10:40 · multiplier 4,800 → 7,200 · billing applied 7,200 to the whole month’s register”

  4. 04The cause

    An old peak, scaled with the new multiplier

    Meter configuration checker

    The meter crew replaced the CTs on the 22nd for the new blast-freezer feeder. With the existing PTs, that took the multiplier from 4,800 to 7,200. The register's highest value was set on the 16th at 14:15, under the old CTs. It read 1,653 kW at ×4,800. Billing read the register once at month end and applied ×7,200 to it, giving 2,480 kW. The account's history shows twelve months billed at their interval peak. September is the first billed above it.

    “CTs replaced 200/5 → 300/5 · multiplier 4,800 → 7,200 · for the new blast-freezer feeder”

  5. 05The contract

    The clause the draft did not follow

    Contract and tariff reader

    The special supply agreement opens with each billing term highlighted and cited in the margin. Peak is the highest of the month's fifteen-minute intervals (5.1). Contract demand is 1,500 kW (5.2). The ratchet is 75% over 11 months (5.4). On-peak runs 12:00 to 18:00 from May to October (6.2). A power-factor adjustment applies below 0.90 (7.1), and any correction needs a written note (9.1). Clause 8.3 is marked “Not followed on the September draft”.

    Clause 8.3: “the billing determinants shall be computed separately for each part of the period, using the ratio in force for that part.”

  6. 06Line by line

    Power factor: the right rate on the wrong base

    Interval recalculator

    Capacitor bank 2 was out from the 9th to the 15th. The month's average power factor is 0.89, from 1,102,670 kWh and 564,890 kVArh, and clause 7.1 adds 1%. But the 1% was taken on a demand charge built from 2,480 kW. On the true demand it is $4,154.33, against the $4,293.73 drafted. Time-of-use energy agrees with the intervals within 0.01%. It was split at the CT change as clause 8.3 asks, so it needs no change.

    “The 1% adjustment is right; what it is 1% of is not.”

  7. 07Mid-morning

    The specialist stops the bill, with the reason on the record

    Key-account billing specialist

    The reason is drafted from the evidence. Billing demand of 2,480 kW is the register peak of the 16th, scaled with the new multiplier of 7,200. The interval peak is 2,140 kW, on the 29th at 14:45. Clause 8.3 was not applied. The specialist signs the stop with their own account. Releasing the bill as drafted would have needed a written reason too.

    “Bill stopped by the key-account billing specialist, signed with the specialist's own account.”

  8. 08Stopped

    What the wrong peak would have done next

    Variance explainer

    The bill is held, and the customer sees nothing until the corrected bill goes out. The variance explainer shows why stopping it matters beyond September. Under clause 5.4, a 2,480 kW peak would hold a ratchet floor of 1,860 kW until next August. The true floor is 1,605 kW. On the winter load forecast, that is 1,105 kW-months over-billed from November to April.

    “1,105 kW-months over-billed, Nov to Apr · $45,305”

  9. 09Five minutes later

    The corrected bill is signed and released

    Key-account billing specialist

    The correction and note writer has drafted the corrected bill beside the draft, line by line. Demand drops from 2,480 to 2,140 kW (−$13,940.00). The power-factor adjustment falls $139.40 and tax falls $703.97. Now the total due is $517,136.16, which is $14,783.37 less. The next 11 bills are listed with the wrong and the true ratchet floor. The specialist signs and releases it in place of the draft.

    “Corrected bill released by the key-account billing specialist”

  10. 10Before the bill lands

    The customer hears it from the utility first

    Key account manager

    The note goes to the key account manager to approve and send to the customer's energy manager, with the finance controller copied. It says in plain words what was found. Larger current transformers went in for the blast-freezer line. Billing scaled the peak of the 16th with the new ratio. The 15-minute readings show a peak of 2,140 kW. The bill and the interval readings are attached. No agent sends anything to a customer.

    “Your September bill is $517,136.16, $14,783.37 less than it would have been. The correct peak will be used for your demand floor over the next eleven months.”

Who it’s for

The four people who stop, release, explain and fix a C&I bill

Four jobs touch each key-account bill. Here is each one's month before the audit and since.

Key-account billing specialist
Stops or releases each bill
Before
Checks the biggest bills in the key-account run in a spreadsheet next to an interval export. Knows that a wrong bill still adds up, which is how it gets through.
Now
Opens each stopped bill beside its own 15-minute data. Each billed number is drawn on the readings, and each difference is explained and cited. Stops or releases the bill, with the corrected bill already drafted.
Billing operations manager
Signs the release of the run
Before
Signs off the run and answers for cancel-and-reissue bills and refunds. One rebill to a key account can cost a quarter of goodwill.
Now
Signs the release of the bills that passed all checks in one step. The 9 stopped and 39 for review stay out until each is decided. Sees errors stopped by month and cause.
Key account manager
Approves and sends customer notes
Before
Looks after 64 accounts, each worth more than $1M a year, and takes the call when a bill is wrong. Would rather explain a bill before it lands than apologize for it after.
Now
Gets the corrected bill and a drafted note in the utility's voice before the bill goes out. Then approves and sends it, with the bill and the interval readings attached.
Meter operations engineer
Keeps meter records right
Before
Swaps CTs and PTs and writes the field order. The billing system's meter record does not always follow.
Now
Sees each key-account meter where the field installation record and the billing system disagree, with the field order as evidence. Gets a record fix raised before the next run.
The agents

What each agent checks in a C&I bill audit, and what it may not touch

Six agents rebuild each key-account bill from its 15-minute data, contract and meter records. The billing specialist stops or releases it.

Draft bill reader

Reads each draft key-account bill from the billing system the night the run is built. It takes the account, tariff, bill period, each line with its quantity and rate, register reads, multipliers and billing demand. It records where each number came from.

  • Read-only on the billing system
  • Never edits or releases a bill
Contract and tariff reader

Turns each special supply agreement, its amendments and the tariff sheet into billing rules. These cover contract demand, ratchet, power-factor terms, time-of-use windows by season, metering-change rules and credits. Each rule is cited to its clause.

  • Each rule cites its clause
  • Never applies a term it cannot cite
  • Unclear clauses go to the specialist
Meter configuration checker

Compares CT and PT ratios, multipliers and change dates for each part of the bill period. It checks the field orders and installation records against the billing system's meter record and against what the draft used.

  • Never changes a meter record or a multiplier
  • Raises a correction for meter operations
Interval recalculator

Rebuilds the bill from the 15-minute intervals, each scaled with its own multiplier. That covers peak demand, the ratchet floor from the last 11 months and the contract minimum. It also covers average power factor from kWh and kVArh, and energy in each time-of-use window. Then it projects the ratchet floor for the next 11 months on the load forecast.

  • Each estimated interval is marked
  • Never uses an estimated interval as a peak without saying so
  • Uses the same calculation as the billing system's tariff engine
Variance explainer

Explains each difference between the draft and the recalculation in one sentence a key account manager can repeat. It gives the cause, the evidence, the money and its direction. Then it recommends stop, review or pass.

  • Recommends only. A person decides
  • Each claim cited
  • Labels uncertainty
Correction and note writer

Drafts the corrected bill lines from the recalculation, and a short note to the customer's named contact in the utility's voice. The note says what was found, the corrected amount and what changes next.

  • Never sends to a customer. The key account manager sends
  • Never releases a bill. The specialist releases
Key-account billing specialist

Stops or releases each bill.

Ask in plain words

Questions on a stopped bill, a contract term or a meter change

Ask about any bill in the run, a contract term or a meter, or say what to change. Answers point to the interval, clause or field order behind them.

Why is the cold store's demand 340 kW too high?

An old reading was scaled with a new multiplier. The CTs were changed from 200/5 to 300/5 on the 22nd, so the multiplier went from 4,800 to 7,200. The maximum-demand register kept its peak from the 16th, set under the old CTs. Billing multiplied it by 7,200, giving 2,480 kW. Clause 8.3 asks for each part of the month to use its own ratio. The 15-minute data peaks at 2,140 kW on the 29th at 14:45.

Which other accounts had a CT or PT change this cycle?

Four meters now differ from their field records. The cold store had CTs changed on the 22nd, and its bill is stopped. A data hall's PT ratio was keyed wrongly, and its bill is stopped ($61,340 under-billed). A sports arena has CT 400/5 on site and 300/5 in billing, marked for the next run. Last, a bottling plant's new meter is not yet linked, also marked for the next run.

What would the wrong peak have cost them over the next 11 months?

Clause 5.4 sets a floor of 75% of the highest billing demand in the last 11 months. At 2,480 kW the floor is 1,860 kW. At the true 2,140 kW it is 1,605 kW. On the winter forecast that is 1,105 kW-months over November to April. That costs $45,305 ($47,570.25 with tax), on top of the $14,783.37 on September.

Add a check: stop any bill whose register peak falls before a meter change

Done. New check: “If a CT, PT or meter changes during the period, rebuild demand from the intervals for each part. Stop the bill if the register-based demand differs.” It runs from the next run. On the last 6 runs it would have caught the same 5 bills the multiplier check did, and 1 more in June (one account, $3,410). You will find it in Settings.

The screens

The audit beside its intervals, the special contract and the corrected bill

From the working solution, on its sample data. Pick one to see it large.

The bill auditThe draft bill line by line beside its month of 15-minute data, with billed demand drawn on the readings. It shows what the agents found, what the wrong peak does next and the decision.
The release runEach draft bill in the monthly key-account run, shown as a dot by money at stake. It marks stopped, for-review and passed bills and the cause of each stop.
The check runSix agents read the bill, the contract and the field order and rebuild demand, ratchet, power factor and time-of-use energy, step by step.
The accountThirteen months of interval peaks against billed demand, the meter and installation history with each field order, the people and recent bills.
The special contractThe special supply agreement with each billing term highlighted and cited in the margin, and the clause the draft did not follow.
Power factorThe daily power factor against the 0.90 contract threshold, the capacitor bank outage, and the adjustment recalculated on the right base.
Meters and multipliersField installation records against the billing system's meter record for each key-account meter, the four that differ, and this cycle's field orders.
Stop the billThe reason drafted from the evidence and the specialist's signature, recorded with the stop.
Bill stoppedThe draft held before release, with the gap on the chart and the ratchet the wrong peak would have locked in.
The corrected billDraft against corrected, line by line, and the next 11 bills with the wrong and the true ratchet floor. Signed and released.
The note to the customerA plain-words note from the key account manager, with the bill and the interval readings attached, sent by a person.
ResultsErrors stopped before release by run and by cause, and cancel-and-reissue bills to key accounts since go-live.
Your rulesThe stop rule, the demand and energy tolerances, and the nine checks, each on or off.
Governance

A person signs each stop and release in the C&I bill audit

Each number cites its sourceEach recalculated number links to its 15-minute intervals, its contract clause or its field order. The link appears on the audit screen, in the correction and in the note to the customer.
Read-only on billing and meteringThe agents read the billing system, interval data, the contract store, field orders and meter records. They cannot write to any of them, change a multiplier or edit a bill.
A person stops or releases each billOnly a key-account billing specialist stops or releases a bill, signed with the reason recorded. A bill the agents would stop can be released as drafted only with a written reason. A stopped bill is released only with a corrected bill or a written reason.
The run is released with a signatureThe billing operations manager signs the release of the bills that passed all checks. Stopped bills and bills for review stay out of the release until each one is decided. A bill still stopped when the window closes stays held and is reported.
Customers hear from a personNotes to customers are drafted by an agent and approved and sent by the account's key account manager. An agent does not send them.
Checks and decisions on the activity trailThe trail records who did what and when. It covers the run being built, each agent's finding, each stop and release, and each change to the stop rule. For example, the billing operations manager changed the stop rule to $1,000 or 0.5% the day before the run.
Configuration

Stop rule, tolerances, nine checks and who signs each bill

When a bill is stopped, what the audit checks and who decides are settings, chosen by the billing team. A change applies from the next run. The run in progress keeps its rule.

SettingDefaultChoose from
Stop a bill when the difference is more than$1,000 or 0.5% of the billAny amount in dollars, or a percentage of the bill
Demand tolerance0.5% or 5 kW, whichever is largerA percentage or a number of kW
Energy tolerance0.2%A percentage of the billed energy
Checks9 onDemand against the interval peak. Ratchet, from the last 11 months. Contract minimum demand. Multiplier for each part of the period. Power-factor adjustment and its base. Time-of-use windows by season. Estimated intervals at the peak. Contract amendments loaded. Tariff assigned to the supply voltage. Each one on or off
Stop or release one billKey-account billing specialistsThe named key-account billing specialists
Release the runBilling operations managerThe billing operations manager signs the release and also changes the stop rule
Approve and send a customer noteKey account manager of the account14 key account managers
ClockBuilt 22:00 on the 10th · window closes 18:00 on the 13thChecks finish by 06:00 on the 11th. A bill still stopped at the close stays held and is reported to the billing operations manager
Connections

The six source systems behind each key-account bill audit

Billing systemdraft key-account bills, their lines and billing determinants, and the billing meter record
Interval and demand datathe month's 15-minute readings for each meter, active and reactive energy
Special contracts and tariffsspecial supply agreements, their amendments and the tariff sheets
Meter installation recordsCT and PT ratios, multipliers, meter exchanges and recertifications
Field ordersCT, PT and meter work on key-account sites, with the date and the crew
Load forecasteach account's forecast peaks, to project the ratchet floor for the next 11 bills
What it changes

Errors held before release and fewer reissued key-account bills

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
cancel-and-reissue bills to key accounts is the design goal. Each bill is checked against its own 15-minute data before release
each bill, each month
checked in full
demo
$2.4M
a year of bill errors stopped before they reach a customer, on sample inputs
Found by the customermonths or years later
With agentsbefore release
typical
3years
of refunds a wrong meter multiplier can run up, closed in its first month
Refund windowup to 36 months
With agents1st month

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” means our estimate on sample inputs, to be replaced by the customer's own. The hours split for one demand-billed bill, 7.5 hours by hand and 0.8 with the solution, is also our estimate. “typical” means published figures. In 2014, vermontbiz.com reported on billing errors at Burlington Electric Department. One was $357,794 over-billed to the University of Vermont, an amount that included a CT multiplier error. Under PG&E Electric Rule 17.1, an incorrect meter multiplier is a billing error and over-charges are refunded for 3 years. Names on the screens are sample data.

Questions

What key-account billing teams ask about a C&I bill audit

What is C&I bill audit software?

C&I bill audit software checks a utility's commercial and industrial bills before they are released. C&I Bill Audit puts each demand-billed draft bill beside its own 15-minute data, special contract and meter records. Six agents rebuild demand, ratchet, power factor and time-of-use energy and explain each difference. A key-account billing specialist stops or releases each bill.

How does a pre-release bill audit work?

The monthly key-account run is built at 22:00 on the 10th. The whole run is checked overnight, instead of a sample. Bills inside the tolerances pass. Those with an explained difference inside the stop rule go for review. Bills above the stop rule are recommended for a stop, with the corrected bill drafted. In the sample setup the stop rule is $1,000 or 0.5% of the bill. People decide each one before the release window closes.

How does it catch a meter multiplier error?

The meter configuration checker compares the CT and PT ratios in field orders and installation records with the billing system's meter record. It does this for each part of the bill period. The interval recalculator scales each 15-minute interval with the multiplier in force at that moment. In the sample case, a CT change led billing to scale an old register peak with the new multiplier. That showed up as 340 kW of billed demand above the true interval peak.

Does it check demand ratchets, power factor and time-of-use charges?

Yes. It rebuilds the ratchet floor from the last 11 months and the contract minimum. Average power factor comes from kWh and kVArh, with the adjustment on its correct base. Energy is rebuilt for each time-of-use window by season. The audit also projects what a wrong peak would do to the ratchet over the next 11 bills.

What happens to a bill it stops?

It is held, and the customer sees nothing. The specialist signs the stop with the reason on the record. They review the corrected bill drafted beside the original, then sign and release it in place of the draft. A note explaining the correction goes to the key account manager to approve and send.

Can the agents release a bill or write to a customer on their own?

No. The agents have read-only access to the billing, interval, contract and meter systems. They recommend and draft, and they stop short of releasing a bill or sending to a customer. Specialists stop or release bills, and the billing operations manager signs the release of the run. Key account managers send customer notes.

Can we set our own stop rule, tolerances and approvers?

Yes. The stop rule, the demand and energy tolerances and each of the nine checks are all settings. So is the run's clock, and so is who may stop or release a bill or release the run. Who sends customer notes and who fixes meter records are settings too. A change applies from the next run.

Which of our records does the audit need to start?

Your tariffs, a sample of special contracts, interval data and past bills. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own demand-billed accounts first.

Audit a month of your own
demand-billed key-account bills.

We'll run C&I Bill Audit on a sample of your own demand-billed accounts and their interval data.