- Before
- Checks the biggest bills in the key-account run in a spreadsheet next to an interval export, knowing that a wrong bill still adds up, which is how it gets through.
- Now
- Opens each stopped bill beside its own 15-minute data, with each billed number drawn on the readings and each difference explained and cited. Stops or releases it; the corrected bill is already drafted.
A cold store's September bill, stopped the morning before release
The utility builds its September key-account run on the night of the 10th: the month's demand-billed draft bills, with the release window closing at 18:00 on the 13th. One of them is a cold store at a logistics park that added a blast-freezer line in September. Here is what happens to its bill, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Overnight
Each draft bill checked, the whole run
Monthly key-account runThe run is built at 22:00 on the 10th and each draft is checked against its own 15-minute data, contract and meter records. By morning the release run shows each bill as a dot by money at stake: most passed all checks, 39 are for review with an explained variance inside the stop rule, and 9 are stopped with $193,795 of errors ($77,215 over-billed, $116,580 under-billed), from a PT ratio keyed wrongly to a winter on-peak window used for a summer month.
Stop rule: more than $1,000 or 0.5% of the bill
- 02Morning
The draft bill, beside its own 15-minute readings
Key-account billing specialistThe specialist opens the cold store's account. On the left is the September bill as the customer will see it, line by line, marked DRAFT · NOT RELEASED: $531,919.53. In the middle are the month's intervals, with the billed demand of 2,480 kW drawn as a dashed line across them. The true interval peak is 2,140 kW on the 29th at 14:45. The gap is 340 kW, $13,940.00 on the demand charge.
“Recommended: stop · $14,783 over · the specialist decides. A stopped bill is held until its correction is released.”
- 03Seconds per agent
Six agents read the bill, the contract and the field order
The check runThe specialist runs the checks again to watch them. The draft bill reader finds 7 lines and billing demand taken from the maximum-demand register. The contract and tariff reader reads the special supply agreement and its second amendment: 7 billing terms, each cited. The meter configuration checker finds the field order for a CT change. The interval recalculator rebuilds demand from 2,880 intervals, none estimated. Each step takes between 1.4 and 2.1 seconds.
“Field order: CTs 200/5 → 300/5 on the 22nd at 10:40 · multiplier 4,800 → 7,200 · billing applied 7,200 to the whole month’s register”
- 04The cause
An old peak, scaled with the new multiplier
Meter configuration checkerThe meter crew replaced the CTs on the 22nd for the new blast-freezer feeder, and with the existing PTs the multiplier went from 4,800 to 7,200. The register's highest value was set on the 16th at 14:15, under the old CTs: 1,653 kW at ×4,800. Billing read the register once at month end and applied ×7,200 to it: 2,480 kW. The account's history shows twelve months billed at their interval peak; September is the first above it.
“CTs replaced 200/5 → 300/5 · multiplier 4,800 → 7,200 · for the new blast-freezer feeder”
- 05The contract
The clause the draft did not follow
Contract and tariff readerThe special supply agreement opens with each billing term highlighted and cited in the margin: peak as the highest of the month's fifteen-minute intervals (5.1), a contract demand of 1,500 kW (5.2), a 75% ratchet over 11 months (5.4), on-peak 12:00–18:00 from May to October (6.2), the power-factor adjustment below 0.90 (7.1) and a written note for any correction (9.1). Clause 8.3 is marked “Not followed on the September draft”.
Clause 8.3: “the billing determinants shall be computed separately for each part of the period, using the ratio in force for that part.”
- 06Line by line
Power factor: the right rate on the wrong base
Interval recalculatorCapacitor bank 2 was out from the 9th to the 15th, and the month averages a power factor of 0.89 from 1,102,670 kWh and 564,890 kVArh, so clause 7.1 adds 1%. But the 1% was taken on a demand charge built from 2,480 kW: on the true demand it is $4,154.33, against the $4,293.73 drafted. Time-of-use energy agrees with the intervals inside 0.01%, split at the CT change as clause 8.3 asks, so it needs no change.
“The 1% adjustment is right; what it is 1% of is not.”
- 07Mid-morning
The specialist stops the bill, with the reason on the record
Key-account billing specialistThe reason is drafted from the evidence: billing demand of 2,480 kW is the register peak of the 16th scaled with the post-change multiplier of 7,200; the interval peak is 2,140 kW on the 29th at 14:45; clause 8.3 was not applied. The specialist signs the stop with their own account. Releasing the bill as drafted would have needed a written reason too.
“Bill stopped by the key-account billing specialist, signed with the specialist's own account.”
- 08Stopped
What the wrong peak would have done next
Variance explainerThe bill is held, and the customer sees nothing until the corrected bill goes out. The variance explainer shows why stopping it matters beyond September: under clause 5.4, a 2,480 kW peak would hold a ratchet floor of 1,860 kW until next August. The true floor is 1,605 kW. On the winter load forecast that is 1,105 kW-months over-billed from November to April.
“1,105 kW-months over-billed, Nov–Apr · $45,305”
- 09Five minutes later
The corrected bill is signed and released
Key-account billing specialistThe correction and note writer has drafted the corrected bill beside the draft, line by line: demand 2,480 → 2,140 kW (−$13,940.00), power-factor adjustment −$139.40, tax −$703.97. Total due $517,136.16, $14,783.37 less. The next 11 bills are listed with the wrong and the true ratchet floor. The specialist signs and releases it in place of the draft.
“Corrected bill released by the key-account billing specialist”
- 10Before the bill lands
The customer hears it from the utility first
Key account managerThe note goes to the key account manager to approve and send to the customer's energy manager, with the finance controller copied. It says what was found, in plain words: the larger current transformers for the blast-freezer line, the peak of the 16th scaled with the new ratio, the 2,140 kW peak in the 15-minute readings. The bill and the interval readings are attached. No agent sends anything to a customer.
“Your September bill is $517,136.16, $14,783.37 less than it would have been, and the correct peak will be used for your demand floor over the next eleven months.”