- Before
- Rebuilds four bids by hand in a spreadsheet, and finds the exclusions in the appendices late, or not at all.
- Now
- Opens a leveled table showing what each bid really costs over three years, with a page behind each cell. Sends each question personally.
Four facilities bids, each priced a different way, leveled to one signed award
The company ran a facilities RFP for seven sites in the Netherlands, Belgium and Germany. It covers 184,600 m² over a three-year term. Four bids came in, here called A to D, and no two priced the work the same way. Here the sourcing manager works through them with the agents, one screen at a time, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01After the close
Four bids, already rebuilt into the RFP's own cost lines
Sourcing manager, facilities and servicesThe sourcing manager opens the RFP, and the agents have already done the leveling. Each bid sits in the RFP's cost lines over three years. Each cell has a confidence and a "from p.N" tag showing its page. The exclusions are written under each column. Bid A has the lowest headline price at €1,840.0k. Once the bids are put on the same basis, Bid B is lowest at €2,038.7k and Bid A falls to third.
Bid A, lowest on the headline, moves to third at €2,210.0k. It left out €370.0k and costs €171.3k more than Bid B. All four bids add back up to their own totals.
- 02One click
Each number opens the page it came from
Sourcing managerThe sourcing manager clicks the tag on Bid A's out-of-hours line, +€214.6k. Page 14 of Bid A's commercial bid opens. It is Appendix C, the schedule of rates. The sentence that excludes weekend and public-holiday call-outs from the fixed fee is highlighted. So are the rates, €95 a call-out and €50 an hour. The normalizer priced the RFP baseline of 1,480 call-outs at Bid A's own rates.
Sealed bid. This view is logged in the sourcing manager's name.
- 03“Show how it was leveled”
The arithmetic, replayed line by line
NormaliserThe table starts from the headline prices as submitted. The normalizer then replays each step with its source. Bid A's yearly price rise is CPI + 3.5% from year 2, where CPI is the consumer price index. The cap is CPI, with a maximum of 3%, so the difference adds €66.2k (page 31). Mobilization is quoted separately (+€43.2k). The 2.5% surcharge for 60-day payment adds €46.0k. Bid C's pounds are converted at the bid-close rate of 1.1494. Finally, a cross-check re-adds each rebuilt bid to its own total, and 4 of 4 match.
The normalizer does not price an exclusion without a rate from the bid or the RFP. With no rate, it asks for a question.
- 04Agent work
What each agent did, what it read, and what waits for a person
The agentsEight agents show their work. Each has its plan and steps, the sources it read, its tools, a confidence and the person it hands to. The bid reader rebuilt 212 pages. Bid D's price workbook was locked, so the reader asked for the password through the portal instead of guessing. The normalizer could not price Bid C's payment terms and left them as an open question. Three agents are waiting for a person.
95% confidence. Below 85%, the agent hands to a person.
- 05Requirements
Six gaps in three bids, proposed for a person to decide
Compliance checkerThe compliance checker tested 18 mandatory requirements against each bid's certificates and terms. Bid B meets all 18. Bid A caps liability at €1,000,000 per event, against the €5,000,000 required. Bid D's ISO 45001 safety certificate has expired, and its bid is valid for 60 days against the 120 asked. The sourcing manager opens Bid A's gap and reads the clause beside the contract template. A reason code is required, and they choose Deviation to clarify before award.
The compliance checker proposes, and you decide.
- 06Questions
Nine questions drafted, one sent to all four bidders
Challenge agentThe challenge agent drafted a clarification question for each gap the agents could not close. Each is linked to its cell or requirement. One asks whether the 1,480 call-out baseline includes public holidays. That question is about the RFP itself, so it goes to all four bidders without naming who raised it. Replies are due through the sourcing portal by a set deadline.
Nothing is sent until you press Send. The challenge agent may not invite a change of price.
- 0713 minutes later
Bid A replies, and the leveling is confirmed
Challenge agentThe sourcing manager sends the first question to Bid A. Thirteen minutes later, the bidder confirms that the €95 call-out and €50 hourly rates apply at all seven sites for the full term. The challenge agent reads the reply and confirms the rates the normalizer used. The out-of-hours line stays at +€214.6k, and its confidence rises from 92% to 99%.
- 08Scoring, prices sealed
The panel scores quality from cited passages
Evaluation panel memberA site operations lead on the panel scores service delivery from 0 to 5 against the descriptors. Beside them are the evidence gatherer's passages for each bid, 142 in all, each with its page. The panel member sees no price, cost line or price score. A score for Bid D cannot be submitted without a rationale and at least one ticked passage it relies on. Another panel member declared past work for Bid C's company, so they cannot open or score Bid C.
Price is sealed. Panel members do not see any price, cost line or price score until the quality scores are locked.
- 09Moderation
One agreed score with a reason, and no average
Category manager, chairThe moderation checker flagged Bid A's service delivery scores of 5, 5 and 3. One panel member's rationale cites no passage. And the staffing plan on page 44 names a mobile team of six engineers for weekend cover. The chair, who does not score, records an agreed score of 5 with the reason. Then the chair records Bid B's sustainability at 4 and locks moderation. Only then does the price envelope open to the panel.
No average is offered. The panel agrees one score.
- 10Signed
The director signs with a reason code
Procurement directorThe award writer recommends Bid B at €2,038.7k over three years, scoring 88.00 of 100. That is €247.3k below the current supplier's baseline and €171.3k below Bid A's true cost. Bid B stays first for any price weight from 20% to 60%. The sourcing manager approves the shortlist and sends it for signature. The director signs with the reason code Most advantageous bid on the published criteria. The three debrief letters are drafted and go out only when the sourcing manager sends them.
I have read the leveling, the moderation record and the declarations of interest.