WorkflowInternal Audit & SOX Compliance

Audit Workpaper Review

Audit workpaper review that reads every workpaper against the Standards before the manager opens it

See one case, screen by screen ↓
Watch with transcript →

Built forAudit managersSenior auditorsStaff auditorsQuality assurance leadsChief audit executives

The Problem Today

Managers read each workpaper in full, then read each answer to their notes, so review is the slowest step in an audit.

What the manager checks by hand

  • Population
  • Sample
  • Exceptions
  • Conclusion
  • Answers go uncheckedOnly the manager re-reads the preparer's fix
  • Findings with no root causeExceptions written up without finding the cause

The Solution

  1. Read the way a manager readsObjective, population, sample, testing, exceptions and conclusion
  2. Weak notes withdrawn firstA standards checker drops the notes it can't support, and says why
  3. Answers re-checked on proofEach answer is tied to the attached evidence before the note clears
  4. The manager signs it offMarked reviewed only when each note clears, with a reason code

Built-in controls

  • Agents hold no sign-off permission
  • Only your methodology, in approved versions
  • Tamper-evident trail for the external assessor

What You Get

Gaps get fixed during the engagement, before the quality team samples the file.

  • Findings with a real causeCondition, criteria, cause and effect, with the cause found in change logs
  • Reports tied to the fileEach figure, date and rating checked against its workpaper
  • Quality review from the recordSample and checklist pre-filled from notes and sign-offs
In short

What is Audit Workpaper Review?

Audit Workpaper Review gives internal audit a first-pass review of each workpaper and draft report before the audit manager opens them. Seven agents share the work. They pin cited review notes to paragraphs, check each other and re-check each preparer answer against the evidence. They write findings as condition, criteria, cause and effect, and tie the draft report to the file. The audit manager decides and signs. The QAIP lead and the CAE get their quality picture from the same notes.

How to choose AI solutions for back-office and enterprise work →

Updated

The problem

Managers check every workpaper by hand, and read each one twice

Internal auditors record their testing in workpapers. Each one sets out the objective, the population, the sample, the tests, any exceptions and the conclusion. Before an audit closes, someone senior has to confirm that the work holds up. The Global Internal Audit Standards, in force since 9 January 2025, make this a rule. The supervisor must confirm that the workpapers adequately support the findings, conclusions and recommendations (Standard 12.3). The chief audit executive (CAE) must review and approve the engagement documentation (Standard 14.6). In practice an audit manager reads each workpaper in full and opens the evidence. The manager types review notes into a side panel, waits for the preparer, and then reads it all again.

The same gaps come back every quarter. A population is pulled from a system report and never tied to an independent source. A conclusion claims more than the testing shows. An exception is written up as “isolated”, with no root cause. A sample size has no method behind it. An action in the report has no owner or date. When a preparer marks a note “addressed”, only the manager checks the answer. The rest is found a quarter later, in the sample the quality team checks for its quality assurance and improvement program (QAIP). Or the external assessor finds it, on a visit every five years.

typical93%of audit functions use some AI
typical15%have defined use cases for it
typical5yearsat most between external quality assessments (Standard 8.4)
Where a manager’s review hours go, per workpaperestimated
By hand2.1 hours
With the solution0.8 hours
  • Reading the whole workpaper and opening the evidence0.8 → 0.2 h
  • Writing review notes and finding the Standard behind each0.4 → 0.1 h
  • Checking the preparer’s answers and reading it again0.5 → 0.2 h
  • Rewriting findings as condition, criteria, cause and effect0.2 → 0.1 h
  • Tying the conclusion and the report figures to the file, and signing0.2 → 0.2 h

Our estimated split of the 2.1-hour baseline in the sample data and the 0.8-hour target, by hand and with the solution.

How it works

The review path of one workpaper, from submission to sign-off

What comes in
Workpapers inevery submitted workpaper · and every draft report
Agents at work
First-pass reviewernotes pinned, cited
Then
Standards checkerwithdraws weak notes
Then
Re-checkerties the evidence
Finding writer
Then
Report checkerreport to workpapers
QAIP sampler
A person decides
Audit managermarks reviewed, with a reason
What comes out
Reviewed workpapers
Findings in four parts
QAIP and trends
One case, step by step

A treasury payments workpaper, from first pass to the manager's signature

The company’s internal audit team is closing its treasury payments and cash management engagement. The draft report is due at the end of the month. The payment release workpaper concludes that controls over payment release “operate effectively”. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Thursday, 08:00

    The morning starts with a conversation, before the pile

    Audit manager

    Last night the manager told the agents: “Put Treasury first tomorrow, the draft report is due on the 30th. Tell me what blocks it.” This morning they answer in the same thread. There are 14 workpapers waiting for review and 41 open notes. Overnight, 6 preparer answers were re-checked, with 5 cleared and 1 reopened. Three things block the Treasury report. The payments workpaper has a population never tied to its source, and an exception with no root cause. The draft report says “4,800 payments”. Each point is cited and has one button to open the workpaper, review the finding or check the report.

    “Two notes on the payments workpaper were withdrawn by the standards checker before they reached you; you can see why on the workpaper.”

  2. 0210:21

    Plain-word instructions to the agents

    Audit manager

    The manager types “Remind the preparer about the open notes”. The agents say exactly what they will do. They will send the senior auditor one message, by email and chat. It lists the open notes on this workpaper and one other, each with the paragraph and the Standard it cites. Nothing is sent until the manager presses “Send the reminder”. “Not now” changes nothing, and the approval is recorded on the audit trail.

    “Nothing is sent until you approve.”

  3. 03The evening before, 17:44 to 17:51

    Seven notes in the margin, each pinned to its paragraph

    First-pass reviewer and standards checker

    The workpaper opens as a document with a reviewer’s margin. Two minutes after the preparer submitted it, the first-pass reviewer read it the way a manager would. It went through the objective, population, sample, testing, exceptions and conclusion. It wrote 9 notes in 7 minutes. The standards checker withdrew 2 it could not support, leaving 7, each classed and cited. The meter reads 4 of 7 cleared, with 3 High notes open. The population note matters most. The 20 payments were sampled from a register of 4,812 that was never tied to the bank statements.

    “If the register is incomplete, payments outside it could never be selected, and the sample cannot support the conclusion in §7.”

  4. 04One click

    How the agent got here, and the passage it relied on

    First-pass reviewer

    “How the agent got here” shows each step. It read the workpaper and opened the payment register export: 4,812 rows, $1,941,306,220.14, six accounts. It looked for a completeness tie-out and found none, because the walkthrough workpaper names the report but does not reconcile it. It checked Methodology 5.3 and Standard 14.1, the standards checker agreed, and it wrote the note at 94% confidence. Each citation opens its passage. The two withdrawn notes are listed with the reasons. The risk-based sample size was right, and a “missing” tickmark was in Appendix A.

    Below 70% confidence the reviewer asks the manager instead of writing a note.

  5. 0510:22

    An answer in the margin, and the re-checker ties the evidence

    Senior auditor, preparer

    On the same screen, viewing as the preparer, the senior auditor attaches the treasury-to-bank reconciliation for the half year and sends it. The re-checker opens it and works in view. The 4,812 payments, $1,941,306,220.14, agree to the bank statements. The 3 bank debits missing from the register are bank fees of $1,650.00, each with the bank’s fee code. The period and source are checked too. The population note clears and the meter moves to 5 of 7.

    The re-checker does not clear a note when the numbers do not tie or the answer is opinion. A statement without the reconciliation is reopened as “Evidence incomplete”.

  6. 06The evening before, 17:58

    “Isolated, user error” gets a real root cause

    Finding writer

    Item 9 was one payment of $186,400.00, approved and released by the same user, and written up as isolated. The finding writer searched the IT change log and found the cause. The releaser role had been added to a payments analyst’s profile for a short window, to cover a colleague’s leave. It checked the whole population and found 3 payments, $412,950.00, in that window only. It drafted the finding as condition, criteria, cause and effect, with the management action, owner and date. Then it asked the Group Treasurer to confirm the cause.

    “The rating stays the auditor’s: High, per Methodology 8.2. The writer does not change a rating or a fact.”

  7. 0710:24

    The finding approved, and the conclusion re-tested

    Audit manager

    The manager approves the finding with a reason code and a signature, and the exception note clears, making 6 of 7. The conclusion note said the conclusion was stronger than the testing. It depended on the other two notes, so the reviewer re-tests it now. It proposes a revised conclusion, cited to the population check, the reconciliation and Standard 14.5. The manager can accept it, edit it or reject it with a reason.

    Proposed: “Controls over payment release operate effectively, except for a segregation-of-duties gap during a colleague’s leave. That gap allowed 3 payments ($412,950.00) to be approved and released by one user.”

  8. 0810:25 · signed

    Only the manager can mark it reviewed

    Audit manager

    With 7 of 7 notes cleared, “Mark reviewed” becomes available. Until then it lists the notes still open, and a preparer cannot use it at all. The manager signs with the reason code “All notes cleared”. The workpaper is now signed by its supervisor under Standard 12.3, and the preparer can no longer change it.

    “Signed as audit manager, Finance & Treasury · recorded on the audit trail.”

  9. 09The draft report

    The report tied back to the file

    Report checker

    The report checker reads the draft report against the workpapers and Standard 15.1. It finds three problems. The scope says “4,800 payments” where the workpaper says 4,812. One finding has no owner or due date. The overall rating “Satisfactory” sits beside a High finding, where the rating matrix in Methodology 8.2 says “Needs improvement”. The new finding, written as one paragraph, is already rewritten in four parts. Each change is proposed with its source, and the manager applies, edits or rejects it.

    The report checker does not edit the report. It proposes each change.

  10. 10The quarter’s assessment

    The QAIP sample comes from the same notes

    QAIP lead

    The QAIP sampler reads the 31 engagements closed in Q3, 744 workpapers in all, and proposes 8. Each comes with the reason it was picked. Reasons include a high-risk area, an external auditor relying on the work and a Topical Requirement in scope. Another is a first-year preparer who averages 5.1 notes per workpaper. One pick is at random. For each engagement, the checklist on seven Standards is pre-filled from the notes and sign-offs. The QAIP lead approves the sample and rates each engagement.

    The QAIP sampler does not rate conformance. The QAIP lead does.

Who it’s for

Managers, preparers, QAIP and the CAE around one audit workpaper

A manager, a preparer, the QAIP lead, the CAE and the methodology lead work on the same workpaper. Here is their quarter before, and now.

Audit manager
Supervises and signs workpapers
Before
Reads 40 pages to find the one paragraph that does not hold. Fourteen workpapers wait for review this week, and each answer means another read.
Now
Opens each workpaper with the notes already pinned and cited. Approves or rejects with a reason code, and signs only when each note is cleared on evidence.
Senior auditor
Prepares workpapers, answers notes
Before
Wants to be told exactly what is missing, to fix it the same day. Answers notes between fieldwork days and marks them addressed. Only the manager checks the answer, on the next read.
Now
Sees each note beside its paragraph with what is asked. Attaches the evidence in the margin and knows within seconds whether the re-checker cleared it, and why.
QAIP lead
Runs the quarterly internal assessment
Before
Samples a file three months after the engagement closed, and re-reads closed files against a checklist.
Now
Approves a risk-based sample with the reason for each pick. Rates each engagement from a checklist pre-filled and cited from the notes and sign-offs.
Chief audit executive
Approves documentation, reports conformance
Before
Needs to tell the board the function conforms to the Standards, and show it, from samples re-read months after the files closed.
Now
Sees quality trends by note class and team and approves engagement documentation with a reason code. Reviews a conformance statement drafted from the record, which the CAE then sends.
Audit methodology and tools lead
Administers the methodology
Before
Wants each rule the agents follow to be one the function wrote. Today review notes vary by manager and by the hour.
Now
Sets the note classes, thresholds, sample sizes, reason codes and roles as versions the CAE approves before the agents use them.
The agents

Reviewer, checker and re-checker agents on each workpaper

Each workpaper is reviewed and its notes checked against the Standards. The preparer's answers are re-checked against the evidence before findings are drafted, and the audit manager signs off.

First-pass reviewer

Reads each submitted workpaper like a manager and pins notes to its paragraphs. Each note gets a class, a citation and a confidence. Classes include unsupported conclusion, missing tickmark, sample not traced to population, finding without root cause and IIA standard nonconformance.

  • Never edits a workpaper or marks it reviewed
  • Below 70% confidence it asks the manager instead of writing a note
Standards checker

Tests each note and workpaper against the Global Internal Audit Standards, the Topical Requirements and your audit methodology. It withdraws the notes it cannot support, and says why.

  • Never interprets beyond the written text
  • Judgment calls go to the manager
Re-checker

Verifies each preparer answer against what was attached. It ties the numbers and checks the period and the source, then clears the note or reopens it with a reason.

  • Never clears a note when the numbers do not tie or the answer is opinion
  • Reads the treasury system and bank statements read only
Finding writer

Rewrites findings as condition, criteria, cause and effect. It looks for the cause in change logs and tickets, and sizes the effect on the whole population.

  • Never invents a cause or changes a rating or a fact
  • Asks the auditee to confirm the cause
Report checker

Ties each figure, date and rating in a draft report to its workpaper. It checks the Standard 15.1 elements, such as an owner and a date for each action, and the structure and tone.

  • Never edits the report. It proposes each change
QAIP sampler

Proposes a risk-based quarterly sample of closed engagements. It weighs risk, preparer experience, notes history and external reliance, and pre-fills the conformance checklist from the notes and sign-offs.

  • Never rates conformance. The QAIP lead rates
  • Always keeps one pick at random
Quality trend reporter

Turns notes and reason codes into quality trends by note class and team, and drafts the CAE’s annual conformance statement from the record.

  • Never sends anything to the board. The CAE sends
Audit manager and CAE

Sign off, with reason codes.

Ask in plain words

Open notes, findings and the QAIP sample, asked in plain words

A conversation sits beside each item: Today, the workpaper, the finding, the draft report, the QAIP sample and the trends. Answers cite their sources. When you ask for something to be done, the agents say what they will do and wait for your approval. These answers use the sample data.

What is blocking the payments workpaper from sign-off?

Three of the seven notes are open. The population note says the 4,812-payment register ($1,941,306,220.14) is not tied to the bank statements. So the sample of 20 cannot support the conclusion. The exception note says item 9 is called “isolated” with no root cause. The finding writer found the change ticket and drafted a finding. The conclusion note re-tests itself once the other two clear.

Were other payments affected?

The finding writer checked all 4,812 payments for the same user approving and releasing. Only 3 match, $412,950.00, all inside the window of the change ticket. None fall outside it. All 3 went to known vendors with matching invoices, so no loss is identified.

Which workpapers are past the review SLA?

Two, both in the vendor onboarding engagement. The sanctions screening workpaper has waited 7 working days. The new vendor due diligence workpaper reaches the 5-day SLA today.

Why was the capital projects engagement picked?

Its preparer is in a first year and its workpapers averaged 5.1 notes at first review, against 3.1 for the quarter. The sampler weighs risk, preparer experience, notes history and external reliance, and always keeps one pick at random. The QAIP lead approves the sample and rates each engagement.

The screens

The workpaper margin, the re-check and the QAIP sample

From the working solution, on its sample data. Pick one to see it large.

TodayThe manager’s morning: what waits, the open notes and the answers re-checked overnight. The agents’ summary reads as a conversation, with what needs the manager and one next step for each.
Tell the agents what to doA plain instruction becomes a cited proposal that says exactly what will happen. Nothing is sent until the manager approves.
The workpaper and its marginThe workpaper as a document, with notes pinned, classed and cited beside their paragraphs, a meter of notes cleared and filters by class.
How the agent got hereThe reasoning behind a note, step by step: what it read, what it looked for, the Standard and methodology paragraph, and its confidence.
The preparer answers, and the evidence is re-checkedThe preparer attaches the reconciliation in the margin, and the re-checker ties it, step by step, before the note clears.
A finding in four partsCondition, criteria, cause and effect, each with its evidence. It also shows how the finding writer found the cause, and the management action, owner and date.
The conclusion, re-testedOnce its support changes, the conclusion is re-tested and a revised wording proposed, for the manager to accept, edit or reject.
Mark reviewed, signedAvailable only when each note is cleared or waived. The manager signs with a reason code, recorded on the audit trail.
The draft report, checkedThe draft report with its own margin. It shows figures that differ from the workpaper, actions with no owner or date, and a rating the matrix does not support.
Agents at workThe seven agents, what each did today, and the latest run step by step with its plan, sources and hand-off. Any agent can be paused.
The QAIP sampleA risk-based sample of the quarter’s closed engagements with the reason for each pick and a checklist pre-filled on seven Standards.
Quality trendsNotes per workpaper by quarter, workpapers with no High note, manager review time, what preparers miss most and how each team is doing.
Your methodologyNote classes and the rules that raise them, thresholds, sample sizes, reason codes, roles, notifications and systems, changed only as approved versions.
Governance

Cited notes, re-checked answers and a signed audit workpaper review

Each note cites its sourceEach note names the paragraph it is pinned to, the Standard and methodology paragraph it relies on and the evidence it read. It shows a confidence and the steps the agent took. Each citation opens the passage.
Agents check each other firstThe standards checker tests each note before a person sees it. It withdraws the ones it cannot support and lists them with the reasons. A manager can restore a withdrawn note, with a reason code.
A note clears on evidenceA preparer’s answer is re-checked against what was attached before a note clears. If it falls short, the note is reopened with a reason. A manager can waive a note only with a reason code, and the QAIP lead still sees it.
People sign, with a reason codeOnly the audit manager marks a workpaper reviewed (Standard 12.3). Only the CAE approves engagement documentation (Standard 14.6). Each signs with a reason code. An agent holds no sign-off permission.
A chained audit trailEach action by people and agents is recorded in order. Each entry carries the fingerprint of the one before, so a changed or deleted entry shows. The trail exports as an evidence pack for the external quality assessor or the external auditor.
Your methodology, in approved versionsThe rules the agents follow come from your methodology. Patterns in rejected notes become proposed clarifications. Each change is a new version, and the agents keep using the version in force until the CAE approves.
Configuration

Note classes, confidence thresholds and reason codes for workpaper review

Note classes, thresholds, sample sizes, reason codes and roles are settings. Each change is a draft version the CAE approves before the agents use it.

SettingDefaultChoose from
Note classes and the rules that raise themR-1 population tied to an independent source. R-2 conclusion no stronger than the testing. R-3 tickmarks and legend. R-5 root cause and effect. R-6 sampling method, seed and size. R-7 preparer name, date and Topical Requirement applicabilityEach rule on or off, severity High · Medium · Low
Write a note only above this confidence. Below it, ask the manager70%Any confidence, changed as a draft version
Send notes to the preparer without the manager first, at or above90% confidenceAny confidence, changed as a draft version
Tie-out tolerance for payment reconciliations$0.00 · explained items allowedAny amount, changed as a draft version
Re-run the first pass when a workpaper changes by more than10% of its textAny share of the text
Sample sizes for tests of controlsMethodology table 5.4, by how often the control runs and its riskLow · Moderate · High risk, from annually to many times a day
Review SLA and escalation5 working days from submission · escalate to the CAE 2 working days past itWorking days, and a preparer reminder 3 days after a note is sent
Reason codesMark reviewed RV-01 to 03. Reject NR-01 to 04. Waive WV-01 to 02. Finding FA-01 to 03. CAE approval CA-01 to 02Add a code for waiving or rejecting a note
Connections

Audit management, treasury, ERP and change-ticket systems, mostly read only

Audit management systemworkpapers, notes and sign-offs, two-way, written to only after a person decides
Document storeengagement folders and attachments
Treasury system and bank statementspayment register and audit log, read only, for re-checks
ERPledgers and reports, read only
IT service deskchange tickets, read only, where root causes are found
Identity provider, email and chatsingle sign-on and roles, plus notes, reminders and digests
What it changes

Manager hours and first-review quality with workpaper review agents

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of workpapers reviewed against the Standards before the manager opens them
Todayread only by the manager
With agentsfirst pass on every one
target
63%
of workpapers with no High note at first review, from 41%
no High note
sample baseline: 41%
target
0.8h
of manager review per workpaper, from 2.1 hours
TodayWith agents

“Demo” means seen in the working solution, on its sample engagement data. “Target” means the design goal, measured in the live solution. The 2.1-hour baseline of manager review per workpaper is from the sample data. “Estimated” means our estimate. “Typical” means published figures. In a Gartner survey of 161 chief audit executives (10 Sep 2026), 93% of audit functions use some AI and 15% have defined use cases. The IIA Global Internal Audit Standards 2024 took effect on 9 Jan 2025. The page draws on Standards 12.3, 14.6 and 8.4. Standard 8.4 calls for an external quality assessment at least once every five years. Names on the screens are sample data.

Questions

What audit managers and CAEs ask about audit workpaper review

What is Audit Workpaper Review?

Audit Workpaper Review gives internal audit a first-pass review of each workpaper and draft report before the audit manager opens them. Seven agents share the work. They pin cited review notes to paragraphs, check each other and re-check each preparer answer against the evidence. They write findings as condition, criteria, cause and effect, and tie the draft report to the file. The audit manager decides and signs. The QAIP lead and the CAE get their quality picture from the same notes.

How does it review a workpaper against the Global Internal Audit Standards?

The first-pass reviewer reads the workpaper the way a manager would and opens each attachment. It covers the objective, population, sample, testing, exceptions and conclusion. Each note is classed, pinned to its paragraph and cited to the Standard and your methodology paragraph, with a confidence. The standards checker then tests each note, and withdraws those it cannot support before anyone sees them.

Does a review note close when the preparer marks it addressed?

No. The re-checker opens what the preparer attached and verifies it before the note clears. In the sample data it tied 4,812 payments to the bank statements and explained the 3 differences as bank fees. An answer without the evidence is reopened with a reason. A manager can also waive a note, with a reason code.

Does the AI invent root causes or change ratings?

No. The finding writer looks for the cause in the evidence, such as change tickets and logs. It sizes the effect on the population and asks management to confirm the cause. It does not invent a cause or change a rating or a fact. The significance rating stays the auditor’s.

Can it help with internal audit report writing?

Yes. The report checker ties each figure, date and rating in the draft report to its workpaper. It checks that each action has an owner and a date under Standard 15.1, and flags a rating the rating matrix does not support. It proposes each change with its source, and the manager applies, edits or rejects it. It does not edit the report itself.

How does it support our QAIP and the external quality assessment?

Each note, answer, decision and reason code becomes ongoing monitoring. The QAIP sampler proposes a risk-based quarterly sample with the reason for each pick. It pre-fills the conformance checklist from the notes and sign-offs, and the QAIP lead rates. The trend reporter drafts the CAE’s conformance statement from the record. The chained audit trail exports as an evidence pack for the assessor.

Can an agent mark a workpaper reviewed?

No. Agents do not edit a workpaper or report, mark anything reviewed or send anything to the board. Only the audit manager marks a workpaper reviewed, and only the CAE approves engagement documentation. Both use a reason code and a signature. Instructions to the agents are proposals that wait for a person’s approval.

How do we know the agents review the way our managers do?

Before a pilot engagement, setup tests the agents blind on 20 workpapers your managers already reviewed. In the sample data, agreement was 91%. The Agentic Solution Engine builds and deploys it from your requirements and documents. These are your methodology, sample-size table, rating matrix and reason codes. Setup also connects your audit management system and loads and maps your methodology. It goes live once each quality gate has passed.

Test audit workpaper review
on files your managers already signed.

We’ll run Audit Workpaper Review on workpapers your managers have already reviewed, and show you where the agents agree.