- Sees
- The graft table, the dry run and every record behind a move
- Signs
- Places what the agents could not, keeps moves with a reason and sends batches
Three locations become 52, and one oil skid finds its parent by 09:08
A sales gas compression train sits on three maintenance locations, its lube oil skid filed under Utilities. This is the morning its tree was redrawn, screen by screen.
demoThe gas plant, its maintenance team and these counts are sample data.
- 0108:12
3 locations today, 52 proposed, and one branch waiting for a person
Reliability engineerOn the left, the train as the maintenance system holds it: the compressor package with 1,384 work orders, the gas turbine with 906, the oil skid with 212. On the right, the proposed tree with a level ruler, a code on each functional location and its criticality letter. The agents placed 46 of 52 and left the oil console for a person.
- 0208:12, replayed
Six agents at work, and the count climbs from 3
Reliability engineerThis replay shows how the tree was built. First the drawing reader takes 7 drawings, an equipment list and 3 manuals. Next the history tracer reads 2,502 work orders on the three locations. The hierarchy drafter places branches, each tied to its source, then the shape checker compares the compressor with 5 others of its class before anything is left for a person.
- 03Before placing it
The console feeds two machines, so the drawing cannot choose its parent
Reliability engineerThe citation opens the lube oil console’s sheet. The skid boundary holds the reservoir, two pumps, the coolers, the filters and the rundown tank, with one line out to the compressor bearings and another to the power turbine bearings. That is why the agents stopped: one console, two candidate parents. The default rule points to the driven machine, and a person confirms it.
- 04Before 09:02
Nothing has moved, and the dry run already shows one plan that would break
Reliability engineerHe tries the console under the compressor. The dry run lists what goes with it: 212 work orders, 4 years of history, 5 of 6 preventive plans unchanged and criticality from C to A. Its $1,146,300 rolls up to the sales gas unit instead of Utilities, and posted cost stays as it was. One plan would break: the quarterly oil sample drops off its route.
- 0509:02
The move is kept on its rule, and the broken plan goes to its owner
Reliability engineerHe keeps the move with the reason confirms the rule. Now the skid reads moved, under the compressor, with its new code and criticality A. The side panel names the one thing between this batch and the checker: the planner must settle the oil sample. The engineer cannot fix a plan himself, so the next step is someone else’s.
- 06After keeping it
212 work orders, 9 of them trips of the train
Reliability engineerEvery record behind the dry run is on one page: 209 closed and 3 open, $1,146,300 posted to the skid, and 9 failures that tripped the train. Filters split preventive, corrective and inspection work, and one shows train trips only. The list downloads, so the claim on the dry run can be checked line by line before anyone signs it.
- 0709:04
The quarterly oil sample keeps its crew and its quarter on a new route
Maintenance plannerThe planner’s queue explains the break in plain words. Because the sample sits on a Utilities route built from everything under that unit, the route drops it when the skid leaves and no sample is issued. A proposal puts it on a compression route with the same crew and quarter. He agrees, and open plans fall from 46 to 45.
- 0809:06
0 of 6 opened, and the batch cannot be signed yet
Maintenance engineering leadThe batch reaches the lead with six things to open: the move, the plan fix, the split of the compressor package into 8 locations, and three new branches drawn as a sample. Each counts only when she marks it read, or marks it wrong. Sign stays grey until all six are open, and she cannot sign a batch she sent.
- 0909:08
Six items open, then signed, and the 52 locations wait for their wave
Maintenance engineering leadWith each item open she signs, with the reason matches the drawings. The panel records who sent it and who signed it, and says the batch waits for its wave. Nothing has reached the maintenance system: a signed wave goes to a test copy first, comes back for a read, and loads only in the administrator’s change window.
- 10After the signature
Plant-wide, 9,412 locations become 41,612, and 26 of 61 batches are signed
Reliability engineerThe plant view puts the train back in proportion: 64,218 tags across 9 units, 35,420 of them given a location and 28,798 kept as records under a parent, the lines and local gauges. Each of today’s 9,412 locations has one outcome. The bar across the top now counts 26 of 61 change batches signed.