A blocked flush filter starved the seal, hot oil leaked along the shaft, steam carried it past the isolator and the bearing failed. The technician wrote brg fail, and he was not wrong.
Work order failure coding on 2,318 coker pump notes that all say bearing
A refinery has eight years of work orders across fourteen units. Its delayed coker has 78 pumps, and their notes keep saying bearing. Here is the morning a reliability engineer and a senior engineer settle what those notes really mean.
demoThe refinery, its pumps, the people and every count are sample data.
- 01Morning
412,680 work orders, and the words on the left lead to codes on the right
Reliability engineerThe sorting line draws what technicians wrote against the failure mode, mechanism and cause the agents propose. 168,240 orders were routine, with no failure. Of the 244,440 failure orders, 194,350 have a proposed code, 4,262 are held for a person on safety equipment, 21,386 are not sure yet and 24,442 cannot be coded.
- 02Morning
5,674 pump notes that say only fixed, and none of them guessed
Reliability engineerNarrowed to pumps, the bottom ribbon is the honest one. Notes that say fixed, ok, or same as last time go to cannot code, with the reason, and each row opens the order as it was written. The agent does not guess from an empty note. Those under a year old can still be asked about.
- 03Morning
A gas detector note says false alarm, and the agent refuses to code it
Process safety engineerRelief valves, shutdown valves and detectors go one at a time. A hydrogen gas detector note says false alarm, sensor poisoned. A poisoned sensor can read normal and miss gas, so the agent will not call it a false alarm. It asks whether the detector was bump tested and responded, and leaves impact, severity and detection for her.
- 04Unit 31
2,318 bearing notes, old codes split three ways, and the trace behind them
Reliability engineerAt the coker pumps the old codes on 2,318 bearing notes are bearing fail, other and mechanical failure, as they stood. The trace beside them shows what the agents read: the notes, 1,104 teardown reports and 312 oil samples. They joined 1,940 orders into 418 failures, then left 137 for a person because they cannot be told apart.
- 05The family
1,286 orders where the proof sits in the note or the attachment
Reliability engineerThe family holds the notes with proof: seal, flush, grit, black oil. Each note keeps the mode its own words give. Noise is noise, hot is overheating, a re-align is a follow-on job. The first failure of each is on the seal, external leakage, with the bearing as the dependent failure. Twenty-four of the 25 sampled notes are already read.
- 06The family
Vanadium at 38 ppm in the bearing oil, at a level no bearing makes
Reliability engineerThe one note left to read says brg fail, noise and hot, oil in the housing black. The agent cites four things: the teardown, the work order on the seal leak, the flush flow sitting at 1.4 gal/min against a 4 gal/min minimum, and an oil sample. Opened, the oil sample shows vanadium 38 ppm and nickel 14 ppm, coke metals in a bearing housing.
- 07The family
25 of 25 read and agreed, so the family can be confirmed
Reliability engineerWith the last row agreed, the engineer confirms the family. The dialog says plainly what this is: 1,286 work orders confirmed on a sample of 25, and nothing moves until another engineer has checked. He picks his reason from the list and can add a note for the audit trail.
- 08Second check
The senior engineer answers three rows of her own, outside his 25
Senior reliability engineerThe second check is not a glance at his work. The senior engineer gets three rows the first engineer did not read, opens each one and agrees or disagrees, with the note, the codes and what the agent read beside it. Only then can she countersign or send it back.
- 09Second check
Countersigned, and 1,286 codes move to the Unit 31 wave
Senior reliability engineerShe countersigns. The banner says who confirmed, who answered three rows and what moved: 1,286 codes to the Unit 31 wave for loading. A reopen button sits beside it, because any record can be reopened and any wave reversed.
- 10After
Seal flush at the coker goes from nowhere to first, at $9.4M
Senior reliability engineerThe bad-actor list is recounted only after two people agreed. The coker seal flush takes first place across 52 pumps, and FCC slurry pumps fall to second at $8.9M. Per pump it is far smaller than an FCC slurry pump, and the screen shows that too. A further $4.8M waits on the timing family.