Holds raw data, tracks physical items and proposes record links.
- Never edits a source record
- Reports lost evidence
Root cause failure analysis where an agent argues against the favored cause, people knock branches down on opened records, and the sister machines are found the same day.
Follow day 13 of a slurry pump shaft failure ↓A slurry pump trips in the night and the standby picks up. Within the hour someone says it looks like a bad bearing, the work order gets a bearing code, and the housing is drained without an oil sample. Raw vibration data starts to roll off its system while the parts sit in a shop cage.
Weeks later the investigation team is arguing with a failure code. The vibration history, the lab, the purchase order and the stores record sit in different systems, and nobody is asking where else the same part is turning today.
Built forReliability engineersRotating equipment engineersMetallurgistsReliability managersProcess safety leads
After a failure the first story sticks, and the same weak part keeps running in the sister machine.
Gathered by hand today
Built-in controls
The fix lands on what actually broke the machine, and the panel can show why the other causes fell.
A catalytic cracker slurry pump tripped on vibration in the night, and the standby took over in 38 seconds. The teardown found the shaft cracked through at the coupling keyway. Here is one working day of the analysis.
demoPumps, people and readings in this day are sample data, and so is the refinery.
The cause tree sits under a drawing of the pump train with the break marked in red. The first story, drive-end bearing failed first, has 4 records for it and none against yet. Two branches are already knocked down, each with who proposed and who agreed. The clock says the analysis started 8 hours 53 minutes after the trip.
Asked to argue against bearing first, the agent lays out its case. The 2× rose 52 days before the trip, the bearing tones came only in the last 31 hours, and both 1× and 2× phase drifted as they grew. It says what it could not check, the oil on the day, and names the test that settles it: how old the break is, from the lab.
A 2× rise alone cannot tell a crack from misalignment, and the pump had just been realigned. Phase separates them. Over the weeks before the trip, 1× phase moved from 212° to 251° and 2× phase from 104° to 168°, while the standby pump stayed within 4°. That points to the rotor changing, and the lab has to close it.
Spectra for the three nights before the trip sit one above the other. On the first, 1× and 2× are there with no bearing tone. The inner race tone at 8.4× arrives on the second night with sidebands and grows on the third. On that first night the overall level was still 0.24 in/s, under the 0.30 alarm.
The fracture face shows where the crack started, at the keyway root corner at the hub edge, with ratchet marks from several starts. Beach marks cover about 78% of the section and the final break 22%, square to the axis: rotating bending, not torsion. The drawing asks for a 0.031 in minimum root radius. The lab found 0.005 in.
The investigation lead proposes knocking down bearing first, as a secondary effect, not a cause. The rotating equipment engineer is the second person. She opens the vibration trend, the drive-end spectra and the lab report herself, and only then do agree and disagree become live. Her opens go on the trail with her name and time.
She agrees, and the branch falls with her name on it. The two branches under it, lube oil low and bearing fitted badly, close with their parent and say so: closed with parent, no check of their own. Shaft cracked by fatigue now leads, and the next open question on the tree reads: why did it crack now, and why this pump and not its twin?
The agent traces the shaft through purchasing and stores. Four shafts were bought from a second vendor to a sample, the drawing was never sent, and goods receipt took them as like for like. No change record exists. The agent adds an eleventh branch to the tree, and says plainly where the risk is: the twin pump runs on the same lot today.
The lead's proposal: keep the twin pump running on watch until the failed one is back, then swap and pull its shaft, since it shows no 2× rise or phase drift and its alignment is right. A line under the lot table says to swap the third pump on the lot today, still to be proposed. Before he can agree, the manager opens the vibration trend, the stores record and the keyway lab report.
Decided: running on watch at 0.10 in/s, with its owner named. The lot table shows all four shafts: one broken, two running, one in stores and not yet blocked. Of 23 pumps on the frame, 17 are proposed as clear and need a sampled check by a second person. Three got a new shaft years ago with no supplier recorded, so they stay unknown, never clear.
Lined up on one timeline from vibration, oil, starts and work orders.
| When | What the records show |
|---|---|
| After a seal job | Offset left at 0.000 in, against a datasheet asking for cold offset |
| 52 days before | First 2× rise |
| Three nights before | Overall 0.24 in/s, still under the 0.30 alarm |
| 31 hours before | First inner race bearing tone, at 8.4× |
| The trip | 0.52 in/s, standby running in 38 seconds |
demoSample data, from the working solution. The 2× rise is never called a crack signal: on its own it cannot tell a crack from misalignment.
Six screens the panel, the action owners and the auditor read alongside it.
demoSample data, from the working solution.
Agents gather, line up, argue and trace. The panel keeps these.
Each has one job and a line it holds.
Holds raw data, tracks physical items and proposes record links.
Lines up vibration, process, oil, starts and work orders.
Reads free text and teardowns to sort same mechanism from same words.
Argues against the favored cause and names the settling test.
Proposes which branch a lab result touches.
Finds where the part, lot, vendor or frame runs.
Drafts, rates and chases actions.
Drafts the report and lesson from decisions.
Read only. Raw data is held the day the analysis starts.
Root cause failure analysis is the investigation of why a piece of equipment failed, down to the physical, contributing and system causes. Here agents gather the evidence, line up the timeline and argue against the favored story. People propose and knock down branches on opened records, and a panel signs the cause.
A failure code is written in the first hour, often from the most visible damage. The analysis tests it. In the sample, the work order said bearing, and the shaft had cracked first.
Vibration trends and spectra, process data, shift logs, work orders, drawings and datasheets, purchasing and stores records, and lab reports. Raw data is held as soon as the analysis starts, before it rolls off its system.
The same part, lot, vendor and frame are traced through purchase, stores and work order records while the analysis runs. Where no record exists, a machine stays unknown and is measured at its next opening, and the reliability manager decides what runs.
No. The agent argues against the leading story and names the test that would settle it. A cause is proposed by the investigation lead and agreed by a second person who has opened the records.
Each proposal, each record opened and by whom, each agreement and each agent step, with branches closed alongside a parent shown as not checked on their own. The trail downloads, and so does an evidence pack.
Each deferral judged with everything it leans on, not alone.
1-min demoCritical Spares AnalysisOne case both sides sign, and spares you hold stop being bought twice.
1-min demoPreventive Maintenance OptimizationRoutines that find nothing relaxed, routines that miss failures tightened, each change signed by an engineer.
1-min demoWe’ll take one of your own failures through the timeline, the tree and the search for its sister machines.