- Before
- Runs the disruption bridge and assembles a plan from dispatch, crew control, maintenance control and customer teams, round after round.
- Now
- Opens three rehearsed plans with cost receipts, edits a flight in plain words, asks why, and signs with a reason code.
Disruption management on one storm evening at the Denver hub
A weekday evening at the airline's Denver hub, 16:22 local time. A line of thunderstorms is coming, and 188 flights, 28,289 passengers and 2,540 connections are at risk in the 16:00, 17:30 and 19:00 banks. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0116:21
The agents speak first: “I have three plans.”
Duty managerThe duty manager's Today screen opens on a message from the Recovery agent: “Ground stop likely at 16:40. I have three plans.” Since 15:41 the agents have read 9 feeds, built 11 recovery plans and rehearsed each one. Plan B cancels 14 short flights, swaps a healthy 787 onto the London flight and keeps 2,262 of 2,540 connections for $1.81M. Under “Needs you”: nothing has gone to stations, crews or customers yet, two aircraft are in the departure queue, and one swap waits for maintenance control.
“One decision needs you before 16:40.”
- 02How sure is it?
An early warning with its confidence and its sources
Watch agentThe Watch agent read a convective SIGMET (a line 40 nm wide moving east at 25 kt, tops FL450), the DEN TAF amendment, lightning within 5 nm and an FAA advisory that calls a ground stop probable from 16:40, with a ground delay program likely after. Confidence rose from 0.74 to 0.82. A what-if tries the ground stop at 16:30 or 17:00 to show how sensitive the plans are; it does not change them.
The Watch agent warns and cites its sources. Declaring an event is left to the OCC.
- 03The recovery
The hub's banks, the storm and three plans, side by side
Recovery agentThe Recovery screen draws the DEN day as arrival and departure bank waves from 12:00 to 23:00, with the thunderstorm line from 16:30 to 19:00, the likely ground stop from 16:40 to 18:30 and the ramp closed for lightning from 16:35 to 17:45. Plan A holds and delays for $2.61M with 9 crew time-outs; Plan B thins the 17:30 bank for $1.81M; Plan C cancels early for $2.05M. Each plan is drawn over the real schedule, with its cost receipt below.
“I built 11 plans and rehearsed each against crew duty limits, MEL items, curfews, connections and the DOT tarmac rule; three passed. I recommend Plan B.”
- 04Rehearsal
Eight plans failed, and the duty manager can see why
Four checking agentsThe crew legality, aircraft and MEL, connections and obligations agents rehearse each plan without seeing the planner's reasoning. Plan D kept a 787 with an inoperative APU on the London flight, but MEL 49-11-01 limits that tail to ETOPS 120 minutes and the route needs ETOPS 180. Plan G would land a flight at Santa Ana at 23:24, after the 23:00 curfew. Plan H would take a flight to its 3-hour tarmac limit at 19:05. None of the eight is offered as an option.
“8 plans failed rehearsal. They are not options; they are here so you can see what was tried.”
- 05One sentence
“Keep the Chicago flight, cancel the other one instead”
Duty managerPlan B as proposed cancels a flight to Chicago. The duty manager knows Chicago matters more tonight and types the change: keep it, and cancel a second flight instead. The Recovery agent re-solves Plan B in 8.2 seconds and the four checks run again: still 14 cancellations, connections kept 2,262 → 2,310 (+48), cost $1.81M → $1.84M (+$30,000). The Chicago flight carries 96 connecting passengers, the second flight 48. The duty manager accepts the edit with the reason Customer priority.
Nothing changes until the duty manager presses “Accept the edit”; “Undo” puts Plan B back as proposed.
- 0616:27
Why the second flight cannot wait, answered with the rule
Crew legality agentIts captain and first officer reported at 07:05 and this is their fourth segment, so Part 117 Table B allows 13 hours and their duty ends at 20:05. The earliest slot is 19:10, block-in 21:15, a 1 h 10 min extension. The captain took a 52-minute extension earlier in the week with no 30-hour rest since, so a second one over 30 minutes is not allowed, and no reserve A321neo captain is at DEN before 21:40.
“Canceling and rebooking its 142 passengers costs $41,000 less than a reserve-crew delay after 22:00.”
- 07The London swap
A healthy 787 for London, confirmed by maintenance control
Aircraft and MEL agentOne 787's APU has been inoperative since 21:12 the night before, a category C item under MEL 49-11-01, which limits it to ETOPS 120 minutes. A second 787 came in from SFO at 16:05 with no open items and takes the London flight at 20:05; the first flies a domestic flight to Houston, where ground power and air are confirmed. The maintenance controller confirmed both swaps at 16:20.
The Aircraft and MEL agent does not clear an MEL item or confirm a swap; maintenance control does.
- 08The clocks
Tarmac, refund and curfew clocks in view
Obligations agentTwo flights closed their doors at 16:05 and 16:12, so their 3-hour domestic tarmac limits fall at 19:05 and 19:12. Plan B returns both to the gate by 17:12. The obligations agent warns at 2 h 15 min, starts returns by 2 h 30 min, and keeps the refund queue under the DOT automatic refund rule. In Plan A, four flights would have come within 30 minutes of the limit.
The obligations agent cannot waive an obligation or send a refund.
- 0916:31 · signed
Signed with a reason code; only then does anything move
Duty managerThe signing screen restates the plan (14 cancellations, 22 delays, 4 swaps, 2,310 of 2,540 connections kept, $1.84M, all five checks passed) and what will be sent. The plan is under the co-sign limits of 25 cancellations and $3M, so the duty manager's signature is enough. The duty manager picks the reason Protects connections and customers and signs at 16:31.
“When you sign, the release agent sends the plan to 8 stations, dispatch, ATC, 31 crew members and 5,072 passengers, and tracks each acknowledgment.”
- 10The release
Stations, dispatch, crews and passengers told, each reply tracked
Release agentCancellation and gate notices go to 8 stations, 22 amended releases to dispatch for the dispatcher to sign, 9 slot substitutions from the canceled DEN arrivals, new reports and hotels for 31 crew members, messages to 1,964 passengers on canceled flights and 3,108 on delayed ones, and 410 rooms at six contracted DEN hotels. Each has a time limit and an owner; OMA station is flagged as overdue at 7 of 8.
The release agent sends nothing before signature, and the dispatcher signs each amended release.