WorkflowFlight Operations & Dispatch

Flight Dispatch Release

A dispatch release assembled by agents and checked twice, every line cited, before the dispatcher and the captain sign it

Every release checked before signature, with a source behind every number.

See one case, screen by screen ↓
demo9of 212NOTAMs kept for CV 118 by the weather and NOTAM agent, each with the reason it matters
demo32checkson every release, run by two agents separately; the checker never sees the first answer
target100%of releases checked against the rules and the tail's open MEL items before anyone signs
target30%fewer releases amended after signature
In short

What is Flight Dispatch Release?

Flight Dispatch Release is dispatch release software for Part 121 airlines: seven agents assemble each dispatch release from the flight plan, weather, NOTAMs and open MEL items, run the ETOPS checks and re-check the whole release independently. They raise only what needs a person, as one question with a proposed answer and its sources, in a conversation beside the release. The aircraft dispatcher signs and the captain co-signs on the EFB.

How to choose AI for airlines: a buyer's guide to agentic AI solutions →

Updated

The problem

Why a dispatch release is hard to check by hand

A dispatch release is the joint safety decision behind every Part 121 domestic and flag flight: the aircraft dispatcher and the captain may sign it only if they both believe the flight can be made safely (14 CFR 121.663). The release itself is a few lines — aircraft, trip, airports, alternates, type of operation, minimum fuel and, for ETOPS, the diversion time, with the latest weather attached (14 CFR 121.687). Behind those lines sit the flight plan, six or more forecasts, hundreds of NOTAMs, the tail's open MEL items, the ETOPS alternate windows and the critical-fuel cases, each in a different system.

A dispatcher carries a desk of flights at once, and nothing checks the package as a whole before signature. The hard cases sit between departments: a deferred wing ice-protection channel is a maintenance item, the icing at an ETOPS alternate is a weather item, and the extra fuel is a planning item. When a tail swaps, a forecast drops below alternate minima or a new MEL item opens after signature, the release has to be rebuilt and signed again — and the record has to show why every choice was made.

typical30–200pagesin a pre-flight briefing package (ICAO)
demo4.4per 100releases amended after signature on the sample airline's record before the agents
Where a long-haul release's minutes goestimated
By hand44 days
With the solution12 days
  • Pulling the flight plan, weights and crew into the release6 → 1 d
  • Reading the forecasts for every airport on the release8 → 2 d
  • Sorting the NOTAMs that matter from the rest10 → 2 d
  • Matching open MEL items to the day's weather and alternates6 → 2 d
  • ETOPS windows, diversion time and critical fuel8 → 2 d
  • Final check, signature and the captain's questions6 → 3 d

Estimated split for one ETOPS release on a busy desk, by hand and with the solution, in minutes.

How it works

How a release moves

Seven agents assemble, check and re-check every release and raise only what needs a person; the dispatcher and the captain sign.

What comes in
Sources inper flight · flight plan, weather, NOTAMs, MEL, manuals
Agents at work
Weather and NOTAM agent9 of 212 NOTAMs matter
MEL agentrelief into rules
Then
ETOPS agentwindows and critical fuel
Then
Release agentassembles, asks one question
Checker agentrebuilds it alone
Then
Change agentwatches signed releases
Records agentfiles every version
A person decides
Dispatcher and captainanswer, sign and co-sign
What comes out
Signed release, every line cited
Co-signed on the EFB
Kept with its sources
One case, step by step

One dispatch release, from a conversation on the rack to both signatures

Thursday 15 October 2026, 12:41Z, Desk 7 in Corvane Airways' Denver operations control center. CV 118 to London, a 787-9 on an ETOPS 180 flag release, leaves at 14:20Z. The dispatcher works with the agents in a conversation beside each release: they assemble, check and propose; she asks, decides and signs. Here is what happens next, screen by screen, in the working solution.

  1. 0112:41Z

    Twelve departures, and a conversation with the agents beside them

    Dana Whitfield · Aircraft dispatcher, Desk 7

    Dana's rack shows one flight strip per departure in the next three hours, each with its release state in plain words: 4 ready to sign, 3 with one question, 1 re-release, 1 with the captain and 2 released. The agents assembled 11 releases and checked each one twice; CV 7 is still being assembled, 7 of 9 steps. In the conversation, the ETOPS agent has already flagged CV 118.

    ETOPS agent: “CV 118: MEL 30-11-01 rules out KEF while it forecasts icing. I propose SNN, longest diversion 168 min, and 1,900 lb ETOPS fuel.”

  2. 02One click

    The strip unrolls into release R-118-1015, line by line

    Release agent

    The release agent assembled the release from flight plan OFP 118-1015-03, six forecasts, 212 NOTAMs and three open MEL items. Every line — trip, departure, destination, aircraft, type of operation, crew, alternates, ETOPS diversion time, route, fuel — carries a numbered source. 31 of 32 checks pass; the one that does not is on the ETOPS alternates line: “KEF: MEL relief not met”.

    “One question, Dana. Replace KEF with SNN?”

  3. 03The question

    Wing ice protection is deferred, and Keflavik forecasts icing

    ETOPS agent

    N812CV carries MEL 30-11-01, left outboard wing ice-protection channel inoperative, whose relief allows no ETOPS alternate with forecast icing in its window. KEF's TAF 1206Z forecasts freezing drizzle and moderate icing from the surface to FL100, 19–23Z, across CV 118's KEF window of 19:24–21:58Z. SNN is clear from 19:40 to 22:40Z, and the longest diversion rises from 152 to 168 of 180 minutes.

    Each alternate is checked from its earliest to its latest possible landing, as 14 CFR 121.624 asks.

  4. 04The briefing

    Nine of 212 NOTAMs matter, each with why

    Weather and NOTAM agent

    Runway 16L/34R at Denver is closed 13:00–16:00Z, so the departure moves to 34L and takeoff performance is checked at the planned weight. Heathrow's 09L/27R closes 23:00–05:30 daily, so CV 118 lands on 27L at 23:38Z. Kangerlussuaq's fire cover drops to category 6 from 22:00Z, after its window ends at 21:10Z. Nothing is dropped: every NOTAM set aside is one click away.

  5. 05She challenges it

    “Why 1,900 lb of ETOPS fuel?”

    Dana Whitfield · Aircraft dispatcher

    The ETOPS agent answers in the strip's conversation. ETP 2 (BGSF/SNN) is the most fuel-critical point. Of the three 14 CFR 121.646 cases, decompression with all engines at 10,000 ft needs 41,300 lb, against 40,100 lb with an engine failure added and 33,800 lb for engine failure at FL220. The plan has 39,400 lb on board at ETP 2, so the shortfall is 1,900 lb.

    Each case includes 5% added to the forecast wind, ice accretion with anti-ice in use, APU use and an approach and landing.

  6. 06Maintenance control

    The relief, as the agents read it, goes to maintenance control

    Tom Akers · Maintenance controller

    The MEL screen lists seven open deferrals on tails departing in the next six hours; three change a release. For 30-11-01 on N812CV the MEL agent shows the relief as it read it — “no ETOPS alternate with forecast icing in its window” — and asks Tom to confirm it. Only maintenance control defers or clears an item.

  7. 0712:46Z · Accepted

    Release v4, rebuilt and re-checked

    Release agent and checker agent

    Dana clicks “Accept SNN” in the conversation. The release agent rebuilds the release as v4: ETOPS alternates YFB · BGSF · SNN, longest diversion 168 min, ETOPS fuel 1,900 lb, minimum fuel 142,700 lb, block fuel 146,100 lb. The checker agent re-runs on its own and agrees on 32 of 32. The strip turns “Ready to sign”.

  8. 0813:05Z · Signed

    She signs with the 121.663 statement and a reason code

    Dana Whitfield · Aircraft dispatcher

    The sign window repeats the ETOPS alternates, diversion time, minimum and block fuel, and attaches the DEN METAR 1253Z as the latest weather. Dana ticks “I believe this flight can be made with safety as released”, picks the reason code “MEL relief — ETOPS alternate changed” and can add a note for the captain. She signs at 13:05Z, and the release goes to Capt. Brandt's EFB.

    “Signed with your operations sign-in. The release, its 14 sources and your signature are filed together and kept 24 months.”

  9. 0913:31Z · Released

    The captain reads what changed on her EFB, and co-signs

    Capt. Elena Brandt · Captain, 787-9

    In crew room B the EFB lists what changed since her 12:15Z briefing: ETOPS alternate KEF → SNN, ETOPS fuel +1,900 lb, block fuel 146,100 lb (was 144,200 lb), DEN METAR 1253Z attached at signature, and the dispatcher's reason. She can ask dispatch or the agents, decline with a reason, or co-sign. She co-signs at 13:31Z, and CV 118 is released, filed with its 14 sources.

    “If the captain declines, the release goes back to the dispatcher with the reason, and nothing departs.”

  10. 10Still watching

    After a tail swap, a re-release with a line-by-line difference

    Change agent

    CV 902 to Amsterdam lost N809CV at 12:10Z to a hydraulic leak and moved to N811CV. The change agent voided the signed v1 and drafted v2: trip fuel 111,600 → 112,700 lb, and with HF 2 deferred on N811CV, SATCOM voice becomes the second long-range system. The checker agrees on 32 of 32, v1 stays on file marked void, and both signatures are needed again.

    The change agent never amends a signed release; it always asks both signers again.

Who it’s for

Built for everyone who puts a name on a release.

The same dispatch release, seen by the five people who carry it — what their shift looked like, and what it looks like now.

DW
Dana WhitfieldAircraft Dispatcher · Desk 7, transatlantic and Pacific
Aircraft dispatcher
Before
Builds, checks and signs a desk of releases a shift, joining MEL relief, alternate weather and ETOPS fuel in her head — “I need to know which one line in which one I should doubt.”
Now
Opens each release already assembled and checked twice, answers one question with a proposed answer and its sources, and signs.
CE
Capt. Elena BrandtCaptain, 787-9 · CV 118
Captain
Before
Reads the release on her EFB in the crew room 45 minutes before departure and has to work out what changed — “I'm putting my name on it too.”
Now
Sees what changed since her briefing and why, with sources, asks from the EFB, and co-signs or declines with a reason.
RC
Ray CastellanoChief Dispatcher · DEN operations control center
Chief dispatcher
Before
Audits releases after the fact and answers the inspector's questions — “When the inspector asks why we used Shannon, I want the answer in one click.”
Now
Starts from the releases the agents flagged, with their evidence, records an outcome with a reason and exports any release's evidence in one file.
TA
Tom AkersMaintenance Controller · MCC
Maintenance controller
Before
Defers MEL items and fields dispatch's calls about them — “The relief is in the MEL. Whether it bites today is a weather question.”
Now
Sees which open items change a release today, and confirms the relief the agents applied before dispatch relies on it.
JW
Joel WhitcombOCC Systems Administrator
OCC systems administrator
Before
Connects the planning, maintenance, weather, crew and EFB systems — “Nothing goes live until it reads our OpSpecs, not someone else's.”
Now
Sets the 32 checks, thresholds, roles and connections once; every change is logged with who and why.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents assemble, check and re-check every release and raise only what needs a person; the dispatcher and the captain sign.

Release agent

Assembles each release from the flight plan, schedule, weights and fuel policy with the other agents' work, runs the 32 checks, and raises only what needs a person — one question with a proposed answer, its effect on the release and its sources.

  • Never signs
  • Never changes the flight plan in the planning system without the dispatcher
Weather and NOTAM agent

Reads METARs, TAFs, SIGMETs, PIREPs, icing forecasts and NOTAMs for every airport and the route, tests each forecast against its minima across the times the airport is used, and keeps the NOTAMs that matter with the reason.

  • Never drops a NOTAM silently — every one set aside is listed
  • A newer forecast after signature goes to the change agent
MEL agent

Reads each tail's open deferrals from the maintenance system and turns every (O) and (M) relief condition into rules the weather, ETOPS and fuel agents apply.

  • Read-only on maintenance; never defers or clears an item
  • Maintenance control confirms the relief as read
ETOPS agent

Computes each ETOPS alternate's weather window from earliest to latest possible landing (121.624), the diversion time, critical fuel in three scenarios with 5% wind and icing (121.646), time-limited systems (121.633) and rescue and fire fighting cover (121.106), and proposes the best alternate set.

  • Never proposes beyond the authorized 180-minute diversion time
  • Proposes; the dispatcher decides
Checker agent

Rebuilds every check from the raw sources on its own and compares with the release agent; any disagreement becomes a question to the dispatcher.

  • Never sees the release agent's reasoning
  • A disagreement blocks the ready state until a person decides
Change agent

Watches signed releases for new forecasts, NOTAMs, MEL items, tail swaps, fuel requests and delays; when a release no longer holds, it voids it and drafts the re-release with a line-by-line difference.

  • Never amends a signed release
  • Always asks both signers again
Records agent

Files every version with its sources and both signatures, attaches the latest weather at signature, builds evidence exports and drafts the monthly report.

  • Never edits a filed version
  • Keeps every release 24 months; the rule asks at least three
Aircraft dispatcher and captain

Both sign only if they believe the flight is safe; maintenance control confirms MEL relief. The agents propose; a named person decides.

Ask in plain words

Ask the agents about any dispatch release, in plain words

Ask about any flight, release, alternate or MEL item — or tell the agents what to do. Every answer points to its source.

What needs me before 14:00Z?

Three things. CV 118 has one question: MEL 30-11-01 rules out KEF while it forecasts icing; the agents propose SNN. CV 22 is ready to sign by 13:20Z. CV 902 needs a re-release after its tail swap.

Why does CV 118 need Shannon?

N812CV has the left outboard wing ice-protection channel deferred, MEL 30-11-01, which allows no ETOPS alternate with icing in its window. KEF forecasts moderate icing 19:00–23:00Z; CV 118 could need it from 19:24Z. SNN is clear 19:40–22:40Z.

Show the ETOPS fuel for CV 118

From ETP 2, the decompression case needs 41,300 lb; the plan has 39,400 lb there, so 1,900 lb of ETOPS fuel is added. The three cases follow 14 CFR 121.646.

How many releases were amended after signature last month?

305 of 9,840 in September, 3.1 per 100, against 4.4 per 100 in June to August. Tail swaps were the largest cause (118). Every amended release was signed again by both.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The rack of flight stripsEvery departure in the next three hours with its dispatch release state in plain words, the time it must be signed by, and the agents' conversation beside the rack.
The dispatch release, line by lineRelease R-118-1015 unrolled from its strip: every 121.687 item with a numbered source, 31 of 32 checks, and one question with a proposed answer in the conversation.
ETOPS alternate windows and critical fuelEach ETOPS alternate from its earliest to its latest possible landing against its forecast (14 CFR 121.624): Keflavik's window overlaps forecast icing, Shannon is clear, and the 121.646 critical-fuel cases at ETP 2 follow below.
The NOTAM briefingNine of 212 NOTAMs that matter for this flight, ranked by effect on the release, each with why; weather and every NOTAM one tab away.
MEL deferrals that change a releaseOpen MEL items on every tail departing in six hours, which ones change a release, and the relief for maintenance control to confirm.
Challenge any line of the releaseThe dispatcher asks why 1,900 lb of ETOPS fuel; the ETOPS agent answers in the conversation with the three critical-fuel cases and their sources.
Accept, rebuild, re-checkAfter the dispatcher accepts Shannon, the dispatch release is rebuilt as v4 and the checker agent agrees on 32 of 32 checks: ready to sign.
Sign the dispatch releaseThe 14 CFR 121.663 statement, the reason code, the latest weather attached and a note to the captain, before the dispatcher signs the dispatch release.
The captain's EFB co-signatureWhat changed since the captain's briefing and why, a way to ask dispatch or the agents, and the co-signature that releases the flight with both signatures on record.
Amended dispatch release after a tail swapVersion 1 against version 2 line by line after a tail swap, v1 kept on file as void, and both signatures needed again.
Chief dispatcher reviewYesterday's releases with the four the agents flagged and a random sample, each with its evidence and an outcome to record.
Monthly dispatch release reportReleases signed, questions raised by kind, the median time to answer and releases amended after signature by cause, drafted by the records agent with each figure linked to its releases.
Checks and thresholdsWhen questions reach the dispatcher, when an unsigned release escalates, the discretionary fuel and ETOPS margins, and the 32 release checks each with its rule reference.
Governance

Built for airline operational control: every dispatch release cited, signed and kept.

Every line of the release cites its sourceEach number on the dispatch release and each agent statement carries a numbered source — the flight plan, the TAF, the NOTAM, the MEL item, the OpSpec paragraph — that opens the passage it came from.
Only the dispatcher and the captain signAgents read, ask and propose; signing is locked for them. The dispatcher signs with the 14 CFR 121.663 statement and a reason code when a proposal changed the release, and the captain co-signs on the EFB or declines with a reason.
Two agents that check each otherThe checker agent rebuilds all 32 checks from the raw sources without seeing the release agent's reasoning. A disagreement becomes a question for the dispatcher, never a silent pass.
Maintenance control owns the MELThe MEL agent reads the maintenance system read-only. It never defers or clears an item, and maintenance control confirms the relief the agents applied.
A change means a re-release, signed againWhen a signed release no longer holds, the change agent voids it and drafts the next version with a line-by-line difference. The old version stays on file, and both signers sign again.
Every version kept with its sourcesThe latest weather is attached at signature, every person and agent action is on a log that cannot be edited, and every version is kept 24 months with its sources — the rule (14 CFR 121.695) asks three. Settings changes are logged with who and why.
Configuration

Your dispatch manual, not ours

The thresholds every release is held to, the 32 checks and who may sign are settings, and every change is logged with who and why.

SettingDefaultChoose from
Questions reach the dispatcher by90 minutes before departureAny number of minutes before departure
Escalate an unsigned release to the duty manager at45 minutes before departureAny number of minutes before departure
Discretionary fuel that needs a reason, above3,000 lb (FOM 7.3.6)Any amount in pounds
Warn when the longest ETOPS diversion is within10 minutes of the authorizationAny number of minutes
Open a re-release after a delay of120 minutesAny number of minutes
Release checks32 on, each run by both agentsEach check on or off, with its rule reference
Who signsAircraft dispatchers sign; the pilot in command co-signsLocked — agents can read, ask and propose, never sign
Keep releases, flight plans and load manifests for24 months14 CFR 121.695 asks at least three months
Connections

Works with the systems a release already comes from

Flight planning systemflight plans, routes, fuel and ETOPS points, read-only
Maintenance systemaircraft status, MEL deferrals and ETOPS service checks, read-only
Weather feedMETARs, TAFs, SIGMETs, PIREPs and icing forecasts
NOTAM feeddomestic and international NOTAMs and oceanic track messages
Crew system, EFB and ACARScrew and duty limits, the flight folder and co-signature, messages to the aircraft
Reference documentsOpSpecs, the FOM, the MEL, the ETOPS alternate list and the dispatch manual
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of releases checked against the rules and the tail's open MEL items before anyone signs
32 checks per release
run by two agents, separately
target
30%
fewer releases amended after signature
Before agents4.4 per 100
Target3.1 per 100
demo
14sources
filed with CV 118's release and both signatures; the rule asks three months, kept 24
every line cited
14 CFR 121.695

“demo” = seen in the working solution, on its sample airline data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (ICAO NOTAM 2021 — pre-flight briefings of 30–200 pages). Regulations named as context: 14 CFR 121.663 (both sign only if they believe the flight is safe), 121.687 (release contents, ETOPS diversion time, latest weather), 121.695 (records kept at least three months), 121.624 and 121.646 (ETOPS alternates and critical fuel), 121.633 and 121.106. Corvane Airways, its people, flights and tail numbers are fictional — characters and sample data in the working solution.

Questions

What dispatch and flight operations leaders ask us.

What is Flight Dispatch Release?

Flight Dispatch Release is dispatch release software for Part 121 airlines: seven agents assemble each dispatch release from the flight plan, weather, NOTAMs and open MEL items, run the ETOPS checks and re-check the whole release independently. They raise only what needs a person, as one question with a proposed answer and its sources, in a conversation beside the release. The aircraft dispatcher signs and the captain co-signs on the EFB.

What must a dispatch release contain?

Under 14 CFR 121.687 a domestic or flag dispatch release names the aircraft, trip number, departure, destination and alternate airports, the type of operation and the minimum fuel, and for ETOPS the diversion time, with the latest weather attached. In the solution every one of those lines carries a numbered source, and the latest report for each airport is attached when the dispatcher and the captain sign.

Who signs a dispatch release — can the AI sign it?

No. Only certificated aircraft dispatchers sign and only the pilot in command co-signs, under the joint responsibility 14 CFR 121.663 sets out; signing is locked for the agents. The dispatcher signs with the 121.663 statement and a reason code, and the captain can co-sign or decline with a reason, which sends the release back and nothing departs.

How does it check ETOPS alternates and critical fuel?

For ETOPS dispatch, the ETOPS agent checks each alternate's forecast from its earliest to its latest possible landing (121.624), computes ETOPS critical fuel for the three 121.646 scenarios with 5% added wind and icing, and checks time-limited systems against the diversion plus 15 minutes (121.633) and rescue and fire fighting cover (121.106). On CV 118 it proposed Shannon in place of Keflavik and 1,900 lb of ETOPS fuel, and the dispatcher accepted.

How does it use MEL deferrals in the release?

The MEL agent reads the tail's open deferrals read-only and turns each relief condition into rules the weather, ETOPS and fuel agents apply — for example, no ETOPS alternate with forecast icing while a wing ice-protection channel is deferred. Maintenance control confirms the relief as read, and only maintenance control defers or clears an item.

What happens when a release changes after it is signed?

The change agent watches signed releases for new forecasts, NOTAMs, MEL items, tail swaps, fuel requests and delays. When a release no longer holds, it voids the signed version, drafts the amended dispatch release — the re-release — with a line-by-line difference, has the checker re-run it and asks the dispatcher and the captain to sign again.

How long are dispatch releases kept?

14 CFR 121.695 asks the carrier to keep the release, load manifest and flight plan at least three months. In the solution the records agent files every version with its sources and both signatures for 24 months, a setting, and the chief dispatcher can export any release's evidence in one file.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your OpSpecs, dispatch manual, MEL and a sample of past releases — and it goes live once every quality gate has passed. We will walk you through it on your own releases first.

See it on
your releases.

We'll run Flight Dispatch Release on a sample of your own past releases, against your OpSpecs and dispatch manual.