Works out the tag, unit, job and years a question means.
- Never guesses a tag
- Asks back when two fit
Equipment history search that lays six past turnarounds on one line for any tag, follows its old names, and says plainly what a silent year can and cannot mean.
Follow one exchanger through six turnarounds ↓A planner building a job pack asks whoever was there last time, then searches the maintenance system by today’s tag and reads short work order text. Old job packs, inspection reports and cost close-outs sit in different places, opened file by file.
When a tag was renumbered, its earlier years drop out of the search. And a year with nothing on file reads as clean, though it may mean nobody opened the equipment, or that the paper is lost. Those are opposite messages for the person writing the next pack.
Built forTurnaround plannersReliability engineersInspection engineersRecords stewardsInternal auditors
Equipment history lives in people’s heads and in files nobody opens, and a gap in the record reads as clean.
Searched by hand today
Built-in controls
Planners start each job pack from what was done, found and spent last time, with the source one click away.
A planner is writing the job pack for the hydrocracker’s reactor effluent exchanger, a week after scope freeze. It has 1,180 tubes, six past turnarounds and an old tag from before the plant renumbered.
demoThe refinery, the people and every value on the line are sample data.
The planner asks what was found the last three times the exchanger was opened. Seven agents read the question, follow the old name, search the records and write the answer with numbered sources. Six turnarounds fill one line: what was done, found, hours and spent each time. One year shows no record of an opening, and one cost is marked as resting on a retired record.
Each number opens the page it was read from. The inspection report from the turnaround before last shows the thinnest wall left in service, 0.072 in, against a 0.060 in retirement limit, and pitting at the outlet ends with the cause not stated. The result line is lit on the page, with the inspector’s name and record number.
Comparing two openings side by side shows the hours rising from 1,640 to 2,120. Cleaning salt deposit took 212 of the extra hours, extra inspection at the outlet ends 164, plugging and retest 93, and galled channel cover studs 11. The wall trend sits beside it, marked as arithmetic that nobody has measured.
For the earliest turnaround the line is silent, so the screen shows what was searched. The unit was down that spring. The final worklist, work order index, inspection index, blind list and crane lift log were searched under both names, and none lists it. One invoice line with no tag stays a loose end. It stays that way until a reliability engineer concludes and an inspection engineer agrees.
Each list opens as it is on file, here the crane lift log for that unit, marked as a retired record. The search for both names sits above the page. The panel beside it says what this search cannot rule out: a channel cover can come off and tubes can be tested in place without a lift.
A different silence on a boiler feedwater pump. Every document under its old and new names was searched, and none comes from that year: the unit’s final worklist and work order index are not on file. The screen will not call it opened or not opened. The records steward can be asked to search for the paper.
The planner picks what the next pack needs: plugged tubes reached 19 and then 27 of 1,180, with pitting at the outlet ends; and the job took 2,120 hours, 11 of them on galled channel cover studs. Nothing lands in the draft until a reliability engineer confirms each fact against its sources.
The reliability engineer opens the sources behind each fact, then confirms. Only then do both notes land in the job pack draft as history notes, with the note numbers and who carried and confirmed them. A note is a fact with its source, never a scope decision, and the planner keeps building the pack in the turnaround management system.
A wrong join mixes two machines’ histories, so this is the largest decision on the screens. The batch lists each old name, today’s tag, the match and its evidence, such as a nameplate serial or a retagging register page. The inspection engineer must open a random 12 herself; only her own opens count, and the rest follow only if the sample holds.
The line the planner reads, as it stands before any correction.
| Turnaround | What was done | Plugged, running total | Hours |
|---|---|---|---|
| Six back | No record of an opening found | None | None |
| Five back, under the old tag | Bundle pulled, all tubes eddy current tested | 3 | 1,180 |
| Four back | Bundle pulled; studs galled | 6 | 1,310 |
| Three back | Bundle pulled, all open tubes tested | 12 | 1,640 |
| Two back | Bundle pulled; pitting at the outlet ends | 19 | 2,120 |
| The last | Bundle pulled, all open tubes tested | 27 | 2,260 |
demoSample data, from the working solution.
Six more screens planners, records stewards and auditors use.
demoSample data, from the working solution.
Agents read and cite. Engineers and the records steward decide what a gap means and what changes.
Each one hands to the next, or to the person who decides.
Works out the tag, unit, job and years a question means.
Follows old names through retagging registers.
Searches the document estate by name, year and type.
Reads done, found, hours and spent, each tied to its page.
Lists what was searched for a silent year.
Marks values that rest on retired records.
Writes the plain answer with every statement cited.
Equipment history search answers what was done, found and spent on a tag in past turnarounds. Here a planner asks in plain words, agents follow the tag’s old names through the records, and the answer lays each past turnaround on one line, each value tied to the page it came from.
A maintenance system search finds work orders under today’s tag. This reads job packs, inspection reports and cost close-outs too, follows old names from retagging registers, and shows the years a plain search would miss.
It means the unit’s lists on file were searched under every name the tag carried, and none lists it. The screen shows what was searched and what that search cannot rule out. A reliability engineer decides what it means, and an inspection engineer agrees.
Then the screen says the lists for that unit and year are not on file, and nothing can be said either way. The records steward can be asked to look for the paper.
The planner carries facts, each with its sources. A reliability engineer opens those sources and confirms before they land in the job pack draft as history notes.
It reads the same records for every tag, so any tag on any unit gets its line. Answers resting on retired records are marked, and wrong records are corrected by two people with the old value kept.
Requests joined into one item per job, with due work nobody asked for found and decided.
1-min demoTurnaround Scope ChallengeEvery proposed job heard before freeze, cut or raised on its own history.
1-min demoTurnaround Work Package PlanningEach step cited, and stale ones caught before the crew meets them.
1-min demoWe’ll lay its past turnarounds on one line and show you what each silent year really holds.