States the ask and keeps the requester’s words.
- Never rewrites a requester’s case
Turnaround scope challenge that hears each requested job against what the last openings found, argues both ways from the record, and leaves every ruling to the chair.
Follow a sitting, six days before freeze ↓Review sessions ask the same questions of each item: can it be done on the run, is the risk of waiting acceptable, is the benefit worth the cost. Nobody has the last openings in front of them, so the requester’s rating stands unchecked.
A drum gets opened again at full cost though the last three openings found nothing. A request for routine cleaning hides an exchanger that is getting worse. Inspection work is deferred in a meeting with no trail and no appeal, and sometimes the engineers who proposed the work chair the review.
Built forScope review chairsTurnaround engineersInspection leadsOperations representativesProcess safety managersInternal auditors
Scope gets cut or kept on the requester’s rating, with nobody looking at what the last openings found.
Looked up by hand, if at all
Built-in controls
The freeze holds work the record supports, with every cut named, reasoned and open to appeal.
9,418 requests merged into 6,204 items reach the challenge. Most are signed. Sitting 12 has twelve items left, heard by a chair from outside the turnaround team.
demoPlant, panel and the money on each item are sample data.
The docket shows every item heard before the freeze, by unit, with what is signed and what is open. 4,871 are kept on course, 812 deferred and 521 dropped. Each unit’s list shows the equipment, the job, the discipline, the cost and the proposed outcome, so the chair sees which ones the agent argued up and which down.
The hearing puts the requester’s case on the left in his own words: the drum has been opened every time and operators would rather know than guess. On the right, the agent’s case for cutting it. Between them, the risk matrix: evidence lowers the likelihood mark from possible to almost never, below the line.
Each opening opens its report. The first internal visual found no corrosion, no pitting and no deposits of note. The next two say the same. Wall readings sit at 0.612 and 0.611 in against a 0.437 in minimum, losing under 0.001 in a year. The next internal is not due until after the turnaround after next.
A cut to inspection work cannot be ruled without the inspection lead. She opens the inspection plan and signs the exact proposal: defer to the turnaround after next, with a thickness check on the run by a date, with her as owner. A different outcome would need her signature again. The requester already replied: no objection if the check has a date.
After opening the same plan, the chair rules defer: inside the inspection plan, with a check on the run. On the register goes a line naming who ruled, the second person, the condition and who hears an appeal. The requester has been told. The open count drops by one, and the next item is an exchanger.
The exchanger was put in for routine cleaning. The agent argues the other way: plugged tubes rose from 12 to 19 to 27 across three openings, against a limit of 59 of 1,180, and the thinnest wall fell from 0.083 to 0.064 in. This bundle cannot be cleaned in place. Evidence raises the likelihood mark above the line.
Having opened the last job pack, the chair rules upgrade: the asked scope cannot see the damage. A second name comes from the turnaround engineer. Operations had already replied that it will support the bundle pull. The ruling goes on the register like any other, so a raised job is as traceable as a cut one.
The freeze screen shows where the docket stands: $191.5M as requested, $26.5M moved out, $3.4M added to 143 jobs that were too small, and $168.4M on course. Below it, what stands in the way: items still in a sitting, bulk families unsigned, replies, second signatures and appeals still open. The certificate stays unsigned until each is clear.
The same hearing argued one job down and another up.
| Item | Asked | Last openings found | Ruling |
|---|---|---|---|
| Naphtha feed surge drum | Open and inspect, $184,000 | Nothing, three times; wall steady | Deferred, with a check on the run |
| Reactor effluent exchanger | Routine cleaning, $96,000 | Plugged tubes 12, 19, 27 | Upgraded to a bundle pull with IRIS |
demoSample data, from the working solution.
Six more screens the chair, requesters, the inspection lead and auditors use.
demoSample data, from the working solution.
The agents prepare and argue the case. People decide it.
Each hands its work to the next, then to the turnaround engineer and the chair.
States the ask and keeps the requester’s words.
Finds the last three openings by tag and old tag.
Answers the eight inclusion questions.
Marks likelihood from evidence beside the request’s own mark.
Writes the case either way, or no case.
Reads a reply, checks what it names and retests.
Writes the register line for each ruling.
A turnaround scope challenge tests each proposed job before scope freeze: should it be done in this turnaround, as asked, smaller, bigger, or not at all. Here each item is heard against what its last openings found, the agent argues the case from the record, and an independent chair rules with a reason.
Yes. Each item gets likelihood and consequence on your site’s matrix, with the agent’s evidence-based mark shown beside the requester’s own. A cut at or above your line needs the process safety manager.
No. It argues for more where the record warns, such as plugged tubes rising at each opening, and the chair can upgrade a job as readily as defer one.
The inspection lead concurs on or refuses any cut to inspection work, on the exact outcome proposed. Any inspector can appeal a deferral to a named hearer who is not on the turnaround team.
It goes on the deferral register with who ruled, the second person, the owner, a condition such as a thickness check on the run, and who hears an appeal.
It shows where the record supports a cut and where it does not. Money moved out and money added are both counted, and nothing is cut without a ruling.
Each step cited, and stale ones caught before the crew meets them.
1-min demoTurnaround Schedule Health CheckCollisions the schedule math cannot see, each with a fix a person decides.
1-min demoTurnaround Cost EstimatingOne estimate, walked bar by bar from past actuals, each bar open to its source.
1-min demoWe’ll set each one beside its last openings and show where the record argues to cut, and where for more.