- Before
- Owns the climate numbers in the annual report and the science-based target, but cannot say how much of Scope 3 is real before signing it.
- Now
- Sees each category split by data quality, confirms the large swap-ins and signs figures that already carry their method and source.
A supplier footprint arrives days before the Scope 3 figures close
A mid-size drug maker is closing its FY2025 Scope 3 inventory. The figures close in a few days, and then the auditors arrive. On Monday morning a fine-chemicals supplier sends a product carbon footprint for one intermediate. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Monday morning
How much of the Scope 3 number is real
Head of SustainabilityThe home screen is the FY2025 inventory. It shows 459,400 tCO2e, tonnes of carbon dioxide equivalent, across 10 categories. Of that, 59.8% rests on supplier data, up from 18% in FY2023. Each category is one bar in four layers: supplier product data, supplier company data, average data and spend estimate. Category 1, purchased goods and services, is 316,300 t, and 35,610 t of it is still a spend estimate. Five supplier submissions are waiting to be checked.
“240 suppliers in this cycle · the figures close, then the auditors arrive”
- 0208:12 · one click
The intermediate's footprint, read and matched
Supplier data reader and Factor matcherThe supplier sends a PDF and a PACT data file for the intermediate. PACT is a shared format for product footprints. The supplier data reader pulls out 182 kg CO2e per kg, cradle-to-gate, for January to December 2025, split by mass. Next, the factor matcher finds the purchase line. The company bought 17.1 t in FY2025 for €38.6 M. Today that is a spend estimate of 410 kg per kg, or 7,011 t. The checks run in view, step by step.
“Check passed · above the 250 t auto-accept limit: waiting for a person to confirm the swap-in.”
- 03The evidence
Eight checks, each pointing at its page
Plausibility checkerBoundary, reference period, the split between products and unit all pass. The mass balance holds. Making each kg takes 210 kg of material, and 78% of the solvent is recovered. Both fit the footprint. The figure sits inside the range from the company's own suppliers, 120 to 260 kg per kg. That is also inside the published API range of 50 to 1,000. A third-party limited assurance statement is on page 6. One note: biogenic carbon, the carbon from living sources such as plants, is not reported separately.
“Note only: not material for a synthetic route.”
- 04Confirmed
The gray slice turns green
Head of SustainabilityThe Head of Sustainability confirms the swap-in. The supplier's 7,011 t spend estimate becomes 3,112 t in the product-data layer. Category 1 falls from 316,300 to 312,400 t. Scope 3 is now 455,500 t, with 61.0% on supplier data. The note under the bar says why.
“supplier PCF, PACT-aligned. 182 kg CO2e/kg replaces a spend estimate of 410. Filed as a method change.”
- 05Category 1
Purchased goods line by line, by how real each figure is
Factor matcherCategory 1 is now 84% on supplier data. Product footprints sent by 64 suppliers give 118,602 t. Company totals from 88 suppliers give 142,300 t, split by the company's share of their output. Average data covers 22,900 t, and 28,599 t is still on spend. Each line shows its source and method, and each supplier opens to its evidence.
- 06Same morning
A glass vial footprint is held, and the estimate stays
Plausibility checkerA glass supplier sent a footprint for its 2R tubular vials. It shows 0.21 kg CO2e per vial across 3.3 million vials, or 690 t. But the reference year is 2022, older than the 24-month limit. The footprint also splits emissions by price between vials and tubing sold to other customers. Both checks fail, so the spend estimate of 1,180 t stays.
“Held: two questions drafted for the packaging category manager to send. The spend estimate of 1,180 t stays.”
- 07Follow-ups
Two questions, in the supplier's terms
Category manager, primary packagingThe follow-up writer drafts the letter to the glass supplier. It asks for a footprint for 2024 or 2025. It asks for co-products from the same furnace to be split by mass, citing pages 2 and 4. If no updated footprint is ready, furnace energy and tonnes of glass would let the company work it out with them. Nine drafts wait to be sent, with 21,757 t at stake. The category manager sends this one under their own name.
Settings: “Let agents send follow-ups: Off. A category manager sends each message.”
- 08Year on year
Real change kept apart from a change of method
Plausibility checkerLast year, FY2024, the total was 481,300 t. Since then, renewable power at 14 suppliers took off 9,800 t and solvent recovery at 6 suppliers took off 4,100 t. Higher volumes added 6,200 t. Replacing estimates with supplier data, including this morning's 3,900 t, is a change of method of its own. It is shown on a separate line and kept out of the reduction target.
Swap-ins change how emissions are counted. They do not cut emissions in the atmosphere.
- 09The disclosure
The ESRS E1-6 Scope 3 table, drafted from approved figures
Disclosure drafterESRS E1-6 is the part of the EU reporting standards on greenhouse gas emissions. It asks for gross Scope 3 by category, the main methods behind each and the share from supplier data. Here that is 455,500 t, with 61.0% from supplier data. Category 1 now reads “Ready for approval”. The other nine categories were approved earlier in the month. The method notes are written from the approved figures, and each figure opens to its trail.
- 10Signed
Signed, and the figures are locked for the auditors
Head of SustainabilityThe Head of Sustainability approves Category 1 at 312,400 tCO2e and total Scope 3 at 455,500 tCO2e. The signature uses a password and states its meaning. Once signed, the figures are locked for the auditors. The assurance file is ready to send to the auditor, as a read-only file for 60 days.
“I approve these figures for the FY2025 sustainability statement”