06:42 to 08:12: oily produced water on a pad shoulder, then a ditch
A threaded coupling on a fiberglass water line leaks at a low spot on the pad, about 40 ft from the lease road ditch. The operator stops the pump at 06:47 and reports from his phone.
demoThe pad, the crew, the rule set and each number shown are sample data.
- 0106:52
One report owed, and the water clock already counting
Environmental coordinatorThe first message says about 6 bbl, oily, outside the tank containment, nobody hurt. On that alone one report is owed: notice in 24 hours, then a written report in 10 days. The water report is not owed yet, but its 2 hours already count from discovery, with 1 h 45 m left, and the agent has asked the two facts that would change the answer.
- 0206:52
About 6 by eye, 6.4 bbl by the meters
Environmental coordinatorBehind the volume sits the meter balance from the pad to the water transfer station, hour by hour. Three quiet hours show gaps of 0.2 bbl or less; then 2.9 and 3.5 go missing. That makes 6.4 bbl, with a range of 6.1 to 6.7, so the coordinator sees the sum before it is tested against the 5 bbl rule.
- 0306:58
One reply about the ditch turns one report into three
Field operatorFrom his phone the operator answers, with a photo from the road: yes, it reached the road ditch, a rainbow sheen runs to the culvert, and snowmelt is flowing. The tree lights both branches at once. Three reports are now owed, and the call to the regulator's notification line is due immediately, against a company target of 15 minutes from when the sheen was known.
- 0407:00
Take away the sheen and the immediate call drops out
Environmental coordinatorBefore agreeing, the coordinator tries the other answer on the sheen branch. A banner marks it as a what if: nothing saved, the record and the clocks unchanged. Two reports stay owed and the notification line falls away, so the sheen is the one fact worth being sure of before picking up the phone.
- 0507:09
The call script reads from the record, and the log keeps the reference
Environmental coordinatorAgreeing at 07:03, with the reason facts confirmed by photo, opens the calls. The script lists each fact beside its source, gives the volume as about 6.4 barrels with its range, and says the cause is under investigation. The log will not save without who answered and the reference: call taker 63, NL 250415-117, made 07:09, on time.
- 06After the call
Three empty fields hold the written report back from approval
Environmental coordinatorThe written report to the oil and gas regulator is already drafted in the agency's layout, each filled field marked with its source. Volume recovered and the two notices still to make read not known yet, in red, and each blocks approval, as does the unchecked determination. The draft fills in nothing it cannot source.
- 0708:12
Checked at 08:12, with all three calls made on time
HSE managerBy 07:48 the coordinator has called the environmental regulator and made the online notice, both on time. The HSE manager opens the record, which the check requires, and checks the determination: matches the facts and the rule. The record names who decided at 07:03 and who checked at 08:12, with a timeline drawn from the audit trail.
- 08After 07:52
41 bbl in the vacuum truck, 3.1 of them from the release
Remediation leadThe truck took ditch water mixed with release fluid. The remediation lead records the load, 41 bbl at 6,640 mg/L chloride, and the release share follows from the ditch background and the pad's own water: 7.5%, so 3.1 bbl. Digging out about 22 cu yd stays blocked until a person records the permit and line locate.
- 0908:12
With a source on each field, one person prepares and another approves
HSE managerWith the recovered volume and the three notices in, the report reads 3.1 bbl recovered plus about 2.6 bbl held in pad soil, to be excavated. The coordinator prepares it, the HSE manager approves it, and the preparer is named on the form. Recording the submission stays a person's job, on the agency's own site.