- Sees
- His own spikes, the draft built from his note, and any blank cause the agents left
- Signs
- Submits the log entry; cannot check it
A flare log nobody wrote, and a neighbor notice signed 60 hours ahead
A vapor recovery compressor on a pad tripped in the night when a cooler fan belt broke, and low-pressure flash gas went to the flare for three hours and forty minutes. The operator is holding over for well work. The flare log is not written yet.
demoThe field, its pads, the crew, the households and every reading here are sample data.
- 0105:10, opened 09:20
Five brackets on the trace, one spike with none, and the month at 104%
Field operatorAt 05:10 the agents found meter movement with no log entry and drafted one, unasked. Opening the trace at 09:20, the operator sees the spike flagged No log and the limit track landing at 104% of the monthly volume. Beside it, on the logs alone: 89.4%. The track is labeled a forecast, with the cause not yet confirmed.
- 0209:20
The draft flare log quotes his own shift note, line by line
Field operatorThe draft is tagged a draft, not a log yet. Its cause comes from his note: alarm at 01:10, cooler fan belt broke, gas to the flare through the pressure control valve as designed, pilot lit. New belt on at 04:50. At 05:30 he wrote that the flare log was not written yet. He can edit the cause before it goes on.
- 0309:20
22 meter readings add up to 186.0 Mcf, with no estimate in it
Field operatorOpening the flare meter shows the ten-minute totals from 01:12 to 04:52. The sum is on the screen: 186.0 Mcf over 3 h 40 m, an average of 50.7 Mcf/h and a peak of 54.0. Where a meter exists the agents sum it. A second meter on the compressor discharge cross-checks the lost gas.
- 0409:30
Submitted, and the operator gets no way to check his own entry
Field operatorHe submits it to the field supervisor. The panel now reads that it waits for her, and that he cannot check his own entry. His next step moves on to the Pad 5 flare, where the agents found no note for the window and left the cause blank. Only he can say what happened there.
- 0509:30
Opened one source of two, and the confirm button stays grey
Field supervisorThe supervisor's view counts what she has opened herself: the shift note, not yet the meter. Openings by anyone else do not count. Send back sits beside the locked confirm, and so does not flared gas, which needs a technician's meter check showing a fault. The check on this meter says it reads true, so that route is closed here.
- 0609:48
Confirmed at 09:48, and the bracket goes onto the trace
Field supervisorWith the note and the meter both opened, she confirms the cause. The entry stops being a draft. Her ruling reaches the log, the limit track and each export, and the track changes its tag to cause confirmed. If new facts come in she can reopen it, giving her reason.
- 0709:48
17 households on the notice list, 36 hours to sign
Community liaisonWith the cause confirmed, the neighbor notice is ready for her. Four clocks run across the top from the same sum: now, due at 10:00 p.m. the next day, the forecast crossing a day later, and 36 h 12 m left to sign. She opens the list first: each parcel, and how each household asked to be told.
- 0809:54
Her signature sends nothing until the supervisor signs second
Community liaison, then the field supervisorHaving opened the list and the log entry, she signs at 09:54. The notice now waits for a second signature. The letter says the site will pass its monthly volume, as a forecast and not a measurement, and keeps the 24-hour promise. Its facts come from the record. She can only add one agreed line, never free text.
- 0910:00
Sent at 10:00, 60 hours before the forecast crossing