WorkflowInternal Audit & SOX Compliance

Risk and Control Matrix (RCM) Documentation

A risk and control matrix drafted on the day of the walkthrough, with each row tied to its source

See one case, screen by screen ↓
Watch with transcript →

Built forSOX program managersInternal auditorsProcess ownersExternal auditorsChief audit executives

The Problem Today

SOX teams write up each process three times by hand, so a risk with no control is often found first by the external auditor.

15,581 h
a year for the average SOX program published
40
systems in scope, up from 17 two years before published

Written up again by hand

  • Notes
  • Procedures
  • Screenshots
  • Flowchart
  • Weeks chasing process ownersEdits get lost between versions
  • Controls nobody can testThe wording leaves out who, what, when and how much

The Solution

  1. Drafted from the walkthroughNarrative, flowchart and matrix, each field tied to the recording
  2. Each description is challengedA second agent checks for who, what, when and how much, and disagrees out loud
  3. Gaps found and sizedWhat people say, the procedure and the system are compared, and the exposure sized
  4. Confirmed, then signedThe owner answers in plain words, and the program manager signs the version

Built-in controls

  • No matrix row without a source
  • Preparer and approver must differ
  • Nothing applied or sent unseen

What You Get

Missing controls are found while there is still time to fix them before interim testing.

≈ $240K
of first-draft effort avoided on a 38-process refresh our estimate
  • The matrix stays currentChanges to policies, settings and owners become proposed edits
  • Less chasing of process ownersOne question per row, with a reminder and a date to escalate
  • Auditor pack draftedThe gap list and status, with each number cited
In short

What is Risk and Control Matrix (RCM) Documentation?

Risk and Control Matrix (RCM) Documentation is software that drafts SOX documentation. From a walkthrough recording, your procedures and the system configuration, it drafts the process narrative, the flowchart and the risk and control matrix. Each field of each row cites the moment or paragraph it came from. A challenger agent tests each control description, and a gap agent flags any risk with no control. The process owner confirms each row. The SOX program manager decides each gap and signs the version.

How to choose AI solutions for back-office and enterprise work →

Updated

The problem

SOX teams write each process up three times by hand, and still miss risks with no control

A SOX team documents how each key financial process works and how its risks are controlled. Each process in scope needs three write-ups: a narrative, a flowchart and a risk and control matrix, or RCM. The matrix lists each risk and the control that answers it. It also says who runs the control, how often, whether it is key and which financial statement claims it covers. Today all of this is written by hand. Someone who already sat through the walkthrough meeting writes it up again from notes, procedures and screenshots. Then they chase the process owner by email for weeks to confirm it. The work starts over each time a new system, a deal or a reorganization changes the process. In-scope systems have more than doubled in two years, and each new one means documenting its processes again.

The risk sits in what nobody compares. The narrative often describes the written procedure instead of what people actually do. Control wording such as “reviews AR” (accounts receivable) cannot be tested. A report used in a control has no check that it is complete and accurate. A risk with no control at all slips through until the external auditor finds it during interim testing, as a possible design deficiency. Missing documentation, policies and procedures come up again and again in the material weaknesses companies disclose.

typical15,581hoursa year for the average SOX program
typical17 → 40systemsin scope in two years, and each new one means documenting its processes again
typical238reportsdisclosing material weaknesses in FY2025 filings
Where the first-draft hours for one process goestimated
By hand60 hours
With the solution18 hours
  • Writing up the walkthrough notes8 → 1 h
  • Drafting the process narrative16 → 4 h
  • Drawing the flowchart8 → 1.5 h
  • Building the RCM: owners, frequency, type, assertions and key reports14 → 4 h
  • Comparing with the risk library and each account's assertions6 → 1.5 h
  • Process owner review rounds8 → 6 h

Our estimate of how a 60-hour first-draft refresh for one process splits, by hand and with the solution. It is an assumption to measure in the live solution.

How it works

Walkthrough to narrative, flowchart and control matrix

What comes in
Sources inWalkthrough, SOPs, ERP · recording, policies, configuration
Agents at work
Capture agenttranscript, quality floor
Then
Narrative agent
Flow agent
Then
Matrix agentevery field cited
Challenger agenttests, disagrees
Then
Gap agentsaid · written · configured
Watcher agent
A person decides
Process owner and SOX program managerconfirm, decide and sign
What comes out
Cited narrative and flow
Risk and control matrix
Gaps decided
One case, step by step

Order-to-cash, from the walkthrough recording to a signed risk and control matrix

The company has moved to a new ERP. Five of its SOX processes must be documented again before Q4 interim testing starts, and the first is order-to-cash. The SOX program manager works with the agents as with a team. The agents report what they drafted and found, and the manager asks questions and gives instructions in plain words. Each answer shows its evidence. Here it is, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Wednesday morning

    Four plain numbers, and the agents report in

    SOX program manager

    The program manager opens Today. It shows 3 gaps to decide, 2 rows waiting for the process owner, 4 proposed changes and 31 of 38 RCMs approved this year. Below the numbers, the agents post what they finished and what needs a decision, each with its next step. That includes the drafted order-to-cash matrix, a high gap over manual credit memos, the owner's confirmations and four proposed changes. Beside the thread, the manager can ask the agents anything (“Why is this row low confidence?”) or tell them what to do.

    Watcher agent: “I drafted each redline. None is applied.”

  2. 0211 min 20 s after the walkthrough

    A full RCM draft, with each field citing its moment

    Matrix agent, with the narrative and flow agents

    The walkthrough ran 45:12 with six people. Consent was read at 00:00, and transcript quality was 96%. Seven agents worked from the recording, five documents and the ERP configuration. They drafted a 6-page narrative, a 9-step flowchart and RCM v3.0, with 11 risks and 14 controls, 9 of them key. The program manager clicks the ▶ 12:41 chip on the credit check control. The transcript jumps to the moment a participant describes the check.

    A participant at 12:41: “When the order is entered, the system checks the customer’s credit limit. It blocks the order if it would take them over.”

  3. 03Before anyone confirms

    A second agent disputes a description that cannot be tested

    Challenger agent

    The matrix agent wrote the unapplied cash control as “Weekly, the Head of Order-to-Cash reviews unapplied cash.” The challenger agent disagrees. The wording names no report, no age and no evidence of the review. It proposes a precise wording from the walkthrough at 34:10 and the written procedure. The matrix agent explains why it kept the procedure's wording. Both lines of reasoning are on screen, and a person chooses.

    The challenger agent does not settle its own disagreement, and it does not edit a row.

  4. 04In the narrative

    Conflicts marked, and rewrites shown as tracked edits

    Narrative agent

    The narrative has seven sections, with a citation on each paragraph. Three conflicts are marked where what people said differs from what is written. They cover the change-log review, who can release credit holds and the approval of manual credit memos. Asked to make §5 shorter, the narrative agent shows a tracked edit that keeps each citation. The reviewer accepts or rejects it.

    “Said ≠ written · Walkthrough and system: no approval enforced. Credit memo SOP §5.2: workflow approval above $10,000. Gap raised.”

  5. 05The flowchart

    Nine steps in six swimlanes, with the gap on the map

    Flow agent

    The flow agent draws the process from the narrative. It has six lanes: credit, customer service, warehouse, billing, accounts receivable and the ERP. Each step carries its risk and control markers. Step 7, manual credit memos, carries the gap marker. Clicking it shows the risk, the narrative passage behind it and a plain note that this step has no control.

  6. 06Said, written, configured

    Three sources disagree about manual credit memos

    Gap agent

    The group risk library lists 27 order-to-cash risks. Of these, 11 apply and 10 are covered. One gap is high. Nothing covers manual credit memos that are unauthorized or wrong. The procedure requires Credit Manager approval in the ERP workflow above $10,000. But the workflow covers only credit memos for returns, so manual billing adjustments post with no approval. The cause is that the old control over all credit memos was retired at go-live.

    A participant at 31:40: “Anything over ten thousand we email for an OK, but honestly the system doesn’t stop it. We can post it ourselves.”

  7. 07The decision

    A new control, an interim review and a reason code

    SOX program manager

    The gap agent sized the exposure from the ERP, read-only. It found 41 manual credit memos above $10,000 since go-live, worth $1,186,420. For 12 of them, no approval email was found. The challenger ran the query again without seeing the first result, and agrees. The program manager decides with the reason code for a new control. A new key control will be built as an ERP change before interim testing starts. Until then, a weekly interim review runs and looks back over the 41. The manager refers it to SOX Control Testing as a potential design deficiency.

    “Decision recorded · the new control and the interim review added to the draft as proposed rows.”

  8. 08Due that Friday

    The owner answers in plain words, row by row

    Process owner

    The process owner gets one question per row, with the clip of what was said. So far the owner has confirmed 11 rows and corrected one: the review of goods shipped but not billed covers items over $5,000. On the access review row, the answer is “No”, because IT owns the quarterly access review. The matrix agent turns that answer into a tracked edit that names the ERP application lead as owner. It cites the answer as the source, for the owner to confirm.

    Process owner: “IT owns it. The ERP application lead’s team runs the review every quarter and removes access; I only confirm the billing users.”

  9. 09A policy changes

    The matrix keeps up, and nothing changes without a person

    Watcher agent

    A new credit policy takes effect next month. It raises the threshold for Division Controller approval of credit limits from $250,000 to $500,000. It also lets credit analysts release holds only up to $25,000. The watcher agent drafts the edit for the two controls it touches, with the effect on Q4 testing. It also flags that one control owner moves to another team the same day, which would leave that control with no owner.

    “Accept into the draft · Reject · Ask about it.”

  10. 10Signed

    Approval is possible only when each condition is met

    SOX program manager

    Versions compares v3.0 with v2.4, approved early in the year, field by field. The Approve button turns on only when five conditions hold. The owner has confirmed each row, and each gap is decided with a reason code. Each challenger note is resolved, and each row has a source. The preparer and approver are different people. The program manager picks the reason, ticks the attestation and signs by name.

    “I have reviewed the narrative, the flow, the matrix and each gap decision, and I approve this version as management’s documentation of the process.”

Who it’s for

Process owners, SOX managers and auditors working on one control matrix

One order-to-cash RCM, seen by the five people who carry it, in documentation season before and now.

SOX program manager
Decides gaps, signs versions
Before
Plans testing with the external auditor and answers to the chief audit executive for 38 process RCMs. Finds out late which risk has no control.
Now
Decides each gap with the evidence and its exposure in view. Signs a version only when the owner has confirmed each row.
Process owner
Confirms each row
Before
Gets a matrix by email, then weeks of reminders to say whether it describes what the team really does.
Now
Answers one plain question per row, with the clip attached. When a row is wrong, the owner's own words become the cited correction.
Senior internal auditor
Facilitates walkthroughs
Before
Spends days writing up a walkthrough already sat through, then redraws the flowchart to match.
Now
Edits a cited draft on the same day, settles the challenger's disputes and asks the narrative agent for any rewrite.
External auditor
Reviews approved versions, read-only
Before
Walks through a process again when the documentation cannot be traced back to its source.
Now
Clicks from a control to the moment the owner described it. Gets answers to questions that management has approved.
Chief audit executive
Reports to the audit committee
Before
Pulls together documentation status for the audit committee from spreadsheets and status calls.
Now
Reads one drafted page on what is ready, what is not and what was found, with each number cited.
The agents

Eight agents transcribe, draft, challenge and watch

Agents transcribe walkthroughs, draft the narrative, flowchart and matrix, then challenge and check for gaps. The owner confirms, and the SOX program manager decides and signs.

Capture agent

Prepares walkthrough questions from the prior RCM, the procedures and what changed. Transcribes the recording with speakers and timestamps, scores its quality and splits it into passages.

  • Never records unless the consent notice is read at the start
  • Never drafts from a transcript below the 85% quality floor
  • Deletes the video after 90 days and keeps the transcript with the documentation
Narrative agent

Writes the process narrative in the house template from the transcript, procedures and system configuration. Rewrites a paragraph when asked: shorter, for the auditor or in plain words.

  • No sentence without a source
  • Marks conflicts between what was said and what is written, and never resolves them
Flow agent

Draws the swimlane flowchart from the narrative, with risk, control and gap markers, and redraws it when the narrative changes.

  • No step that is not in the narrative
Matrix agent

Pulls out risks and controls with owner, frequency, type, nature, key status, assertions and key reports. Cites each field and scores its confidence.

  • Never marks a control key without the key control criteria
  • Sends rows under 0.85 confidence to the owner
Challenger agent

Tests each control description against the standard: who, what, when, how much, evidence and precision. Rebuilds a sample of rows blind, without seeing the matrix agent's answers, and disagrees with the matrix agent out loud.

  • Never resolves its own disagreement
  • Never edits a row
Gap agent

Compares the matrix with the group risk library and the assertions of each significant account. Sets what people said against the written procedure and what the system enforces, and sizes the exposure from the ERP.

  • Never decides a gap
  • Never classifies a deficiency
  • Read-only in the ERP
Watcher agent

Watches procedure and policy versions, ERP change tickets, system settings and the staff directory. Proposes the RCM edit with its effect on testing.

  • Never applies a change
  • Never retires a control
Report writer

Drafts the audit committee status, the auditor pack, the gap list and answers to the external auditor's questions, with each number cited.

  • Never sends to the external auditor
  • A person approves each answer
Process owner and SOX program manager

Owner confirms, manager signs.

Ask in plain words

Risk and control matrix answers, cited to the walkthrough, procedure or setting

Ask about a row, a source, a gap or a change, or tell the agents what to do. The same conversation sits on Today, under the matrix and beside each gap. Each answer cites the walkthrough, the procedure or the configuration, and acts on the screen you are on. These answers use the sample data.

Why is the change-log row low confidence?

Two rows are below the 0.85 floor. On the customer change-log review, one participant said it happens every week and another said “most weeks, Mondays”. The procedure says monthly. On the access review row, nobody said who decides on access. Both are with the process owner, due Friday. I have filtered the matrix to show them.

What changed from v2.4?

Against v2.4, approved early this year, there are 3 new controls, 5 changed and 1 retired. The retired one is the old workflow over all credit memos, which is why the credit memo gap exists. The other 6 are unchanged.

How did you find the 41 memos?

I ran a read-only query on billing documents of the manual credit memo type, posted since go-live, above $10,000. It found 41 memos worth $1,186,420. Then I matched each memo to emails in the approver's folder by memo number and amount. Of these, 29 matched and 12 did not ($318,750). The challenger agent ran the query again blind and got the same result.

Draft the note to the process owner

Draft: “Two questions left before Friday: is the customer change-log review weekly or monthly, and who owns the quarterly access review? Each takes a minute; the clip is attached.” The owner has confirmed 11 rows and corrected 1. Send it from Owner confirmation.

The screens

The RCM builder, gap analysis and owner confirmation screens

From the working solution, on its sample data. Pick one to see it large.

TodayFour plain numbers and the agents' thread, beside a box to ask the agents. The thread shows what they finished and what needs a person, each with its next step.
Walkthrough to RCMThe process flow across the top, the transcript on the left and the matrix on the right, grouped by risk. A source chip jumps the recording to its moment.
The challenger disagreesA control description the challenger agent calls untestable, its proposed wording, the matrix agent's reasoning and the row's history.
Cited narrativeSeven sections with a citation on each paragraph. Conflicts between what was said and what is written are marked, and a rewrite shows as a tracked edit.
Swimlane flowchartNine steps in six lanes with risk, control and gap markers. Each step shows its risk, its controls and the narrative passage behind it.
Assertion coverageFour significant accounts by six assertions, with the controls behind each cell, and the one relevant assertion with no control.
Gap analysisWhat people said, what the procedure says and what the system enforces, side by side. Below them, the root cause and the exposure sized from the ERP.
The gap decisionThe challenger's blind re-check, then the SOX program manager's decision with its reason code, the new control and the interim review.
Owner confirmationOne plain question per row, with the clip. The owner's answer becomes a cited edit, with the response time and reminders below.
Change watchA policy change turned into an edit on two controls, with its effect on testing, the watched sources and a connection that needs renewing.
Versions and approvalThe field-by-field comparison with the last approved version, the conditions for approval, and the attestation and signature.
Reports and auditor questionsAudit committee status, the auditor pack, the gap list and owner response times. An auditor's question is answered in a cited draft that waits for approval.
Your thresholdsConfidence and transcript quality floors, the owner response time, reminders, escalation, retention and performance materiality.
Governance

Each risk and control matrix row traced to a source, then signed by a person

No row without a sourceEach narrative sentence, flowchart step and matrix field cites its source. That is the second of the recording, the procedure paragraph or the configuration line it came from. A version cannot be approved until each row has at least one source.
Floors that stop the agentsNothing is drafted from a transcript below the 85% quality floor. The inventory walkthrough, at 71%, waits for a person. Rows under 0.85 confidence go to the process owner with the reason.
Agents argue, and a person settles itThe challenger agent tests each description and disputes the matrix agent in the open. Both lines of reasoning are shown, and only a person chooses the wording.
People confirm, decide and signThe process owner confirms each row. The SOX program manager decides each gap with one of four reason codes and approves a version with an attestation and a signature. Preparer and approver must differ.
Nothing applied or sent unseenAgents do not decide a gap, classify a deficiency, approve a version, apply a change or send anything to the external auditor. Business systems are read-only to them. Only an approved version is written to the GRC system of record.
Each step on the audit trailEach agent step is logged. So is each person's confirmation, edit, decision and settings change, with who, what, when and the reason. The log exports as an evidence pack. Recordings are kept 90 days, and transcripts stay with the version.
Configuration

Confidence floors, owner response times and the standard for control wording

The floors, response times and standards the agents work to are settings. A change needs a reason and goes on the audit trail.

SettingDefaultChoose from
Confidence floor0.85Rows below it go to the process owner
Transcript quality floor85%Below it, nothing is drafted
Owner service level5 business daysReminder on day 3 by email and chat. Open rows go up to the SOX program manager on day 5
Recording retention90 daysTranscripts stay with the documentation
Performance materiality$18.0MSignificant account threshold for the year
Risk libraryGroup risk library v627 order-to-cash risks · 214 risks in all · owner Group Internal Audit
Control description standardWho · what · when · how much · evidence · precisionThe challenger agent tests each description against it
Key reportsCompleteness and accuracy procedure requiredA report used in a control needs a check that it is complete and accurate (AS 1105)
Connections

The recordings, procedures, ERP settings and GRC system the drafts are built from

Walkthrough recordingsthe recordings the facilitator shares, read-only, with the consent notice
Document librarySOPs, policies and methodology memos, with their versions
ERPfinance, order management, workflow configuration and roles, read-only
Change ticketsERP change requests that create or change a control
Identity directorycontrol owners, people who move teams and people who leave
GRC system of recordthe prior approved RCMs come in, and approved versions are written back only after approval
What it changes

Risks covered, effort saved and drafts ready on the day of the walkthrough

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of framework risks mapped to a control or flagged before the auditor's walkthrough
11 of 11
sample O2C risks covered or flagged
estimated
≈ $240K
of first-draft effort avoided on a 38-process refresh
By hand$342K
With agents≈ $102K
target
Sameday
narrative, flow and matrix drafted from the walkthrough
Todayweeks
With agents11 min

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our own estimate. We assume 60 hours of first-draft effort per process, to be measured in the live solution. The ≈ $240K is 38 processes × 60 h × $150/h, with 70% saved as in the hours split above. The $150/h is a blended internal and co-source rate. All of these inputs are assumed. “Typical” means a published figure. The average program of 15,581 hours and the rise in in-scope systems from 17 to 40 come from KPMG, The 2025 SOX Survey. The 238 adverse reports in FY2025 filings come from KPMG, Trends in material weaknesses. PCAOB AS 2201 and AS 1105 are named as context. Names on the screens are sample data.

Questions

SOX documentation questions on risks, controls and walkthroughs

What is Risk and Control Matrix (RCM) Documentation?

Risk and Control Matrix (RCM) Documentation is software that drafts SOX documentation. From a walkthrough recording, your procedures and the system configuration, it drafts the process narrative, the flowchart and the risk and control matrix. Each field of each row cites the moment or paragraph it came from. A challenger agent tests each control description, and a gap agent flags any risk with no control. The process owner confirms each row. The SOX program manager decides each gap and signs the version.

How does it turn a SOX walkthrough into process narratives and flowcharts?

The capture agent transcribes the recording with speakers and timestamps and scores its quality. The narrative agent writes the narrative in your house template. The flow agent draws the swimlane flowchart from it, and the matrix agent pulls out the risks and controls. In the working solution, a 45-minute order-to-cash walkthrough became a 6-page narrative, a 9-step flowchart and 14 controls. It took 11 minutes 20 seconds.

How does it find a risk with no control before the external auditor does?

The gap agent compares the matrix with your risk library and the assertions of each significant account. For each risk, it sets what people said in the walkthrough against the written procedure and what the system enforces. It sizes the exposure from the ERP, read-only. Each gap waits for the SOX program manager to decide it with a reason code.

Can our external auditor trace a control back to its source?

Yes. Each owner, frequency, threshold and assertion carries a source chip. It opens the transcript at that second, or the procedure paragraph or configuration line, highlighted. The external auditor has read-only access to approved versions. Answers to their questions are drafted with citations and sent only after a person approves them.

Does the RCM stay current when SOPs, policies, systems or owners change?

The watcher agent reads new procedure and policy versions, ERP change tickets, system settings and staff moves. It proposes the exact edit with its effect on testing. It does not apply a change or retire a control. The SOX program manager accepts, rejects or dismisses each one with a reason.

Can we start SOX documentation for a business we just acquired?

Yes. In the working solution, a recently acquired business with its first SOX year still ahead starts from the Processes screen. The agents find the acquired company's procedures and ERP role export, propose walkthrough dates and prepare the questions.

Who confirms the rows and approves a version?

People do. The process owner confirms each row in plain words. The SOX program manager decides gaps with reason codes and approves with an attestation. Preparer and approver must be different people. Agents do not confirm a row, decide a gap, classify a deficiency, approve a version, apply a change or send anything to the auditor. Each step is on the audit trail.

What do you need from us to set it up?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These include your risk library, RCM template, control description standard and a sample walkthrough. It goes live once each quality gate has passed. We will walk you through it on one of your own processes first.

Draft a risk and control matrix
from one of your walkthroughs.

We'll run Risk and Control Matrix (RCM) Documentation on one of your own walkthrough recordings, with its procedures and your prior RCM.