Answer the district's disputes, decide each point and propose credits
- Disputed car-days beside the switch record
- Customer points pinned to ledger lines
- Options priced with their precedent
Rail demurrage bills laid out car by car beside the railroad's own switch record, so each disputed car-day is answered from the record and inside the dispute window.
See one demurrage dispute answered car by car ↓A customer disputes car-days on its monthly demurrage invoice and names the cause: a switch the railroad missed, cars bunched against a short unloading track, a late pull, a notice it never received. Answering means the car's event history, the switch lists for the days in question, the crew call record, the tariff item, the yard record and the customer's emails, assembled by hand.
Operations is asked by phone whether the job ran and why not. The credit gets decided case by case, often the whole bunch or none of it, and the reply returns as a summary with no line-by-line support. Next month the same argument returns, and sometimes the dispute window has already run out.
Built forDemurrage analystsRevenue accounting directorsCustomer service managersTrainmasters
Shippers dispute demurrage they say the railroad caused, and each answer is assembled from four systems by hand.
Pulled together for each dispute
Built-in controls
The railroad answers each disputed car-day from its own switch record, before the window closes.
The demurrage analyst, the trainmaster, customer service and the director of revenue accounting use them to answer one plastics plant's dispute over a month of cars.
demoSample data: the railroads, the plant, its car numbers, the people and each charge.
Revenue accounting decides the money, operations names the cause, and customer service speaks to the shipper.
Answer the district's disputes, decide each point and propose credits
Co-sign large credits and approve rules, tariff versions and settings
Own the customer relationship, read its free text and send the answer
Confirm why a switch was missed or late, deciding no money
The person who proposes never co-signs, and reopening clears the proposal and the co-signature.
Around the one dispute: the letter, the other open cases, the invoices and the rules.
demoSample data, from the working solution.
What the review found in one month's bill for one plant.
Seven cars were at the serving yard before that job's on-duty time. The missed-switch item, Item 310, leaves them owing nothing: 19 car-days, $2,850.00, credited.
The draft grouped cars by the switch that placed them, so one car due on the canceled job fell in with the later group. Regrouped, the credit rose from 18 to 19 car-days.
The other seven cars reached the yard after the canceled job and were placed when due. The plant's own log shows each empty 16 to 27 hours before release.
The challenger argued newest-first placement and the private-car exemption; the switch list and the tariff's private-car item answer both.
demoSample data, from the working solution.
Rail demurrage is the charge a railroad bills for each day a car stays at a customer's facility past its free time, both to pay for the car and to discourage holding it. Here each disputed car-day of rail demurrage is answered from the railroad's own switch record and tariff.
It lays the bill out car by car, pins the customer's points to the lines they contest, and sets the switch record beside them. Cars on hand before a canceled switch are credited under the tariff's missed-switch item, and the analyst decides the rest.
Each invoice carries the car-level dates and times the federal rule asks of Class I railroads, and each billing run is checked for them. A regional or short line can adopt that standard as its own. It gives no legal view.
The demurrage analyst proposes it after opening the tariff item, and the director of revenue accounting co-signs credits over the threshold after opening the credited lines. The customer service manager then sends the answer.
Yes, through a customer portal, in fixed fields such as track capacity and unload times. The connecting railroad answers interchange times the same way, and free text reaches the customer service manager instead.
The disputed amount goes on hold automatically when the dispute arrives. After the answer the credit memo is issued, and releasing the rest as due takes a request and a second person's approval.
Every criterion answered and every benefit traced, before the panel reads it.
1-min demoRailroad Hazmat ComplianceResponders see what is really in each car; held trains move on two signatures.
1-min demoRail Freight Claims ManagementClaims decided on the 120-day clock, the damage placed on the right line.
1-min demoWe will lay one of your own invoices out car by car beside the switch record.