Run each application, steer the agents, send outside requests and finalize as preparer
- The draft scored on FRA's scales before the panel
- Shipper commitments arriving as fields and signed files
- Debrief lessons kept as standing checks
A CRISI grant application read through FRA's scoresheet before the panel sees it, each benefit traced to its source, then signed by the engineer, the CFO and the president.
See a CRISI grant application read, challenged and signed ↓A short line competes for the same federal money as states and large partners, usually with a grants manager who does this beside other work. The application is built from an engineer's estimate, a consultant's benefit-cost workbook, a stack of letters and a narrative written last.
Nobody reads it against FRA's evaluation scales until the review panel does. A benefit counted twice can discount the whole analysis, diversion with no signed commitment gets little weight, and a readiness section that names no class of action reads as risk. A weak application costs the round.
Built forGrants managersShort line presidentsChief engineersChief financial officers
Grant applications are stitched together by hand, and no one scores them before FRA's reviewers do.
Assembled from four places
Built-in controls
The railroad submits an application whose figures hold up under a reviewer's read, with days to spare.
The grants manager, the chief engineer, the CFO and the president use them on one application to rebuild a line for 286,000-lb cars.
demoSample data throughout: the railroad, its shippers, its staff and every figure.
The grants manager prepares, the engineer and the CFO sign their parts, and the president certifies.
Run each application, steer the agents, send outside requests and finalize as preparer
Certify the cover form and submit through Grants.gov as authorized representative
Confirm scope, the estimate, the class of action and the Buy America plan
Sign the non-federal match, decide the federal share and approve method settings
Four weaknesses a panel would have scored down, found in the railroad's own draft before anyone signed.
Draft v3 counted $552,323.20 a year for the same 2,080 diverted truck trips the shippers' savings already priced. Striking it moved the ratio from 1.94 to 1.70.
Bid prices explain the unit prices but not the $802,400.00 contingency, so the point went to the chief engineer instead of being closed by an agent.
Diversion rested on a shipper survey nobody signed. Two letters then committed 300 and 220 carloads a year for 10 years, and the benefits follow those terms.
The narrative said the materials would meet Buy America but named no source for the span steel or the tie plates, until the consulting engineer's table came back.
demoSample data, from the working solution.
All eight cite their sources; any judgment call lands with the grants manager, the engineer, the CFO or the president.
Turns the notice, each amendment and FRA's rubric into scoresheet rows and a working-day clock.
Maps each paragraph to its rows and drafts answers with citations.
Works the sheet line by line, traces each benefit and corrects its own errors.
Plays FRA's technical review panel against the draft and raises points.
Reads the estimate, drawings and rail survey, and builds scope variants.
Writes field-by-field requests for shippers, the state and the engineer, then reads the answers.
Checks the attachments, forms and letters against the notice.
Drafts quarterly reports from invoices, inspection reports and car records after an award.
More of the same application, from the read in progress to the grant the group already holds.
demoSample data, from the working solution.
A CRISI grant application asks FRA for money from its rail infrastructure and safety program: a narrative, a statement of work, a cost estimate, a benefit-cost analysis, environmental and Buy America documents, support letters, match commitments and federal forms, submitted through Grants.gov. Here agents assemble and check it, and the railroad's people sign and submit.
Yes. The statute names Class II and Class III railroads as eligible applicants and lists projects that improve short-line or regional railroad infrastructure. The eligibility rows cite those provisions; the call stays with the railroad.
No. It shows the railroad's own read on FRA's published scales, never a combined rating, and declines questions about award odds.
Straight to the grants manager, word for word, and never into the application. Finalizing waits until the manager reads it, a shipper who asked for a call is counted only after the call is logged, and the president sees the note before signing.
It reads each CRISI notice and its amendments, and lists every application the group has open across federal and state programs, with its working days left.
The president, as the authorized representative, after the chief engineer and the CFO sign their parts and the grants manager finalizes. The agents prepare and check; they never certify or submit.
Responders see what is really in each car; held trains move on two signatures.
1-min demoRail Freight Claims ManagementClaims decided on the 120-day clock, the damage placed on the right line.
1-min demoTrack Inspection ComplianceEvery inspection gap and lifted slow order found by milepost, before FRA finds it.
1-min demoBring a past application and its debrief notes, and we will read it against the scoresheet with you.