WorkflowQuestionnaire & RFP Response

Tender Management

Tender management software that keeps every bid from being set aside on a formality

See one case, screen by screen ↓
Watch with transcript →

Built forBid managersBid writersCertificate ownersFinance managersContracts managers

The Problem Today

Bid teams read each tender’s hundreds of pages by hand, so one lapsed certificate can get the whole bid rejected.

36 h
of compliance work on one mid-size tender, by hand our estimate

Checked by eye on the last day

  • Forms
  • Page limits
  • Prices
  • Validity
  • Same forms, retypedThe EU qualification form and declarations, retyped each time
  • Clarifications missedA clarification note cuts a page limit mid-draft

The Solution

  1. Notices found and readFour portals watched, and each tender read into cited requirements
  2. Each certificate datedChecked valid on the deadline, at award and at contract start
  3. The buyer’s check, rehearsedPresence, format, signatures and page limits, rule by rule
  4. Fixed, signed and uploadedThe bid manager approves each fix, and the signatory signs and uploads

Built-in controls

  • Exclusion grounds confirmed, never assumed
  • Agents never sign or submit
  • A sealed audit trail and evidence pack

What You Get

More bids reach the evaluation on quality and price, where the work that went into them can win.

4.5 h
of compliance work on the same tender, with the solution our estimate
  • Cut to fit, no point lostPage cuts that keep each scored point answered
  • Prices carried throughEach line priced, and the same total on the form
  • Fitting notices proposedEach comes with reasons for and against, and skipped ones keep their reason
In short

What is Tender Management?

Tender management software takes a public-sector bid from the published notice to the portal’s receipt. The software finds tenders, reads the documents and fills the forms. It collects certificates and checks that everything is present, valid and in format before upload. Tender Management adds eight agents. They watch TED, Find a Tender, SAM.gov and TenderNed, build the packing list per envelope and fill the ESPD from the company file. They also rehearse the buyer’s compliance check. The bid manager approves, and the authorized signatory signs and uploads.

How to choose AI solutions for back-office and enterprise work →

Updated

The problem

A good public bid can be thrown out over paperwork before anyone scores it

When a public body buys works or services, it publishes a tender. Companies answer with a bid, and the buyer scores each bid on quality and price. But first the buyer runs a compliance check. Each document must be present, valid, in the right format and within its limits. A bid that fails this check is set aside before quality or price is scored. Small slips are enough. An ISO certificate runs out two days before the deadline. A Chamber of Commerce extract is older than six months. A plan of approach is one page over a limit that a clarification note changed. A clarification note is the buyer’s written answers to bidders’ questions. A price line is left blank. A SAM.gov registration, needed for US federal bids, lapses before the offer. Any one of these can cost a contract that runs for years.

The checks that prevent this are still done by hand. Someone reads 300 to 600 pages of instructions, specification, contract conditions and annexes into a spreadsheet. The ESPD, the standard EU form where a bidder declares it qualifies, is retyped for each tender. Certificates are collected from shared folders and email, and nobody checks each one against the deadline, the award date and the contract start. On the last day, a review team checks presence and format by eye. Clarification notes can change the rules, yet they are read once, against whatever was already drafted.

typical3,000+noticespublished on TED every working day
typicalEUR 815billionworth of contracts published on TED each year
Where a tender's compliance hours goestimated
By hand36 hours
With the solution4.5 hours
  • Finding and qualifying notices on four portals4 → 0.5 h
  • Reading the tender and clarification notes into a requirements list12 → 1 h
  • Filling the ESPD and forms from the company file6 → 1 h
  • Collecting certificates and checking their validity5 → 0.5 h
  • Checking price lines and totals in the Form of Tender3 → 0.5 h
  • Last-day check of presence, format, names and signatures6 → 1 h

Estimated split of the compliance work on one mid-size public tender, by hand and with the solution. Writing the technical offer itself is not included.

How it works

Tender management from the published notice to the portal’s receipt

What comes in
Tender inevery page · notice, pack, clarifications, company file
Agents at work
Portal watcherTED, Find a Tender, SAM.gov
Tender readerevery requirement, with its page
Then
Packing list builderper envelope
Form fillerESPD from the company file
Then
Certificate keeperdeadline, award, start
Price checkerlines and totals
Then
Submission checkerrehearses the buyer's check
A person decides
Bid Manageraccepts each fix and approves, then the signatory uploads
What comes out
Packing list, every document valid
Signed submission
Portal receipt and evidence pack
One case, step by step

A framework lot three days from its deadline, checked and uploaded early

The company is bidding for Lot 2 of a port authority’s framework for quay wall and fender maintenance. It is worth EUR 18.6 million over four years, under an open procedure, submitted through TenderNed. The deadline is noon on Thursday. In the year before, 3 of the company's 41 bids were set aside on a formality. The causes were an expired ISO 9001, an unsigned Form of Tender and a DOCX file where a PDF was required. It is Monday morning, three days out. Here is how the bid manager works with the agents, screen by screen in the working solution. It shows what the bid manager asks, what they approve and the evidence they see.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Monday, 08:10

    Three things need the bid manager, and the agents say why

    Bid manager

    Since Friday the agents read 5,453 notices on four portals and finished the checks on two bids. The briefing shows 3 bids due in 14 days and 3 decisions waiting. Lot 2 has 21 of 23 documents ready, under a countdown to the deadline. The submission checker’s note from 22:15 last night leads the thread, with the passages it cites. Below it, the bid manager can ask about any bid, document or deadline.

    Submission checker: “I rehearsed the port authority’s compliance check on Lot 2: two documents would fail it.”

  2. 02Four weeks earlier

    The notice is proposed, with its reasons

    Portal watcher

    The portal watcher reads TED, Find a Tender, SAM.gov and TenderNed every 30 minutes against the search profile. At 06:12 it proposed the TED notice for Lot 2, with a fit of 88%. The bid manager started the bid at 08:40, with the reason “core service line”. Each proposal shows its value, deadline, code and what speaks for and against it. Each notice filtered out keeps its reason.

    “It proposes; you decide.” The watcher does not register interest or download behind a login before a person starts the bid.

  3. 03Read and re-read

    508 pages, 132 requirements, each with its page

    Tender reader

    The tender reader read 15 documents. They include the notice, instructions to tenderers, the 128-page Lot 2 specification, contract conditions, price schedule and drawings. The first clarification note (Nota van Inlichtingen) is there too. Of the requirements, 129 were read at 90% confidence or more. The 3 below that went to the bid writer to confirm. The clarification note has 41 answers, and three change the work. Each is shown before and after. Answer 17 cuts the Q1 plan of approach from 10 to 8 pages. Answer 9 caps liability at EUR 2,500,000 per event. Answer 22 sets the fender test frequency.

    Tender reader: “I never guess a requirement.”

  4. 04Last night, 22:15

    A rehearsal of the buyer's own compliance check

    Submission checker

    The submission checker runs the tender’s own rules over the whole packing list. That is 184 checks across 11 rules. They cover presence, PDF and size, file names, qualified e-signatures and page limits. They also cover validity on the deadline and at award, and the same facts in each document. Of the checks, 181 pass and three would fail. The plan of approach is 9 pages against 8. The ISO 9001 certificate runs out two days before the deadline. ESPD Part IV.D cites that same certificate.

    “I had no part in drafting any document, I cannot approve, and I cannot submit.”

  5. 05The bid manager asks

    “What could still get Lot 2 excluded?”

    Bid manager

    The packing list holds 23 documents in three envelopes. The envelopes are the separate parts of the bid: qualification, technical offer and price. Each document shows its file, source, owner and a bar for whether it is valid when it counts. The bid manager asks the agents beside it. The answer names two things and nothing else, with the passages cited. One click filters the list to what needs the bid manager.

    Submission checker: “Two things, and nothing else: ISO 9001:2015 certificate and Q1 Plan of approach (30%). The other 21 documents pass all their checks.”

  6. 06The ISO item

    The certificate runs out two days before the deadline

    Certificate keeper

    Section 5.1.1 of the instructions asks for a valid ISO 9001 certificate on the deadline for receipt of tenders. The certificate on file runs out two days before it. The certificate keeper found the renewed certificate, issued after the recertification audit, and asked its owner. Each certificate is checked against three dates. These are the deadline, the planned award and the contract start.

    QHSE manager: “That is the final certificate, issued after the audit. Please use it everywhere.”

  7. 07Accepted

    The swap accepted with a reason code

    Bid manager

    The bid manager picks the reason code “Accept: renewed or corrected document, owner confirmed”. They tick that they read the cited passages and the document. The form filler updates ESPD Part IV.D to the renewed certificate. Then the submission checker re-checks the certificate and the ESPD before the item turns ready.

    “Signed by the bid manager · recorded in the audit trail.”

  8. 08The plan of approach

    Nine pages against eight, cut without losing a point

    Bid drafter

    Since answer 17, appendices count toward the limit, and Q1 is limited to 8 pages A4. The draft runs to 9. The bid drafter proposes merging two tables and removing a duplicate site photo on page 6. Each scored point of Q1 is still answered, and the font stays 10 pt. The submission checker counts 8 pages, and the bid manager accepts the trimmed version.

    The bid drafter does not add a claim without a source, and a person accepts each edit.

  9. 09Step 3 of 4

    The submission approved, one item noted for award

    Bid manager

    The rehearsal now passes 184 of 184 checks. All sign-offs are in. The finance manager signed the price. The contracts manager confirmed the bid has no reservations, or conditions on the offer, and signed off the exclusion grounds. The QHSE manager signed the renewed certificate. Next, the bid manager approves 22 files at EUR 18,412,640 excluding VAT, with a reason code. A note records that proof of the insurance renewal is due before award.

    Approval stays closed while any item is open, and says what is missing.

  10. 10Received, three days early

    Signed and uploaded, with the receipt read back

    Authorized signatory

    The managing director is the authorized signatory. They sign with a qualified e-signature and upload the 22 files in three envelopes through TenderNed. The tax compliance statement is held for award, as the tender allows. The portal’s receipt is read back and checked against the file list, 3 days 3 hours before the deadline. Each step, by the agents and by each person, is a sealed entry on the audit trail.

    “Each entry is sealed; changing one breaks every seal after it.”

Who it’s for

Bid managers, writers, certificate owners, finance and contracts

The same lot from five seats. Each shows tender week as it was, and as it runs now.

Bid manager
Approves each submission
Before
Runs five to eight live bids and finds out on the last day, by eye, what could get one set aside.
Now
Asks the agents what could get a bid excluded and sees the page that says so. Decides each fix with a reason code.
Bid writer
Writes the technical offer within the limits
Before
Builds the compliance matrix by hand from hundreds of pages. Re-reads everything when a clarification note lands.
Now
Confirms only the requirements read below 90% confidence. Sees the hour a page limit changed and what it affects.
QHSE manager
Owns the ISO, VCA and CO2 certificates
Before
Has the renewed certificate in hand, but nobody asks for it before the bid goes out.
Now
Is asked to confirm a renewal the day it matters. Sees each certificate against each open bid’s deadline, award and start.
Finance manager
Owns and signs the price
Before
Needs the number in the form and the number in the price sheet to be the same number.
Now
Signs a price the price checker has shown is complete and carried through. Each line is priced, and the total in the Form of Tender matches.
Contracts manager
Reservations, deviations and exclusion grounds
Before
Allows no reservation without first reading the clause.
Now
Confirms the ESPD’s exclusion-ground answers with the evidence in view. Decides reservations with the clarification answer beside the clause.
The agents

Eight tender management agents, from portal watch to the final check

From the notice to the upload, the agents read the tender, build the packing list, fill the forms and check each document. The bid manager approves and the signatory uploads.

Portal watcher

Reads TED, Find a Tender, SAM.gov and TenderNed every 30 minutes against the search profile. Proposes notices that fit, with the reasons. Keeps each notice it filtered out, with why.

  • Never registers interest or downloads behind a login before a person starts the bid
  • Never drops a notice without a recorded reason
Tender reader

Reads the whole tender and each clarification note. Extracts requirements, envelopes, format rules and dates, each with its page. Drafts clarification questions, and re-plans the packing list when a note changes something.

  • Below 90% confidence a person confirms
  • Never sends a clarification question itself
Packing list builder

Turns the requirements into the documents each envelope needs. Sets owners and due dates, counted back from the internal freeze. Reminds owners after one business day.

  • Never removes a required document
  • Changes to the list need the bid manager
Form filler

Fills the ESPD, the Form of Tender and the declarations from the company file, and keeps each reference current when a document changes.

  • Never signs
  • Never answers an exclusion ground without evidence. The contracts manager confirms
Certificate keeper

Checks each certificate, extract and registration against each bid’s deadline, award and contract start. Finds renewals and asks owners to confirm.

  • Never edits a certificate
  • An owner confirms every renewal
Bid drafter

Proposes edits to technical documents to meet page, font and format limits, without removing a scored point. Drafts from the bid library, with sources.

  • Never adds a claim without a source
  • A person accepts every edit
Price checker

Checks that each line is priced and the arithmetic is right. Checks totals carried to the Form of Tender, currency and VAT. Runs the abnormally-low test, which buyers use to flag a price that looks too low.

  • Never changes a price
  • Finance signs the price
Submission checker

Rehearses the buyer's compliance check over the whole packing list. It checks presence, format, names, signatures, page limits, validity and the same facts everywhere. Passes each item or sends it back with the rule.

  • Had no part in drafting
  • Cannot approve
  • Cannot submit
Bid Manager and signatory

Approve, sign and upload.

Ask in plain words

Questions about exclusion risk, validity dates and who must act

On each bid and document, ask why, what the rule says or what happens if. Or give an instruction. Answers cite the passage, and nothing is sent until a person says so. These answers use the sample data.

What could still get Lot 2 excluded?

Two things, and nothing else. They are the ISO 9001:2015 certificate and the Q1 plan of approach. The ISO 9001 on file runs out two days before the deadline, and the renewed certificate is ready. Since answer 17, the plan of approach is 9 pages against a limit of 8. The other 21 documents pass all their checks.

Is the insurance valid at award?

It is valid on the deadline, which is what section 5.6.1 asks. The policy ends after the planned award but before the contract starts. So section 5.6.2 needs proof before award that the cover continues. I set a task for the contracts manager ahead of the award.

Ask the QHSE manager to upload the renewed certificate everywhere

It is already in the certificate store. Four bids use ISO 9001. Two already cite the renewed certificate, and one waits for your acceptance. The UK bid cites it in its questionnaire. I will tell the QHSE manager which bids use it, and propose nothing else.

Is the US offer still eligible when it is due?

Only if the SAM.gov registration is renewed. It must be active when the offer is submitted and at award. Ours ends ten days before the offer is due. The registration owner started the renewal at 07:20. I check its status each morning. If it is not active a week before the offer, I will tell you.

The screens

The packing list, the rehearsed buyer’s check and the filled ESPD

From the working solution, on its sample data. Pick one to see it large.

TodayThe bid manager’s morning, with bids due, decisions waiting and the next deadline counting down. It shows what the agents did overnight, with a box to ask them.
The packing listEach document per envelope with its file, source, owner and validity when it counts. The agents’ conversation sits beside it.
Portal watchNotices from TED, Find a Tender, SAM.gov and TenderNed that fit the search profile. Each shows its fit and reasons, and a late feed is flagged.
Tender readingRequirements with their pages, and a clarification note compared answer by answer. It shows what changed, before and after, and what it affects.
The rehearsalThe buyer's compliance check, run in advance. It has 11 rules and 184 checks, and each failure names the rule it breaks.
One document, all its proofWhat the tender asks, and the certificate on file against the renewed one. It shows the owner's confirmation and validity on the deadline, at award and at start.
Accept with a reason codeThe bid manager accepts the renewed certificate with a reason code, a note and a read-confirm, recorded on the audit trail.
A page limit metThe draft page by page against the new limit, the proposed cut, and the submission checker's checks on the trimmed version.
The ESPD, filled and citedEach ESPD answer filled from the company file with its source. It also shows the questions only a person could answer, and the export as XML or PDF.
Price checksAll 142 lines priced and the arithmetic re-checked. The total is carried to the Form of Tender and the abnormally-low test is run. Finance signs it.
Approve the submissionStep 3 of 4. The bid manager approves what will be uploaded, with a reason code and a note for the award-time item.
Certificates and registrationsThe company file, with each certificate and registration against the next deadline, the bids it affects and its owner.
The audit trailEach action by a person or an agent, with its evidence and seal, from the notice to the portal’s receipt. The evidence pack can be exported.
Governance

Tender management with an independent checker and a sealed trail

Each requirement and answer cites its pageEach requirement, ESPD answer and validity date links to the passage it came from. That may be the instructions to tenderers, the clarification answer or the certificate. So each decision is made with the source in view.
An independent checkerThe submission checker rehearses the buyer’s own rules and had no part in drafting. It cannot approve and cannot submit. Drafting agents do not check their own work.
A person decides each fix, with a reason codeThe right agent proposes the fix and the owner confirms. The bid manager accepts, edits or sends it back with a reason code and a note. No one accepts or approves what they drafted.
Exclusion grounds are confirmed with evidenceExclusion grounds are the legal reasons a buyer can refuse a bidder. The form filler does not answer one without evidence. The contracts manager confirms ESPD Part III and decides each reservation or deviation.
Only the signatory signs and submitsThe bid manager approves the submission. Only the authorized signatory signs with a qualified e-signature and uploads. The portal’s receipt is read back against the file list.
A sealed audit trail and an evidence packEach action by a person or an agent is recorded in order with its evidence. Each entry is sealed and kept for 10 years. One evidence pack per bid holds what was asked and decided, by whom, and the receipt.
Configuration

Validity rules for certificates, extracts, registrations and page limits

The validity rules and thresholds each bid is checked against are settings. A change needs a second approver, and the agents replay each open bid against the new rule before it is accepted.

SettingDefaultChoose from
Trade register extractNot older than 6 months on the deadlineUnless the tender says otherwise
Tax compliance statementNot older than 6 months at awardHeld for award, winner only
InsuranceValid on the deadline, with renewal proof before awardTask to the Contracts Manager 2 weeks before award
ISO, VCA and CO2 certificatesValid on the deadline and at awardWarn 60 days ahead
SAM.gov registrationActive at offer and at awardFAR 52.204-7, renew 60 days ahead
Core supplier information (UK)Confirmed before each submissionProcurement Act 2023
Page limitsNo toleranceAppendices count unless the tender says otherwise
Requirement confidenceBelow 90% a person confirmsNever guessed
Connections

TED, Find a Tender, SAM.gov, TenderNed and the company file

TED and Find a TenderEU notices in eForms and tender documents. UK notices and the Central Digital Platform
SAM.gov and TenderNedUS opportunities and entity registration. Dutch notices, documents and clarification notes
Certificate storeQHSE certificates, insurance, trade register extracts and tax statements
Document librarythe bid library: plans of approach, CVs, method statements and references
Finance system and CRMstatutory accounts, cost estimates, opportunities and bid decisions
E-signature servicequalified e-signatures by the authorized signatory
What it changes

Tender management results in compliance hours and bids kept in the running

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
bids set aside on a formality, the design goal, with each document checked against the tender's own rules before upload
Sample, last year3 of 41 set aside
With the rehearsal0
target
100%
of certificates and registrations checked valid on the deadline, at award and at contract start
target
1hour
from a published notice to a packing list with owners, instead of two days of reading
1 of 16 working hours
two days of reading

On this page, “demo” means seen in the working solution, on its sample tender data. “Target” means the design goal, measured in the live solution. “Estimated” is our estimate of the compliance work on one mid-size public tender, by hand and with the solution. It does not count writing the technical offer. “Typical” means published figures from TED, European public procurement. TED publishes over 3,000 invitations to tender, contract awards and other notices every working day. Contracts worth about EUR 815 billion are published there each year. Regulation named as context includes Commission Implementing Regulation (EU) 2016/7 (ESPD) and Directive 2014/24/EU, articles 56(3), 57 and 59. It also includes FAR 52.204-7 (SAM registration at offer and award) and the Procurement Act 2023 (Find a Tender, in force 24 February 2025). Names on the screens are sample data.

Questions

Questions bid and contracts teams ask about tender management software

What is tender management software?

Tender management software takes a public-sector bid from the published notice to the portal’s receipt. The software finds tenders, reads the documents and fills the forms. It collects certificates and checks that everything is present, valid and in format before upload. Tender Management adds eight agents. They watch TED, Find a Tender, SAM.gov and TenderNed, build the packing list per envelope and fill the ESPD from the company file. They also rehearse the buyer’s compliance check. The bid manager approves, and the authorized signatory signs and uploads.

How does it stop a bid being excluded on a formality?

An independent submission checker runs the tender’s own rules over the whole packing list before upload. In the working solution that is 184 checks across 11 rules. They cover presence, format, file names, signatures, page limits, validity on the deadline and at award, and the same facts in each document. When a check fails, the right agent proposes the fix with the passage cited. A person accepts it.

Does it check certificates against the deadline and the award date?

Yes. The certificate keeper checks each certificate, extract and registration against three dates for each bid. These are the deadline, the planned award and the contract start, under the tender’s own rule. When one fails, it finds the renewed document and asks its owner to confirm. The form filler then updates each reference to it.

Can it fill in the ESPD?

Yes. The ESPD is the European Single Procurement Document, the standard form where a bidder declares it qualifies. The form filler fills in the ESPD, the Form of Tender and the declarations from the company file. Each answer is cited to its source, and the ESPD exports as XML or PDF. It does not sign, or answer an exclusion ground without evidence. The contracts manager confirms those answers.

What happens when a clarification note changes the requirements?

The tender reader compares each answer in the note with the requirements and the packing list. It shows each change before and after, re-plans the affected items and tells the owners. In the working solution, answer 17 cut the plan of approach from 10 to 8 pages, appendices included. The submission checker sent the 9-page draft back with that answer cited.

Which portals does it work with?

The portal watcher reads TED, Find a Tender, SAM.gov and TenderNed every 30 minutes against your search profile. It also watches each portal registration, such as the SAM.gov entity registration and the UK core supplier information, against each open bid.

Who signs and uploads the bid, and who approves it first?

Owners confirm their documents. The bid manager accepts each fix and approves the submission with a reason code. Only the authorized signatory signs with a qualified e-signature and uploads. The agents propose and check, and they do not sign or submit. Each step is a sealed entry on the audit trail.

What goes into setting it up for our bids?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These are your company file, bid library, search profile and a sample of past tenders. It goes live once each quality gate has passed. We will walk you through it on one of your own tenders first.

Run tender management software
on one of your past tenders.

We'll run Tender Management on one of your own past tenders, its clarification notes and your company file.