SystemPorts & Marine Terminals

Port Environmental Compliance

Port environmental compliance for terminals under California's at-berth rule: each ship visit rebuilt from the berth and shore power logs, and each missed hour explained before the report is due.

See one missed shore power window explained ↓
Watch with transcript →
The problem

A breaker trips at the berth, and the report needs four systems

When shore power fails, the terminal has two ways to keep the visit compliant: spend one of its few incident events for the year, or request the remediation fund by the hour with documents that prove the equipment failed and was maintained. Both need evidence, and the evidence is scattered: times in the berth log and the wharfinger record, connection and meter readings in the shore power log, the fault in a contractor's report that arrives days later as a PDF.

After the ship sails, the environmental team copies times from four systems into the state's reporting template and settles event or fund by email with the director. A partial hour gets counted short, or an event is spent on a fault that would have qualified for the fund. A fault report says utility outage when the breaker was the port's, and nobody sees the thirty-day clocks on a week's reports at once.

Built forEnvironmental compliance managersDirectors of environmental affairsTerminal operations managersEnvironmental analysts

The Problem Today

Each regulated ship at berth must be under emissions control soon after it is ready to work, and every miss needs proof the state accepts.

2 hours
after ready to work, by when emissions control must start published
5%
of last year's visits: the incident events a terminal is granted published

Copied by hand after sailing

  • Berth log
  • Meter reads
  • Work orders
  • CARB forms
  • Part hours counted shortThe state counts any part of an hour as a whole one
  • Incident events spent earlyThe yearly allowance runs out before the fault that needs it

The Solution

  1. Each visit rebuilt from port logsReady to work, connection and meter reads, each tied to its log line
  2. Contractor and ship answer in fieldsFault report and deck log come back as fields; notes go to a person
  3. Read first as an inspector wouldA challenger checks times, eligibility and the agents' own hour count
  4. Choose, then co-sign and fileThe manager picks event or fund; the director co-signs before filing

Built-in controls

  • The director co-signs anything sent to the state
  • A person reads outside free text before it counts
  • Preparers never co-sign their own report

What You Get

The port files each visit report on time, with the hours counted the way the regulator counts them.

  • The reporting clock in one viewEach report due in the next month on one tape
  • Event or fund, played forwardBoth options and the rest of the year under each
  • Earlier rulings at the decisionA learned rule takes effect once the director approves
Features

Port environmental compliance features, from the quay to the filed report

The environmental compliance manager, the director and terminal operations use them on one ro-ro vehicle carrier kept off shore power by the port's own breaker.

demoThe port, its terminals, the ships, the contractor, the people and each time and amount are sample data.

  1. 01Quay line

    At-berth status for each ship alongside, drawn along the quay

    • Each berth's ship and control status. The manager sees which ships are under control, which are exempt or tenant-reported, and which are past their window, without opening each log.
    • Incident events used against each terminal's allowance. The manager sees how many events are left before deciding how to cover the next miss.
    • Reporting tape for the next thirty days. Reports due, filed, waiting for co-signature or at risk, day by day, so the clocks are watched together.
  2. 02Visit trace

    Ready to work, connection and pilot on board traced to their log lines

    • Each time from its log line. Wharfinger record, berth log and shore power log are cited for each event an inspector would ask about.
    • The control window drawn on the timeline. Two hours after ready to work is marked, and the time outside it is shown in hours and minutes.
    • Single-source times flagged. A time resting on one record says so, so nobody files it as settled.
  3. 03Visit rebuild

    Shore power fault visit rebuilt by agents, with the berth's breaker history

    • Visit, power and rule agents in order. Each shows its step, what it read and which agent it hands to, with each source one click away.
    • Breaker history checked on request. Asking for the last month of breaker trips at the berth adds a step, logged in the manager's name.
    • No conclusion before the logs are read. The drafts stay empty until the agents have read the records behind them.
  4. 04Drafts

    Terminal visit report and remediation fund request drafted, each line cited

    • Report fields drafted in the rule's order. The visit report follows the regulation's field list, and fields that need the ship's sailing stay open.
    • Fund request from the hours outside the window. The request is priced from the hours past the window and carries the fault documents that make it eligible.
    • Requests out to the contractor and the ship. The fault report and the deck log are asked for in fields, each with its due time.
  5. 05Inspector's read

    CARB at-berth reporting read first as an inspector would read it

    • Partial hours counted as full hours. The agents' own draft is recounted the way the remediation rule counts hours, before anyone signs.
    • Eligibility checked against the maintenance record. A fund request needs equipment maintained to the maker's schedule, so the contractor's date is compared with the port's.
    • Consistency with earlier visits flagged. When an earlier visit used an incident event for the same breaker, the question goes to the manager.
  6. 06Contractor note

    Contractor fault report in fixed fields; its note held for the manager

    • Fault location, cause, repair and maintenance as fields. Only fields are compared with the port's records, so a contractor's paragraph cannot change the case.
    • Free text stops at the manager. The note is read in its exact words before the fund request can go to the director.
    • A recommendation becomes a work request. Reading the note leads to a proposed work request that operations schedules or declines with a reason.
  7. 07Event or fund

    Terminal incident event or remediation fund, played forward to year end

    • Both options priced over the rest of the year. Paid now, expected payments and events left, so the choice weighs this visit against the ones still to come.
    • Assumptions marked for the analyst to confirm. Visits left, the incident rate and the hours can be changed, and each is marked as an assumption, so a forecast never reads as a finding.
    • The rule's limits stated before choosing. A fund request found ineligible leaves the visit noncompliant, and the screen says so up front.
  8. 08Decision

    Remediation fund chosen with a reason, beside the last breaker fault ruling

    • The earlier ruling on a documented fault. The manager sees how the same choice was made before, and the rule the director approved from it.
    • Reason code and signature meaning. The manager signs the option after reading the trace and its sources; the director co-signs what is filed.
  9. 09Co-sign

    Director's co-signature on the fund request after opening each record

    • Each record opened by the co-signer. Only what the director opened counts toward the signature; anyone else's openings do not.
    • A changed report clears the openings. When the vessel's answer changes the report, the records are opened again before co-signing.
    • Filed only after the co-signature. The visit report and the fund request go to the state once the director has signed.

The port environmental team behind each at-berth visit report

The manager decides each visit, the director signs what goes out, operations owns the equipment, and analysts carry the volume.

Environmental compliance managers

Own each visit report and the stormwater program, and choose event or fund

  • Each visit time tied to its log line
  • Partial hours counted before filing
  • The last ruling at the next decision
Directors of environmental affairs

Co-sign filings and fund requests, approve rules and settings, report to the board

  • Records to open before co-signing
  • A year summary drafted for the board
  • Learned rules held for approval
Terminal operations managers

Run the berths and shore power vaults, and own the work orders

  • Breaker events and maintenance on one desk
  • Contractor advice turned into work requests
  • Times confirmed by operations
Environmental analysts

Draft about half the visit reports and chase missing vessel data

  • This week's reports due in one list
  • Bulk assignment and data requests
  • Late operators flagged on day seven
More screens

The filed report, the week's reports, stormwater and the shore power desk

The same team's other screens, from filing to the permit and the vaults.

Co-signed and filedThe director's co-signature and the filing, with counsel's note excluded as privileged; six more items are queued for the director.
Questions to outside partiesThe contractor's fault report and the ship's deck log came back in fields; another operator has not answered, with a second reminder one click away.
Visit reports due22 reports due this week: 14 filed, 4 waiting for the director, 3 drafting and 1 at risk, with internal targets for draft and co-sign.
Stormwater under the permitOne storm's lab results against the annual action levels, the facility average so far, and the upload clock that starts when results arrive.
Emissions inventory dataVessel activity by type for the inventory consultant, 14 visits missing auxiliary engine data, and a year summary drafted for the board.
Shore power deskBreakers, maintenance dates and work orders by berth, with the contractor's recommendation proposed as a work request to schedule or decline.

demoSample data, from the working solution.

Event or fund, and what goes to the state, stay with named people

The agents compute, draft and check; these calls are people's.

The compliance option is the manager'sAgents compute the window, the hours and both options; the environmental compliance manager chooses incident event or fund.
Nothing is filed without the directorThe director co-signs each visit report and fund request after opening the records, and only then is it filed.
No agent decides a fault's causeThe contractor's report states the cause; the power agent reads it and records it as written.
No visit is called a violationA visit left with no compliance option goes to the port's general counsel's office, and filings never characterize it.
Stormwater results are certified by a personThe stormwater agent tracks storms, results and clocks; a person certifies and uploads to the state system.

Six records each ship visit and storm event is read from

A time or a value on any screen opens the line it came from.

Wharfinger record and berth logArrival, all fast, gangway and netting down, clearance and departure
Shore power control system logCable connection, breaker events and meter readings
Maintenance management systemWork orders and preventive maintenance records by breaker
Contractor and vessel operator repliesFault reports and deck log times, field by field
The at-berth regulation and CARB's ratesRequirements, the report's field list, the incident event allowance and the hourly fund rate
Stormwater lab reportsSampling results against the industrial permit's action levels

What port environmental teams ask about port environmental compliance

What is port environmental compliance?

Port environmental compliance is the work of meeting a port's air and water rules: controlling ships' emissions at berth, reporting each visit, sampling stormwater under the industrial permit and supplying emissions inventory data. Here each regulated visit is rebuilt from the port's logs, and people choose, co-sign and file.

What does CARB at-berth reporting require from a terminal operator?

For each regulated visit the terminal reports the vessel, its times, the control used, meter readings and any exception, incident event or remediation fund request, within thirty calendar days of departure. The visit report here follows the regulation's field list.

When should a terminal use an incident event instead of the remediation fund?

That is the environmental compliance manager's call. The what-if shows both options for the rest of the allowance year and states the rule's limits: an ineligible fund request leaves the visit noncompliant, and an event must be reported with the visit.

How are partial hours counted for the remediation fund?

Each partial hour counts as a full hour, starting two hours after ready to work, as the regulation and CARB's guidance state. The challenger checks the agents' own arithmetic on this before anyone signs.

Does it cover shore power compliance across every berth?

Yes. The quay line shows each berth's ship and status, including capture systems, exempt types and tenant terminals that report their own visits, and the shore power desk tracks breakers, maintenance and work orders.

Does it handle stormwater and the emissions inventory?

Yes. It tracks storm events, lab results against the permit's action levels and upload clocks, and gathers vessel activity for the inventory consultant. A person certifies and uploads; the agents do neither.

Bring the visit that cost you
an incident event last year.

We will rebuild it from your own berth and shore power logs, line by line.