- Sees
- The board, families and rig windows
- Signs
- Proposes the campaign plan and moves wells between campaigns
86 wells, five families, and the plug and abandonment well that did not fit
Three of a field's oldest platforms have 86 wells with no further use. Planned one at a time they take 412.0 rig days. Grouped by shape, far fewer, if each family is what it looks like.
demoPlatforms, wells, rig, rates and people are sample data, as is each figure.
- 01Planning
Each well drawn as its plug plan, in families by shape and columns by campaign
Rig campaign plannerThe board shows 86 small well drawings in five families: one casing, liner, two reservoirs, annulus pressure, sidetracked. Two totals sit side by side: one by one, as the files stood, and as families on four campaigns, labeled an estimate. The planner can drag a well between campaigns on its platform; a move is only a proposal until the manager signs.
- 02Planning
Family 2 looks like 18 easy wells, until one lifts out on its own
Rig campaign plannerClicking the lone stick in Campaign 2 opens 9-144: a liner well with one reservoir, 11.4 rig days on its own with a milling package, and two checks that need a person. Every other liner well in the family has its cement proven by a bond log. This one does not.
- 03Engineering
A plug inside the liner counts only if the cement behind it is proven
Abandonment well engineerThe well page draws 9-144 large, with its plugs and their depths, each cited to the reviewed well file. Three methods are offered. The estimate carries the slowest until the engineer signs one, and the log-based family plan stays greyed out, because no log has been run.
- 04Engineering
145 bbl lost to the formation, and no bond log run
Abandonment well engineerThe cited page is the liner cement job report: 180 bbl of slurry pumped, severe losses, 145 bbl lost, plug bumped, and no bond log because the logging unit was not on the rig. That one line is why a family plan would have put an unproven barrier in the hole.
- 05Engineering
He signs section milling, with his reason, and it waits for the manager
Abandonment well engineerThe engineer picks milling 100 ft of liner across the cap rock for a rock-to-rock plug, and types why. Once signed, the method locks; changing it means withdrawing his signature, so the manager cannot countersign a method he did not choose.
- 06Engineering
Countersigned: the method now stands with two names on it
Abandonment managerThe abandonment manager reads the engineer's reason and the cement record, then countersigns. The well also sits in the ten-well sample she must open before the campaign plan can be signed, and the screen now shows she has opened it.
- 07Consent
A consent request drafted from the plan, with a citation behind each value
Abandonment well engineerFor 9-121, a Family 2 well in Campaign 1, the request lays out the well today, the plugs proposed, tests, casing removal and the rule checks, each value numbered to its page. The engineer ticks that he has read it, then signs. A second person countersigns before anyone submits.
- 08Consent
Countersigned, and the next step is the liaison's, on the company's clock
Abandonment managerThe manager opens the request, then countersigns it. Submitting it is the regulatory liaison's job, by the company's own clock of 90 days before the campaign starts. Agents drafted the document, with every value cited; they do not sign it or submit it.
- 09Planning
412.0 rig days one by one; 345.2 as families, an estimate
Abandonment managerThe estimate sets the two views side by side, by campaign and by family, with the rig schedule beneath. 66.8 rig days fewer and $23.0M less at 100%, from the sample durations and rates. It is labeled an estimate, not a quote, and it does not change the liability book.