- Before
- Once the audit notice lands, chases evidence across eight sites and a dozen systems. Finds out a record is missing the week the auditor samples it.
- Now
- Opens a binder checked each night and sees each gap by phrase, asset and date. Sends the drafted request to its owner.
A missing patch record in the NERC CIP audit evidence, found and closed
A utility is 13 days from sending its RSAWs and evidence to the regional entity, the body that audits it. The on-site week follows. The three-year audit period covers 8 sites and 240 Cyber Assets. Here is that morning, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0113 days out, morning
The binder opens on the tab that needs attention
NERC CIP compliance managerThirty-nine divider tabs run down the left, grouped by standard from CIP-002-5.1a to CIP-013-2. Of these, 29 are complete, 7 partial and 3 missing. Readiness is 89%, with 94 of 106 checks met. CIP-007-6 R2, Security patch management, is open and stamped Partial, with 7 of 8 checks met. The requirement is printed in its own words, with each testable phrase underlined and numbered. One phrase is underlined in red and stamped “no record found”.
Part 2.3 · “within 35 calendar days of the evaluation completion”: no record found
- 02Overnight, 02:14
Eight phrases, eight checks, each with its record
Requirement reader and evidence checkerThe requirement reader read R2 as eight checks, one per phrase. The evidence collector filed 212 items from the document library, patch tracker and change tickets. Each one got a hash, a fingerprint that shows it has not changed. The checker's table shows what the auditor will test. All 240 Cyber Assets are covered by 23 patch sources. There were 34 evaluation cycles, and the longest interval was 34 days. In all, 409 patches were applied within 35 days, and there are two dated mitigation plans.
411 of 412 applicable patches have an action within 35 days.
- 03The evidence
What the checker read, on the record itself
Evidence checkerThis is the patch tracker's evaluation record for the August cycle. It shows 61 patches released, 14 applicable and all 23 sources evaluated, signed by the SME (subject-matter expert). It meets part 2.2. It also lists gateway firmware 4.2.7 as applicable to two RTU gateways at one substation. An RTU is a remote terminal unit, the device that links a substation to the control center. The action was due in early September.
An unsigned or undated item does not count.
- 04The gap
A miss shows the day after its clock runs out
Gap finderThe gap finder names exactly what is missing. It needs the install record for gateway firmware 4.2.7 on the two RTU gateways. A dated mitigation plan would also do, if it is dated on or before the action due date. On the obligation clocks, the September square for patch action after evaluation is red. The action was due, and there is no record.
The gap finder does not decide whether a gap is a violation. The compliance manager and the CIP Senior Manager decide on any self-report.
- 05Drafted
The request is written to the asset owner
Request drafterThe request goes to the substation automation lead. It quotes the phrase, the record wanted and the assets, and it is due three working days after it is sent. It sits in the Drafted column beside the requests already out. These are an exercise log 5 days overdue, a relay destruction certificate 1 day overdue and a training record for one person.
The request drafter does not send a request. A person sends it.
- 06Sent, then answered
The compliance manager sends it, and the work order comes back
Substation automation leadThe compliance manager sends the request from the tab. The substation automation lead answers the same day with the work order from the field work system. It shows firmware 4.2.6 to 4.2.7 installed on both gateways in early September, during a planned outage. SCADA, the grid control system, was polling them again with no alarms, and the baseline was updated the next day.
Reply received: the work order, with its install date
- 07Checked
The reply is read against the phrase before it counts
Evidence checkerThe checker reads the work order against part 2.3. The firmware was installed 29 days after evaluation, so 412 of 412 applicable patches now have an action within 35 days. The tab turns Complete, 8 of 8, and readiness moves to 90%, with 95 of 106 checks met.
Each phrase is met. The evidence covers the whole audit period.
- 08The RSAW
The narrative cites each item, and says what is not yet proven
EMS systems engineer, CIP-007 SMEThe RSAW narrative writer drafts the entity response part by part. It cites seven evidence items, such as the patch procedure, the 23 sources for 240 Cyber Assets and the 34 cycles. Before the reply was checked, the gateway sentence was marked in red as not yet proven, with the open request named. The SME accepts the narrative, edits it or exports the RSAW.
The request is with the asset owner. This paragraph is completed when the record is checked.
- 0913 days out
Each open check has an owner and a date
NERC CIP compliance managerPre-audit readiness lists the eleven checks still open, each with its owner and request. They include a training record for one person, visitor exit times at one site and a vulnerability assessment at another. When each open request is answered and checked, the binder reaches 106 of 106.
When each open request is answered and checked, the binder reaches 106 of 106.
- 10Signed
The CIP Senior Manager signs, with the open checks in view
CIP Senior ManagerThe CIP Senior Manager signs the submission with the eleven open checks and their requests listed. The submission package freezes 1,284 items at their filed version, each with its SHA-256 hash. It indexes 39 RSAW narratives by standard, requirement and part.
Signed by the CIP Senior Manager, with 11 open checks and their requests listed