Run the quarterly benchmark, sign it as author and propose practice transfers
- Figures that hold up in the review
- The lagging plant's case argued in advance
- A transfer drafted with its evidence
Manufacturing benchmarking that sets two plants back to back on signed definitions, refuses the unfair comparisons, finds the practice behind the leader in both plants' records, and drafts its transfer as a governed change.
Follow one right first time gap to an approved transfer ↓Each quarter the operations review sets the plants side by side, and the comparison is rarely fair. One plant's right first time leaves out records QA corrected by phone, another's does not. A wet granulation record is far longer than a direct compression one, so errors per record punish the plant with the harder process. A sterile fill line gets drawn beside a tablet press.
The lagging plant head points at the mix, nobody can prove otherwise, and the review moves on. Even when the gap is real, nobody reads both plants' batch records side by side to find what the leader does differently, so the better way of working stays where it started.
Built forOperational excellence leadsPlant headsHeads of operationsQA documentation leads
Plants are compared on their own spreadsheets, so the lagging plant argues the mix and the leader's way stays put.
Compared by hand each quarter
Built-in controls
The best plant's way of working becomes every plant's way, carried by the records that prove it works.
A contract manufacturer runs its quarterly benchmark two days before the operations review. One oral solids plant trails another on batch record right first time, and its head says the records are longer and harder.
demoSample data throughout: the CDMO, its plants and clients, the people, records and every figure.
The benchmark is authored by operational excellence and countersigned by operations; a transfer needs both plants.
Run the quarterly benchmark, sign it as author and propose practice transfers
Agree to transfers into their plant, or confirm their plant's practice before it travels
Countersign the quarterly benchmark and approve practice transfers
Own batch record format and raise the change control a transfer needs
What the agents and the challenger established before anyone signed the quarter.
Per 100 entries on the steps both plants share, the gap stayed at 2.1 against 0.9.
Six records QA corrected by phone had been counted as right first time; the leader's figure became 91.2%.
1,947 of 3,191 shared-step errors, 61.0%, were on the in-process annex, led by 741 transcriptions.
Training on time ran 96.2% against 96.8%, and operators at the lagging plant had slightly more experience, not less.
demoSample data, from the working solution.
The rest of the quarter: the other measures, the definitions behind them, the transfers already moving, the sign-off and the rules.
demoSample data, from the working solution.
Manufacturing benchmarking compares plants on the same measures to find which performs better and why. Here it compares plants inside one company on signed definitions computed from their own records, refuses comparisons that are not fair, and turns the leader's practice into an approved change at the plant that trails.
Each measure carries rules for what is comparable: errors per entry rather than per record, only the steps both plants share, the same product form. A pair the rules do not allow, such as a sterile fill line against a tablet press, is shown as not comparable instead of drawn as a bar.
An external study compares sites across companies on self-reported surveys once a year. Internal benchmarking here runs each quarter on the company's own batch records and quality systems, so a gap can be traced to the pages where it starts.
A challenger argues its case first: longer records, harder steps, a different mix, a counting mistake. Each point is answered with like-for-like evidence, conceded, or sent to the plant head to answer. The plant head then reads the leader's record before agreeing to any transfer.
Yes, so it goes through change control. The transfer is drafted with its pilot, its criterion and its risks; the QA documentation lead raises the change control, and where the quality agreement requires it the client approves the revised master batch record before first use.
On one signed definition at each plant: a record accepted at its first QA review, where any return counts against it, including a correction QA agreed with production by phone. The challenger checks the agents' own count against that definition.
The operational excellence lead signs as author. The head of operations countersigns only after opening a sample of the figures, drawn when the author signs and never shown to the author, so the review starts from numbers two people have checked.
Every plant, report and agent answers from one signed number, so meetings argue causes, not definitions.
1-min demoMaster Batch Record AuthoringClient processes reach their first batch faithfully, every number traced.
1-min demoSOP Harmonization Across SitesOne way of working across four plants, improved by the plants themselves.
1-min demoSend a quarter of batch records from two plants, and we will compare them like for like and show where the leader's practice lives.