Draft each definition, answer the challenger and send it for agreement
- Each plant's real method, cited
- The forks drawn instead of argued
- Flagged reports to rebuild after signing
Manufacturing KPIs with one signed definition per measure: agents read how each plant really counts, draw where the plants disagree, retest past signed figures, and flag any report that still counts another way.
Watch four plants' OEE collapse into one definition ↓Every plant reports OEE, yield, right first time and deviation rate, and every plant computes them its own way. One takes planned changeovers out of the time base, another rates the line on its average speed, a third counts vials recovered on re-inspection as good. The workbook, report query or procedure behind each number was written by someone who has since moved on.
The difference stays invisible until two plant heads disagree in the operations review, or a client pack quotes a figure nobody can say how was computed. A working group writes a definition document; nobody tests it against the plants' real calculations, and the old spreadsheets keep running beside it.
Built forOperational excellence leadsManufacturing data stewardsPlant headsHeads of operations
Each plant counts the same measure its own way, so the operations review argues over whose number is right.
Each plant's own way of counting
Built-in controls
Every plant, report and agent answer reads one signed definition, so the review argues about losses instead of arithmetic.
A contract manufacturer with four plants drafts its third OEE definition. The operational excellence lead runs the read, and the plant heads, the data steward and the head of operations decide.
demoThe CDMO, its plants, lines, clients, people and figures are sample data.
Four plant agreements and two signatures stand behind one definition, and the person who drafted it gives none of them.
Draft each definition, answer the challenger and send it for agreement
Own the register, verify data sources and test results, sign first
Agree or send back the definition for their own plant
Approve each definition after the plants agree and the steward signs
Around the definition: the sign-off order, the register of twelve measures, each line's data sources, the trail and the rules.
demoSample data, from the working solution.
Each cites its source and passes what it found along the chain, ending with a named person.
One per plant: reads the plant's own calculation and states its branch at each step, with the passage.
Aligns the plants' recipes into one lineage, draws the forks and proposes a branch with its reason.
Speaks for each plant head and for the auditor, including against the agents' own readings.
Recomputes past signed figures from raw records and names the data source when one will not reproduce.
Keeps each line's state source, good-count point, speed table entry and shift calendar.
After signing, checks each report, screen and agent answer that uses the measure.
It is one written, signed way to compute each of the manufacturing KPIs a company tracks, such as OEE, yield, right first time and deviation rate, applied the same way in each plant. Here agents read each plant's existing method, show where they differ, test the draft, and people agree and sign it.
Because the OEE definition leaves choices open: whether planned changeovers count in the time base, how short a small stop is, which rated speed applies, and whether units recovered on re-inspection count as good. Each plant settled those its own way, often years ago.
The review argues about causes instead of arithmetic. Planned changeover and cleaning time that one plant took out of its base shows up as a named loss with an owner, and plants are compared on the same terms.
No. Each past figure keeps the definition version it was signed on. A figure shown on the new version is labeled restated, and the new definition applies from the next reporting month.
Every report, screen and agent answer is registered against the measure it uses, and after signing each one is checked. Anything that still counts another way is flagged to its owner, and a client pack is held until its owner accepts a rebuild.
FDA's revised quality metrics program leaves the choice of metrics and their calculation to each manufacturer, who reports how it calculated them. A signed definition, applied the same way at each site with its version on every figure, gives the manufacturer evidence that the calculation was the same everywhere. Signatures carry controls designed for Part 11 and Annex 11.
The definition tester names the data source behind the difference, such as a good count read before the last in-line check. A fix is raised in fixed fields for the MES engineer, the data steward verifies it, and until then that line stays off reports on the new definition.
Client processes reach their first batch faithfully, every number traced.
1-min demoSOP Harmonization Across SitesOne way of working across four plants, improved by the plants themselves.
1-min demoContract Manufacturer OversightSubcontractor oversight runs on evidence every week, and a quiet change is caught in days.
1-min demoSend each plant's workbook or report query for one measure, and we will draw where they fork and test which signed figures reproduce.