Manufacturing KPI Standardization demo

Each measure drawn from raw records to the number, forked wherever plants count differently, tested on past signed figures, then agreed and signed once. 1:29

What the demo shows

Manufacturing KPI standardization for multi-plant pharma: one signed definition per measure.

Each measure, such as OEE, is drawn as its lineage from the shift calendar, machine states, the qualified speed table and good counts to the number, and agents open a fork wherever plants count differently, showing the plants on each branch and what each branch does to every plant's number. A challenger argues for each plant head and catches the agents' own reading errors, and a tester recomputes past signed figures from the raw records and finds counters read in the wrong place. The plant heads agree, the data steward and the head of operations sign, and the forks collapse to one line. Every report and client pack that counts another way is flagged.

Transcript

  1. Manufacturing KPI Standardization: one signed definition per measure, for operations leaders.
  2. Four plants count OEE four ways; one bottle line reports 74.1 percent.
  3. Agents read each plant's calculation and draw where counting forks.
  4. A challenger speaks for each plant head, and catches the agents reading an old workbook.
  5. On version 3, changeovers are a named loss: PK3 reads 63.4.
  6. The test reproduces five of six signed figures and flags a counter.
  7. Each plant head reads their own numbers first; Plant 2 sees 74.1 become 63.4.
  8. Plant 4 agrees on condition that its counter is fixed.
  9. The data steward signs first, then the head of operations, each typing their own user ID and password.
  10. Reviews now argue causes, not definitions, and the client pack waits for its owner.
  11. Built on Botminds: agents, data, screens and governance on one platform.

The narration as written for the film. Captions are on the player.