Write each new master record and revision from the client's package
- A full draft with its numbers threaded
- Questions to the client drafted in fields
- Threaded steps accepted after opening a sample
The master batch record written from the client's own pages, every number threaded to its source, attacked by two challengers, and signed by the author, production, QA and the client.
Follow one client's tablet into the plant's record ↓When a client's product moves into the plant, an MSAT engineer opens the last similar master record and overwrites it step by step. Numbers are retyped from the client's documents, scaled by hand from the pilot bowl to the sub-lot and the batch, and equipment settings are checked from memory or a call to the line.
Production marks up what the machines cannot do, QA marks up missing yield limits and stale references, and the client is asked in free-text mail. Each round makes a new file. A parameter quietly changed to suit a pump, or a yield limit nobody wrote, surfaces at the first batch review, after the record has already been copied into a batch.
Built forMSAT process engineersProduction supervisorsQA documentation reviewersQA heads
Engineers rewrite each client process for the plant's machines by hand, and each reviewer goes back to the sources to check a number.
Retyped and checked by hand
Built-in controls
Each client process reaches its first batch as the client wrote it, in the plant's own wording, ready to check by thread.
An MSAT engineer turns a client's film-coated tablet into the plant's master record for an engineering batch, while production, QA and the client's tech transfer manager sign in turn.
demoThe CDMO, its client, the people, products, documents and figures are sample data.
MSAT owns the words, the floor owns what is possible, and QA owns the meaning of the approval.
Write each new master record and revision from the client's package
Review each record for what the line can really run
Independently check and approve master records with a stated meaning
Approve drafting rules and any loosened setting
How the draft is accepted, compared and governed once the agents have finished writing.
demoSample data, from the working solution.
The client's 2.0 kg/min sat above the pump's qualified 0.4–1.2 kg/min; the fitter had read only the granulator's summary.
Wet massing had no end; the operator challenger caught it, and the step now stops on the power plateau or at the client's maximum time.
The rule checker had passed the yield line on theoretical yield alone; the QA challenger added limits at four phases from the client's development report.
The spray-loss excess was missing; the formula now states it, with the suspension weight worked out beside it.
demoSample data, from the working solution.
Agents read, draft and ask; people send, decide and sign.
Writes each instruction in the plant's style from the client's process description, the record structure and current SOPs.
Threads each number to its passage: client page, gap assessment line, qualification report or SOP.
Checks each step against the plant's qualified equipment ranges.
Checks the draft against the federal master record rule and the EU GMP documentation chapter.
Asks of each step whether it can be done on this machine as written.
Reads as the QA reviewer and the inspector, line by line.
Drafts structured questions and reads answers only through their fields and attachment.
A master batch record is the approved set of instructions every batch of a product is made from: formula, yields, equipment, steps, checks and signatures. Here agents write the master batch record from the client's transfer package and thread every number to its source, and the author, production, QA and the client each sign.
The master is the approved original for a product and batch size; each executed batch record is a copy completed on the floor for one batch. An error in the master is copied into every executed record, which is why every number here carries its source.
In practice, yes. The federal rule calls it the master production and control record, EU GMP calls it the manufacturing formula and processing instructions, and most plants say master batch record. The rule check reads the draft against both.
No. The equipment fitter flags a step it cannot fit, and the step waits. The change goes to the client as a structured question, and only the client's returned fields and an attachment the author opened can change the step.
No. It reads the client's package, the plant's qualification reports, SOPs and existing master records, and writes the master content with its threads; the plant's own systems of record stay in place.
All signatures are cleared, the version goes up and downloads are marked unsigned, so no signature rests on wording it never saw.
One way of working across four plants, improved by the plants themselves.
1-min demoContract Manufacturer OversightSubcontractor oversight runs on evidence every week, and a quiet change is caught in days.
1-min demoSerialization & Aggregation ReconciliationEvery serial accounted for before the client's file leaves the plant.
1-min demoSend a process description, a development report and your equipment register, and we will draft one section of the master record with each number traced.