Run the dispensing plan and fix what will not weigh out
- Collisions three weeks ahead, worst first
- Each fix played against the other batches
- A reason code on the option chosen
Material expiry management that sets each lot's retest or expiry date against its planned weigh-outs, names the last day a retest sample can be taken, and rehearses each fix before people sign.
See one lot's retest date meet its weigh-out ↓The dispensing plan sits in the ERP, each lot's retest or expiry date on the lot record, QC's real retest time in the LIMS and the client's shelf-life rule in a quality agreement. The ERP allocates a released lot to a batch weeks ahead and checks status and quantity, not whether the lot will still be in date on the weigh-out day.
QC's retest list is sorted by retest date, so the lot a batch is waiting on can sit below one that is merely early. The first person to see the collision is often the dispensary operator whose scan is refused. By then a retest cannot finish, a swap takes a lot another batch was counting on, and moving the batch costs the client its date.
Built forMaterials plannersQC leadsRelease specialistsDispensing supervisors
The weigh-out date and the lot's limit date sit in different systems, so they first meet at the scale.
Kept in four places
Built-in controls
Each date that would stop a batch is found while a retest, a swap or a move can still help.
An active planned for a weigh-out one day past its retest date is caught three weeks early, and planning, the lab, quality assurance and the weigh room each take their part.
demoEvery lot, date, person, client and supplier shown here is sample data.
Planning chooses the fix, QC owns the retest and its lead times, a release specialist signs each status change second, and the weigh room refuses what the board blocks.
Run the dispensing plan and fix what will not weigh out
Own the retest queue, the lab's capacity and its lead times
Second person on each status change, swap and reject list
Run the weigh room and its two shifts
A collision set by a client's rule, a component that is never retested, stock by status at four plants, the limit rules and the record of who signed.
demoSample data, from the working solution.
Reads the dispensing plan and each planned lot's status, quantity, location and dates.
Sets each lot's limit date and its sample-by date, and marks collisions and warnings.
Plays retest, swap and move forward, listing each other batch that changes and any departure from oldest-first.
Drafts the retest: test panel, containers to sample, quantity and QC slot.
Asks the supplier for stability data in fixed fields, then reads the reply's fields and attachments.
Learns QC's actual retest times by material from the LIMS and proposes a rule.
Material expiry management keeps every lot from being weighed past its retest or expiry date, or a client's stricter limit. Here agents draw each lot planned for the next three weeks against its weigh-outs, name the last day a retest sample can be taken, and rehearse each fix for people to choose and sign.
In ICH Q7, a retest date is when a material should be re-examined to ensure it is still suitable, and an expiry date is the date after which it should not be used. Actives here carry a retest date; excipients and packaging components carry an expiry.
Only as far as the supplier's long-term stability data support it, as ICH Q7's questions and answers set out. QC opens the stability summary before proposing a new date, and a release specialist signs it second; without that data, no new date is given.
Not under the plant's procedure: an excipient or packaging component is retested only before its supplier expiry, and a ready-to-use sterile component is not retested at all. For those lots the options are a swap or a move.
The plant's procedure applies the date on the day the lot is charged into the batch, which here falls after it. The option is shown and marked not allowed, with its clause, so the planner does not have to ask.
A wrong paper is found at the plant's export desk, before the goods wait at a border.
1-min demoClient Program Business ReviewClients read their year batch by batch, and the hard questions are answered before the meeting.
1-min demoTechnology Transfer Gap AnalysisClient products reach PPQ sooner, with every gap closed by evidence.
1-min demoSend three weeks of one plant's dispensing plan and lot dates, and we will draw where they collide.