Decide each line, send client requests and approve the gap assessment
- The whole package read and mapped
- Both sides cited on each line
- Conditions that hold the batch until met
Technology transfer gap analysis that reads a client's whole package, compares each step with the receiving plant's equipment, methods and suppliers, and cites both sides.
See one client package checked against the plant ↓A client's transfer package runs to hundreds of pages: process description, development report, pilot batch records, specifications, methods, equipment and materials lists. The receiving plant's MSAT team reads each section against its own equipment register, qualification reports, instrument list, approved suppliers and cleaning procedures, and writes the gaps into a spreadsheet, often without the page that shows them.
Equipment gets compared on nominal capacity. A granulator of another design with a timed end point, a dryer whose qualified load starts above one sub-lot, or a missing exposure limit on a shared train surfaces when the engineering batch is booked, or later. Questions go to the client by email, and the answers change nothing on record.
Built forMSAT tech transfer leadsProcess engineersAnalytical transfer scientistsQA validation specialists
The plant reads the client's package against its own records by hand, and design gaps surface at the engineering batch.
Compared by hand, page by page
Built-in controls
Client products reach PPQ with each gap bridged on evidence, found while the protocol is still a draft.
The MSAT transfer lead, the process engineer, the analytical transfer scientist and QA validation work one incoming tablet transfer through them, from a client's pilot plant into an oral solids plant.
demoThe client, the plants, people, documents and figures on these screens are sample data.
The client's transfer manager answers and approves from the portal; these are the people inside the receiving plant.
Decide each line, send client requests and approve the gap assessment
Own the process lines and plan the engineering batch
Own the method transfer lines against the lab's instruments
Check the gap assessment and the protocol without deciding a line
The three comparing agents pass their lines to the challenger before the lead sees them.
Splits the client's documents into sections, maps them to the transfer checklist and marks what is missing.
Compares class, subclass, scale, qualified range and end point, shows the sums and cites both sides.
Compares each method with the QC instrument list and proposes comparative testing, co-validation, revalidation or a waiver.
Checks suppliers against the approved list, computes cleaning limits from a signed exposure limit and compares hold times with the schedule.
Reads the matrix as the inspecting authority would, and checks the agents' own drafts.
Drafts structured requests and reads the answers through their fields and attachments.
Writes the transfer protocol and its risk lines from decided lines, and clears signatures when a line changes.
Around the one granulation line: the incoming transfers, the checklist the package was mapped to, a cleaning line waiting on the client and the record of each step.
demoSample data, from the working solution.
A technology transfer gap analysis identifies what the sending site's process needs that the receiving plant does not yet have. Here agents run the technology transfer gap analysis step by step, comparing equipment, methods, materials and cleaning on both sides with each value cited, and the MSAT lead decides each line.
By class and subclass, scale, qualified range and end point, in the side-by-side terms WHO asks for: working principle, capacity, make and model. A granulator of the same class but another design is a gap with a rationale, never an automatic fit.
The decided lines, their bridges and risk scores, the bridging studies, and the prerequisites that must close before the engineering batch. The protocol drafter writes it from the matrix; the MSAT lead approves, QA checks and the client approves.
The method transfer agent compares each method with the plant's instruments and proposes comparative testing, co-validation, revalidation or a waiver backed by the lab's record. A change to the client's method goes to the client for approval.
The line can be decided on condition. The condition is printed in the protocol, blocks the engineering batch and the client's approval of the protocol, and clears only when a person accepts the client's answer.
Line by line on the fit matrix, with severity, occurrence and detection set by the plant's own scoring rule, so the high-risk lines lead the work. Each score travels with its line's verdict and bridge into the protocol, which QA checks and the client approves.
No client hears of an event late, because each client’s stricter clock wins over the plant’s own procedure.
1-min demoClient Change NotificationClients hear about a change before it is made, so improvements go live on schedule.
1-min demoCDMO RFP & Quote PreparationQuotes a client can trace to every assumption, checked against real capacity.
1-min demoBring one client package with your equipment register and qualification reports, and the agents will build its fit matrix with both sides cited.