- Before
- Two years in, most faults are new, and the person who knew has retired. The manual says change the motor, and someone must have seen this before.
- Now
- Describes the fault and gets a six-step recipe. The retired fitter's note sits in the step that matters, parts come with stock codes, and readings are checked as they are taken.
A stuck tap changer is fixed with a retired fitter's note, and the fix becomes standard
One Tuesday at 06:42, SCADA raises two alarms at one of the sample utility's 132/33 kV primary substations. SCADA is the system that watches the network from the control room. The alarms read “T2 OLTC: tap change incomplete”, then “Motor protection tripped”. An OLTC, or on-load tap changer, adjusts a transformer's voltage while it carries load. On transformer T2 it has made 184,212 operations and is stuck between taps 9 and 10. Two years in the job, the engineer on call has not met this fault before. The fitter who had met it retired last year. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0106:58
The fault, in plain words
Maintenance engineer, substationsThe engineer describes the fault in their own words: “OLTC stuck between taps, T2, motor breaker tripped”. The open job and the 06:42 alarm are already on the question bar. The run log shows the agents at work. They read the tap changer manual, rev 7, at its fault-finding, hand-operation and drive-shaft sections. They search 186,400 work orders and 1,240 root-cause reports. The safety steps are locked to the substation procedure.
Manual and procedure searcher: “found a newer service bulletin: coupling wear past 150,000 operations, missing from the manual's table”
- 029.4 seconds later
A six-step fix recipe, each step cited
Fix recipe writerFive agents took 8 steps over 6 documents and 14 past jobs. The answer opens with the symptoms it matched. These are the tap change incomplete alarm, motor protection Q1 tripped, the indicator between taps 9 and 10, and more than 150,000 operations. Then come six numbered steps, each with its source. Beside them, a panel called Manual says · Field says compares the two. The manual's fault table points to the motor. The field record says check the coupling first, then test the motor, and keep it if it passes.
What was done, and did it hold? Coupling replaced: 0 of 9 came back. Motor replaced: 2 of 3 came back.
- 03Step 4
The retired fitter's note, in the step where it matters
Senior substation fitter, retiredStep 4 says to inspect the vertical drive-shaft coupling, gearbox end first. The engineer looks for a sheared nylon insert or a missing shear pin. On drives of this model past 150,000 operations, this is the usual cause. That is why it comes before any motor change. The retired fitter's note from an earlier job on this same transformer is pinned to the step. Safety steps 1 and 6 are quoted word for word from the substation procedure and the Safety Rules.
Job note on this unit, four years and eight months earlier: “Replace the drive-shaft coupling. Leave the motor. Motor tests fine every time, it's the coupling insert shearing. Check the gearbox end first.”
- 04Why not the motor
Fourteen jobs, read from the technicians' own words
Work history minerThe work history miner read each closing note on record for this tap changer model and symptom. It grouped them by the fix that was really done. The coupling was replaced 9 times, with 0 repeats in 90 days. The motor was replaced 3 times, with 2 repeats in 30 days. On two units the fault came back 9 and 11 days after the new motor went in. Both times the next job found the coupling insert sheared. On a third unit the motor winding really was open circuit, so step 3 still tests the motor.
A later job, after the fitter retired: “Took two calls to find someone who knew. Coupling insert. Replaced the kit.”
- 0507:05
The right part reserved, the expensive one left on the shelf
Parts and tools checkerThe parts list shows the coupling insert kit at $110. The nearest depot has 4 in stock, and the list gives the bin. It also has 12 shear pins. The $6,200 drive motor is marked as not needed. The engineer reserves the kit against the open job. Underneath sit three past jobs where this fix worked, each done in about two hours.
Parts and tools checker: it reserves only when the engineer asks, and it does not order.
- 0607:40
The recipe becomes the job sheet
Maintenance engineer, with the authorized personThe authorized person, who issues permits to work, issued one at 07:36. It covers the T2 motor drive cabinet, with Q1 open, locked and a notice fitted. The engineer works through the recipe as a checklist. Motor readings come in from the insulation tester, 210 MΩ and 4.3 Ω. Each is checked against the manual's range as it lands. The motor is good, so it stays.
“✓ within the manual's range” · insulation resistance > 20 MΩ, winding 4.1 to 4.6 Ω
- 0709:52
T2 is back on automatic voltage control, and the note is drafted from the readings
Knowledge stewardThe coupling insert had sheared at the bevel gearbox end. The insert and shear pin were replaced, with grub screws at 12 N·m, and the step time is now 5.1 s. T2 is back on REMOTE and automatic voltage control at 09:52, 2 h 12 after the job started. When the engineer closes the job, the knowledge steward drafts the closing note from the readings and finding. It links the note to the fitter's earlier job on this unit. The note is the engineer's to edit and sign.
Drafted note: “Second coupling failure on this unit in 4 years and 8 months. Suggest a coupling check at each tap changer maintenance on units of this model past 150,000 operations.”
- 08Signed 09:58
No note reaches anyone else until a reliability engineer reads it
Reliability engineer, network assetsThe engineer signs, and the note goes to Field fixes to wait for the reliability engineer. Beside it, the knowledge steward suggests adding this job to the model's field fix as its 10th coupling job. The reliability engineer can publish the note or ask the engineer a question first. Here the reliability engineer publishes it.
“Nothing changes in an answer until a reliability engineer approves it.”
- 0914:20
Field-proven, for each unit of this model past 150,000 operations
Reliability engineerThe proposal shows today's answer, which follows the manual's table, beside the proposed recipe. The evidence is listed against the rule. There are 9 jobs with the same fix, where at least 3 are needed. None of the 9 came back within 90 days. The fix agrees with the newer service bulletin. Safety steps are unchanged and quoted from the substation procedure. Approval changes the answer for 12 assets. The reliability engineer approves it as field-proven. The other choices were to ask the manufacturer to confirm, or to reject it with a reason.
“Approved by the reliability engineer at 14:20. Answers now lead with this fix.”
- 10Before the next one leaves
Ask the next expert now, while they are still here
Senior process technician, water treatment worksA senior process technician retires in 66 days, after 34 years on dosing, filters and pumps. Of the technician's 1,412 jobs, 41 % have a usable note. The coverage map shows where the knowledge is written down and where it is missing. Filters, for example, are at 29 %. The knowledge steward drafted questions from the gaps for the next session. One asks what “as before” means on 9 vibration jobs on high-lift pump 2.
Session 1 · 47 minutes. Five notes drafted from the recording, and the technician has signed 3.