WorkflowAsset Management & Maintenance

Inspection Finding Triage

Inspection finding triage: each defect found becomes a work order with a due date, and no crew is sent twice

See one case, screen by screen ↓
Watch with transcript →

Built forMaintenance plannersInspection supervisorsAsset engineersLine crew leads

The Problem Today

Planners read each inspection report one by one, so findings sit with no job and no date.

1,766
past-due work orders in a 2020 audit of one transmission area published
6.5 days
from a routine finding to a dated work request, by hand our estimate

Each report read by hand

  • Patrols
  • Drones
  • Pole tests
  • Thermal
  • Two crews for one defectRepeat sightings raised as new jobs
  • Which pole is this?A photo with no tag, or the wrong one

The Solution

  1. Reports split into findingsDrone frames, pole tests and thermal surveys, each tied to its asset
  2. Priority set by your rulesDue date from your defect rules. A hot clamp becomes a make-safe job.
  3. Checked against open jobsA repeat sighting joins the open job as evidence, and raises it if worse
  4. The planner sends the laneDrafted work requests checked and sent to work management in one go

Built-in controls

  • A make-safe reaches a person at once
  • Agents never lower, close or extend a job
  • Each merge records its reasons

What You Get

Each known defect gets a priority, a due date and a job, and each clock is watched until the work is done.

$620K
a year in duplicate crew visits not sent our estimate
  • Each finding datedA due date from your defect rules, before any job is drafted
  • Clocks watched hourlyThe planner is alerted before a job falls due
  • Work requests crews can useTask, materials, outage need, marked photo and map position
In short

What is Inspection Finding Triage?

It turns each inspection finding into a decision. A finding may be a patrol photo, a drone frame, a pole test result or a hot spot on a thermal survey. Triage answers which asset it is, how urgent it is, whether a job already exists, and when it must be fixed. Inspection Finding Triage does that with seven agents and drafts the work request. The maintenance planner decides and sends it.

How to choose AI solutions for utilities →

Updated

The problem

Planners read every inspection report one by one, so defects wait or get raised twice

A utility inspects its network all year. Crews walk the lines and drones fly them. Teams scan substations for hot spots and test wood poles, contractors send their own surveys, and water teams do pump-station rounds. Each inspection sends back findings, each a photo and a note saying something is wrong. They come as field-app forms, contractor PDFs, spreadsheets and folders of images. Someone has to read each one and work out which pole or plant item it is. Then they look for an open job, set a priority from the defect rules and type a work request. On a patrol day that is 30 to 60 findings for one planner.

So findings wait in inboxes and contractor portals, and some are never raised. Others are raised twice. A line patrol sees a cracked insulator one month and a drone sees it the next, so a second crew goes out. Often the second photo shows the crack getting worse, yet the first job keeps its old, slower date. Regulators check open defects against their due dates. Level 1 is the most serious grade, which must be fixed at once. A known Level 1 defect waiting in a queue is exactly what every audit and incident report looks for.

typical1,442laterepair jobs finished after their due date in one division over three years, found in a state regulator's audit
typical1,766past duepast-due work orders counted in the same regulator's 2020 audit of one transmission area
estimated$250-500a visitfor a utility truck roll, the cost of each extra crew sent to a defect that already has a job
Where a routine finding's days go, from inspection to a dated work requestestimated
By hand6.5 days
With the solution0.7 days
  • Waiting in an inbox or contractor portal3 → 0 d
  • Reading the form, PDF or photo and finding the asset in the register1 → 0.1 d
  • Searching the open work orders for a job already raised0.5 → 0.0 d
  • Setting the priority and due date from the defect rules0.5 → 0.0 d
  • Writing the work request0.5 → 0.1 d
  • Planner review and send to work management1 → 0.5 d

Our estimated split, in working days, of one routine finding from a patrol, drone or contractor report, by hand and with the solution. A make-safe is handled within the hour.

How it works

How inspection findings become dated jobs, from report to work management

What comes in
Findings in5 inspection types · patrols, drones, pole tests, thermal, water rounds
Agents at work
Report readerone finding each
Then
Photo inspector
Asset matcher
Then
Severity assessorrule + due date
Then
Duplicate checkeropen job? evidence added
Then
Work request writer
Clock watcher
A person decides
Maintenance plannerdecides and sends
What comes out
Work request sent
Evidence on the open job
Due date watched
One case, step by step

Inspection finding triage on one morning: 46 findings sorted by their clocks

A utility runs electricity and water across one network from a single depot. One morning at 07:40, the maintenance planner opens Inspection Finding Triage. Here is what happened overnight and what the planner decides, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Start of the day

    46 findings since the planner left, already sorted by their clocks

    Maintenance planner

    Since the planner left yesterday, 46 findings arrived from 5 inspections. Each one was read, tied to its asset and given a priority from the utility's rules. Then it was checked against 1,284 open work orders before any job was drafted. They sit in six lanes. Two are in Make safe · 24 hours, 12 in Within 30 days and 15 in Within 6 months. Six are in Next planned visit, 8 in Already open · evidence added and 3 in Needs a look.

    “35 work requests drafted · 2 sent · 8 added to open jobs · 3 need a look · 0 without a due date”

  2. 02Overnight

    Five deliveries split into findings, each with its measurement

    Report reader

    A contractor's drone patrol of a 33 kV line sent 212 images and a flight log. They became 19 findings in 11 minutes. A pole testing contractor sent a 22-page PDF with a sheet of 88 poles. It became 14 findings in 1 minute 40 seconds. A thermal contractor's 38-page survey of a 33/11 kV substation became 6. Five patrol forms from line crews and a pump-station inspection make up the rest.

  3. 03The evening before

    A hot clamp goes straight to make safe

    Severity assessor and Clock watcher

    The thermal image shows the red-phase palm clamp on 11 kV disconnector DS-4 at 96.4 °C. The same part on the yellow phase reads 35.2 °C. That is a 61.2 K rise at 58 % load. Under the thermal rule, a rise of over 40 K between like parts makes it a 24-hour make-safe, a job to make the site safe. The clock watcher paged the duty supervisor at 18:10, and the supervisor confirmed at 18:22. A substation crew is booked for 08:00 and the switching schedule is issued.

    Drafted task: “Make safe: move Section 4 load to CB-9, isolate DS-4 and re-make the red-phase palm clamp”

  4. 04As each finding arrives

    Checked against 1,284 open work orders before a job is drafted

    Duplicate checker

    The board replays the night, with each finding placed in its lane as it arrived. One drone frame shows a pole with a cracked insulator and carbon tracking, the burn marks left by current leaking across it. The frame stops before it reaches a lane, while the duplicate checker searches the open jobs on the same asset and part.

  5. 05Already open

    A 97 % match with a job the crew lead raised earlier

    Duplicate checker

    The open job reads “Replace cracked insulator, phase B”. The line crew lead raised it weeks earlier from a foot patrol. It is set at 6 months and planned, but no crew is booked. It has the same pole tag, a GPS fix 4 m away and the same phase B pin insulator. So no new job is raised, and the drone photo is added to the job as evidence. The defect is worse now, though. The patrol photo showed a hairline crack with no tracking. Now the drone frame shows tracking down two sheds.

  6. 06One click

    The planner raises the open job to 30 days

    Maintenance planner

    The insulator rule says a cracked insulator with carbon tracking or flashover marks must be fixed within 30 days. So the duplicate checker proposes raising the job from 6 months to 30 days. It cannot change the job itself. The planner compares the two photos side by side and raises it. The crew lead is told the job moved up, and both photos stay on the job.

  7. 07Needs a look

    Three findings wait for a person, with the reason

    Inspection supervisor

    One drone frame is blurred by wind. It shows a line across the second shed of phase A that may be a crack or a shadow. The confidence is 0.58, under the 0.80 threshold, so it goes to a person. Another finding has no pole tag and a GPS fix between two poles 11 m apart. A third has a note naming one pole and a photo whose tag shows the next. The supervisor settles each one.

    Choices on the drone frame: “It is a crack · 6 months” · “Ask the contractor to re-fly the pole” · “No defect · close”

  8. 08Overdue

    A patrol sighting brings an overdue job back to the top

    Duplicate checker and Clock watcher

    A patrol form reads “Crossarm soft at the phase C end, getting worse”. It matches an open job raised at 30 days that is now 30 days overdue, with no crew booked. The sighting is added as evidence, and the job is escalated to the planner. The work orders list shows each open repair job with its clock and the evidence added overnight.

    “Replace crossarm · Overdue 30 days · no crew booked”

  9. 09Sent

    The 30-day lane goes to work management in one go

    Maintenance planner

    Each drafted request carries the task, crew, materials, outage need, marked photo, map position and due date. One reads “Replace the crossarm and king bolt”. Another reads “Cut back the vegetation to 3 m clearance”. A third reads “Replace the pole; mark it ‘no climbing’ until replaced”. The planner checks the lane and sends the 12 requests. Nothing reaches the work management system until the planner sends it.

  10. 10On the hour

    Due dates watched until the job is done

    Clock watcher

    Each hour, the clock watcher checks each open job and finding against its due date. It alerts the planner 7 days before a 30-day job is due, and lists what is at risk or overdue. A pump-station kiosk door is 4 days overdue, with a crew booked. A reservoir roof hatch is due soon, with no crew. Over 90 days, 23 of 23 make-safes were raised within the hour, and the duty supervisor was paged each time. Of the 30-day jobs, 94 % were on time, 218 of 232. Of 3,412 findings, 512 were added to a job already open, or 15.0 %. No finding was left without a due date.

Who it’s for

The four people who take a finding from patrol to work order

The same morning's findings, seen by four people. What the week looked like before, and what it looks like now.

Maintenance planner
Plans corrective work, decides and sends
Before
Reads 30 to 60 findings one by one on a patrol day. Spends the morning working out which pole a photo shows and whether a job already exists.
Now
Opens a board already sorted by clock. Each work request is drafted and each repeat sighting sits on its open job. Then the planner decides, raises and sends.
Inspection supervisor
Owns the programs, confirms make-safes
Before
Owns the inspection programs. Urgent defects, such as a hot clamp at 96 degrees, wait until someone opens the inbox.
Now
Is paged the moment a make-safe is found, confirms it and books the crew. Settles the findings that need a look, each with the reason.
Asset engineer
Owns the defect priority rules
Before
Owns the defect rules that planners apply by hand, one finding at a time. Needs to know who lowered a priority and why.
Now
Sees each rule with how often it was used. Approves each downgrade and rule change, and tests a change against the last 90 days first.
Line crew lead
Patrols on foot, raises jobs by phone
Before
Reports defects by phone while on foot patrol. A job keeps its first date even when the defect gets worse.
Now
Is told when the earlier job gets the drone photo as evidence and moves up to 30 days.
The agents

Report, defect, asset and clock agents in inspection finding triage

Each finding is read, tied to its asset, given a priority and checked against open jobs before a request is drafted. The maintenance planner decides and sends.

Report reader

Reads patrol forms, contractor PDFs, spreadsheets and photo details. Splits each delivery into separate findings, with their measurements, the inspector's words and the time found.

  • Never invents a measurement that is missing from the report
  • A finding keeps a link to the page or frame it came from
Photo inspector

Finds the part and the defect in each photo or thermal image and marks it on the image. Compares it with the inspector's note and says how sure it is.

  • Never decides a make-safe alone. The supervisor confirms
  • Below 0.80 confidence, or when the photo and the note disagree, a person decides
Asset matcher

Ties each finding to one asset in the register. It uses the pole tag first, then GPS within 15 m on the named circuit.

  • Never guesses between two assets within 15 m. It asks a person
Severity assessor

Applies the utility's defect rules and the adjustments to them, such as the fire-risk area or a repeat on the same part. Sets the priority and due date, and names the rule that decided it.

  • Never lowers a priority set by an inspector
  • A downgrade needs the asset engineer
Duplicate checker

Checks each finding against the open work orders on the same asset and part. Adds a match to the job as evidence. Proposes a faster priority if the new evidence is worse.

  • Never closes, cancels or changes the priority of a job itself
  • Each merge records its reasons: tag, distance, part, defect
Work request writer

Drafts the work request in the depot's own words. It covers the task, crew, materials, outage need, marked photo, map position and due date.

  • Never sends to the work management system without the planner
Clock watcher

Checks each open finding and job against its due date every hour. Alerts the planner before the clock runs out. Pages the duty supervisor at once for a make-safe.

  • Never extends a due date
Maintenance planner

Decides and sends.

Ask in plain words

Planner questions on a merged finding, a make-safe crew or a pole's history

Ask about any finding, job or rule, or say what to change. Each answer points to the finding, the job or the rule behind it. These answers come from the sample network above.

Why did this drone finding go onto an existing job instead of a new one?

Because a job is already open for the same defect on the same insulator. The drone frame and the crew lead's patrol photo share the pole tag and are 4 m apart by GPS. Both show the phase B pin insulator cracked, a 97 % match. The new photo also shows carbon tracking, which the insulator rule puts at 30 days. So a raise from 6 months to 30 days is proposed. That is your decision.

Which make-safe jobs need a crew today?

Two, both due today. At the substation, the red-phase clamp is at 96.4 °C, 61.2 K above the yellow phase, due 14:20. The supervisor confirmed it at 18:22 and a substation crew is booked for 08:00. On a public footpath, phase C hangs 4.9 m over the path against a 5.8 m minimum, due 15:52. The line crew is booked for 08:30 and the path will be closed off first.

Show everything on this pole

It is a 1984 wood pole on the 33 kV line. It has one open job and two sightings of the same phase B insulator: the crew lead's patrol and yesterday's drone frame. Its last pole test gave 64 % remaining strength.

Make vegetation within 1.5 m in the fire-risk area a make-safe

Drafted as a new rule. Vegetation within 1.5 m of a live 33 kV line inside the fire-risk area becomes a 24-hour make-safe. Over the last 90 days it would have moved 9 findings, all on one line between poles 120 and 128. Rule changes need the asset engineer, so it is waiting for that approval. Nothing changes until then.

The screens

The triage board, a make-safe finding, the repeat match and the network map

From the working solution, on its sample data. Pick one to see it large.

The triage boardOvernight findings sorted by clock into six lanes, from make safe and 30 days to already open and needs a look. Each shows its photo, asset, due date and drafted work request.
InspectionsWhat came in since yesterday, and the programs that send findings.
A make-safe findingThe thermal image marked at 96.4 °C, the inspector's note, the thermal rule, the drafted work request and how each agent sorted it, with times.
Checking for an open jobA replay of the overnight sort. A drone finding waits while 1,284 open work orders are checked for the same asset and part.
Already open, evidence addedThe open job and the new sighting side by side. It shows old and new photos, the 97 % match and the proposal to raise the job to 30 days.
Priority raised by the plannerThe open job raised to 30 days by the planner. The crew lead is told and both photos stay on the job.
Needs a lookA blurred drone frame at 0.58 confidence goes to the inspection supervisor, with the reason and three ways to settle it.
A lane sentThe 30-day lane sent to work management in one go: 12 work requests, each with photo, place, crew and due date.
Open repair work ordersEach open job with its priority, due date and status. It shows the evidence added overnight, the raises proposed and the overdue jobs.
The network mapFindings on two circuits, the substations and the water sites, pinned by priority, with the fire-risk area.
ClocksThe clock watcher's list of jobs at risk and overdue, and the on-time measures for the last 90 days.
Defect priority rulesThe utility's rules by group, such as public safety, thermal, insulators and poles. Each shows its clock, reason and use over 90 days, and the adjustments applied after it.
Your settingsPriority clocks, the open-job check, who decides, the photo confidence threshold and the connected systems.
Governance

Inspection finding rules, merges and make-safes, each on the audit trail

Each priority cites its ruleEach finding shows the rule that set its priority and due date, and the reason behind it. It keeps the original photo, frame or report page it came from.
Each merge records its reasonsWhen a sighting is added to an open job, the facts of the match are kept with it. They are the pole tag, GPS distance, part and defect, with the old and new photos side by side.
A make-safe reaches a person at onceA make-safe pages the duty supervisor by phone and text the moment it is found. A person confirms it and books the crew. No agent decides a make-safe alone.
Agents never lower, close or extendAgents do not close, cancel or lower the priority of a job, or extend a due date. A faster priority on an open job is only proposed, and the planner decides.
Who decides whatThe planner sends work requests and accepts priority raises. The inspection supervisor confirms make-safes and settles Needs a look. Only the asset engineer approves a downgrade or a rule change, and the 90-day test result is kept with the approval.
Each step on the audit trailEach agent step and each human decision is recorded with its time. That includes who confirmed a make-safe, who raised a job, who sent a lane and who approved a rule. Each change to the settings is recorded too.
Configuration

Defect priorities, repair clocks and the open-job check, as settings

The repair clocks, the open-job check, the confidence threshold and who decides are settings for each network. Each change is recorded in the audit trail.

SettingDefaultChoose from
Make safe24 hoursPages the duty supervisor at once
Within 30 days30 daysAlerts the planner 7 days before
Within 6 months6 monthsAlerts the planner 30 days before. Next planned visit adds the finding to the next inspection of that asset
Look for open jobs onSame componentSame component · Same asset
Distance15 mGPS distance between the sighting and the asset
Match needed to add as evidence90 %Below this, a person decides
When the new evidence is worseOnPropose a faster priority to the planner
Photo confidence0.80Below this, the finding needs a look
Connections

Drone, pole test, thermal and patrol reports, and the systems they feed

Work management systemwork requests out, and open repair jobs in every 10 minutes
Asset register and network mappoles, substation plant and water assets with position, age and last test
Contractor portalsdrone images and flight logs, thermal reports and pole test sheets
Field apppatrol forms from line crews, with photos and GPS
Defect priority rulesyour defects, clocks and adjustments, owned by the asset engineer
Inspection forms and reportsPDFs, spreadsheets and photos, each finding linked to its page or frame
What it changes

Make-safe clocks, duplicate visits and dated jobs in inspection finding triage

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
< 1h
from a make-safe finding arriving to a 24-hour job, with the duty supervisor alerted
In an inboxnext working day
With agents≈ 5 min
demo
$620K
a year in duplicate crew visits not sent, because repeat sightings go onto the open job, on the sample network
15 % already open
of findings in the sample network's 90 days
target
0
known defects left without a work request and a due date. This is the design goal, with each clock watched
Each sample finding dated
dated early in the sample morning

“demo” means seen in the working solution, on its sample network data. “target” means the design goal, measured in the live solution. “estimated” means our arithmetic or estimate, inputs shown. “typical” means published figures from two California regulator (CPUC) audits. Audit EA2014-032 found 1,442 repair jobs finished after their due date in one division over three years. Audit TA2020-884 found 1,766 past-due work orders in one transmission area. “estimated” also marks vendor figures: a truck roll costs $250 to $500 (S&C Electric, via Ventavid). The estimated $620K a year in duplicate visits not sent uses sample inputs. That is 13,800 findings a year × 15 % already on an open job × $300 a visit. Rules behind it: CPUC General Order 95, Rule 18 (repair clocks) and ANSI/NETA MTS Table 100.18 (thermal bands). Names on the screens are sample data.

Questions

Inspection finding triage questions from asset and maintenance teams

What is inspection finding triage?

It turns each inspection finding into a decision. A finding may be a patrol photo, a drone frame, a pole test result or a hot spot on a thermal survey. Triage answers which asset it is, how urgent it is, whether a job already exists, and when it must be fixed. Inspection Finding Triage does that with seven agents and drafts the work request. The maintenance planner decides and sends it.

How does inspection finding triage software work?

The report reader splits each delivery into findings with their measurements. In each photo, the photo inspector marks the defect and says how sure it is. The asset matcher ties the finding to the register by pole tag and GPS. Next, the severity assessor sets the priority and due date from your rules. Then the duplicate checker searches the open work orders. The work request writer drafts the job with photo, place, crew and due date.

Does it raise duplicate work orders for the same defect?

No. Before any job is drafted, each finding is checked against open work orders on the same asset and part within 15 m. A match of 90 % or more goes onto the existing job as evidence, and no new job is raised. Below that, a person decides. In the sample network, 512 of 3,412 findings in 90 days went onto a job already open.

What happens when a repeat sighting shows the defect getting worse?

The duplicate checker proposes a faster priority on the open job. It does not change the job itself. In the sample case, a patrol had reported a cracked insulator with no tracking. A later drone photo showed carbon tracking, so the checker proposed raising the job from 6 months to 30 days. The planner compared the photos and raised it.

How are make-safe and urgent defects handled?

A finding becomes a 24-hour job when it meets a make-safe rule. One example is a clamp more than 40 K hotter than its like phases. Others are a line below the minimum height over a footpath, or a pole under 33 % remaining strength. The clock watcher pages the duty supervisor at once by phone and text. A person confirms it and books the crew.

Can it use our own defect priority rules and repair clocks?

Yes. The rules, the clocks and the adjustments are yours, owned by your asset engineer. One adjustment might be one level faster in the fire-risk area, or for a repeat on the same part within 12 months. A change takes effect only when the asset engineer approves it, after a test against the last 90 days. Where a regulator sets repair clocks, such as California's GO 95 Rule 18, your rules can carry them.

Is it inspection defect management software for water utilities too?

Yes. The same board takes pump-station and reservoir rounds from water operations, with rules for pump seal leaks and damaged gauges. In the sample network, a pump-station inspection and a reservoir round sit on the same map and clocks as the 33 kV lines and substations.

Who can send a job, lower a priority or change a rule?

Only people. Nothing goes to the work management system until the planner sends it, and only the planner accepts a priority raise. The inspection supervisor confirms each make-safe and settles findings that need a look. Only the asset engineer can lower a priority or change a rule. Agents do not close, cancel or downgrade a job, or extend a due date.

What does a utility hand over before inspection finding triage goes live?

Your defect priority rules, inspection programs and sample reports. Also the details of the work management system and asset register it connects to. The Agentic Solution Engine builds and deploys it from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own inspection findings first.

Sort your own inspection findings
by clock, and catch the repeats.

We'll run it on a sample of your own patrol, drone and contractor reports.