WorkflowAsset Management & Maintenance

Condition Assessment Report Review

Condition assessment report review that puts every finding you paid for into the asset health index, with each grade checked against the last survey

See one case, screen by screen ↓
Watch with transcript →

Built forAsset engineersCondition assessment leadsAsset data stewardsCapital planning managers

The Problem Today

Engineers type condition reports into the asset system by hand, or never do, so health models run on old grades.

50 h
of engineer time to review one five-yearly site survey by hand our estimate

Each page typed in by hand

  • Grades
  • Readings
  • Photos
  • Lab tests
  • A roof wrongly graded goodA leaking roof slips out of the capital plan
  • Readings past their limitAn out-of-limit breaker waits for the next outage

The Solution

  1. Each asset matchedEach asset in the report found by tag, nameplate and serial
  2. Findings tied to sentencesEach grade and reading taken with its page and sentence
  3. Readings against limitsAn out-of-limit reading becomes a defect for the planner
  4. The engineer decidesGrades checked against the last survey and work orders, and flags decided

Built-in controls

  • Nothing reaches the asset system before release
  • Limits come only from your own standards
  • Consultants see only their own reports

What You Get

Renewals are ranked on current, checked grades, so capital money follows true condition.

5.5 h
of engineer time on that same survey, against 50 by hand our estimate
  • Doubtful grades caughtEach grade checked against the last survey and the work orders
  • Register kept trueSerial mismatches and missing assets sent to the data steward
  • A summary for the planOne cited page for capital planning, signed twice
In short

What is Condition Assessment Report Review?

Condition assessment report review software reads the condition reports and test certificates that consultants, manufacturers and test crews deliver. It turns them into structured findings and readings for the EAM and the asset health index. Condition Assessment Report Review uses six agents to read, match, extract, check limits and compare with the last survey. The asset engineer decides what they question, and a data steward releases the update.

How to choose AI solutions for utilities →

Updated

The problem

Condition reports a utility pays for reach the asset system late, or not at all

A utility pays consultants, manufacturers and test crews to check the condition of its assets. Their findings should feed the asset health index, the score that capital planning uses to rank renewals. The evidence arrives as long PDFs. One is a 148-page five-yearly survey of a water treatment works. Others are 22 breaker timing and contact resistance certificates from a primary substation. A trunk-main wall thickness survey and a quarterly batch of oil lab results come too.

Someone has to type every grade and reading into the EAM, the system that holds the asset register and work orders. Often that happens weeks later, and much of it never happens at all. So the health index runs on the previous survey, or on nothing. Nobody re-reads the last report either, and grades are compared from memory, if at all. A roof can go from poor to good with no repair on record, and the new grade goes straight into the index. So can a breaker graded good that trips late on its own certificate. A replaced pump keeps its old nameplate in the register, and new plant is not added to it. Capital money then goes to the wrong assets, and defects past their limits wait for the next outage.

typical6 + 6defectsgrade-1 and grade-5 pipe defects (NASSCO grading, 5 = worst) that can average to a Pipe Rating Index of 3, hiding the severe ones
Hours an engineer spends on one five-yearly survey, by taskestimated
By hand50 hours
With the solution5.5 hours
  • Reading the report, its tables, photographs and appended certificates16 → 1 h
  • Matching each asset to the register by tag, nameplate and serial4 → 0.5 h
  • Re-keying grades and readings into the EAM12 → 0.5 h
  • Checking readings against standards and manufacturers' limits4 → 0.5 h
  • Comparing grades with the last survey and the work history8 → 2 h
  • Writing defects, consultant questions and the capital planning summary6 → 1 h

Estimated split, in working hours, for one 148-page site survey with about 140 findings, by hand and with the solution. With the solution, the hours left are the engineer's decisions on flagged findings and the steward's release.

How it works

How a condition report becomes cited findings and a released EAM update

What comes in
Condition report inOne full report · survey, test certificates, photos, last report
Agents at work
Report readerpages, tables, photos
Then
Asset matcher
Findings extractor
Then
Limits checker
History checkerlast survey + work orders
Then
Update writerEAM file + summary
A person decides
Asset engineerdecides what is questioned
What comes out
EAM update
Defects raised
Summary for capital planning
One case, step by step

A five-yearly treatment works survey, a questioned roof and seven defects

A utility’s water treatment works has its five-yearly condition assessment back from the consulting firm that surveyed it. The report runs to 148 pages, revision 0, and arrived ten days after it was issued. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01The next morning

    The report opens beside its findings table

    Asset engineer

    The asset engineer owns the treatment works in the south region and reads each consultant report for them. The review screen shows the report on the left, page by page. On the right are the 63 assets in scope, each with its grade from the last survey. The new column still reads “not read”.

    “Not read yet. Six agents will read all 148 pages and match each asset to the register. They will check each reading against its limit and compare each grade with the last survey and the work history. You decide on anything they question.”

  2. 02One click

    Six agents read the survey, step by step

    Six agents

    The engineer clicks Read the report. First, the report reader takes in 5 sections, 31 tables, 108 photographs and 9 test certificates in Appendix C. Next, the asset matcher finds 63 of 64 assets in the register. The findings extractor pulls 142 findings and 38 readings. Then the limits checker tests the readings against 10 limits, and the history checker compares each grade with the last survey.

    Asset matcher: “Matched 63 of 64 assets to the register · one motor control center is not in the register · one pump’s serial differs.”

  3. 034 min 12 s later

    Twelve findings need the engineer, and the rest are ready

    Asset engineer

    The screen opens on Needs you, with 12 of 142 findings. A raw water pump shows Serial differs, and a motor control center shows Not in register. Seven rows are Out of limit. They include one breaker’s contact resistance at 142 µΩ, and the works transformer’s oil at 38 kV with acetylene at 4 ppm. Another raw water pump has a polarization index of 1.4, and the DN600 rising main wall is at 6.1 mm.

    “Read by six agents in 4 min 12 s. 142 findings and 38 readings from 148 pages. 7 out of limit. 6 grades questioned against the last survey. 12 need you.”

  4. 04Any row

    Each reading, tied to its sentence and its limit

    Findings extractor and Limits checker

    Clicking the transformer’s insulating oil row scrolls the report to section 4.10 on page 32. It highlights the sentence giving a breakdown voltage of 38 kV, with its lab certificate. The row shows the reading against the IEC 60422 limit of ≥ 40 kV for equipment below 72.5 kV. It also shows the recommended action.

    Limits checker: “Filter and dry the oil. Resample after treatment.”

  5. 05The question

    The roof rose from 2 to 4 with no repair on record

    History checker

    The consultant graded the filter building roof covering 4, good. At the last survey, another firm graded it 2, with blistering, splits and water getting into the filter gallery. Since then, the work history shows only gutter clearing and a temporary patch. The roof replacement project is deferred and not started. Photograph 5.4 shows a single-ply membrane, but the filter building has built-up felt.

    History checker: “The chemical building roof was relaid in single-ply after the last survey, under its own work order. The surveyor may have graded the wrong roof.”

  6. 06Decided

    The engineer keeps grade 2 and asks the consultant

    Asset engineer

    Three sources sit side by side. They are this report’s sentence on page 52, the last survey’s sentence on page 28, and the work orders. The asset history draws the grade over the last three surveys, with the questioned rise dashed. The engineer chooses Keep grade 2 and ask the consultant. Accepting grade 4 would have needed a written reason, shown to the condition assessment lead with the summary.

    “Kept grade 2 · question sent to the consultant · 11 still need you”. The answer is due in 10 working days under the framework contract.

  7. 07Since the last survey

    Each grade that moved, and why

    History checker

    Changes since the last survey sets the two surveys side by side for the 63 assets in both. Of those, 49 held their grade, 9 got worse and 5 improved. Six grades are questioned against that survey and 214 work orders. One is the backwash pump, which rose from 2 to 4 while its vibration stayed the same (6.9 mm/s then, 6.8 now). Another is a breaker graded 4 although its trip time is 71 ms. Seven element grades that improved are explained by completed work, such as a breaker mechanism overhaul.

    “Improved, with the work that explains it · 7, accepted by the History checker”

  8. 08Seven defects

    A defect for each reading past its limit

    Asset engineer

    Readings shows the 38 readings against their limits, each with its standard, source page and recommended action. For the high-resistance breaker, the action is to replace the L2 vacuum interrupter at the next outage. For the slow breaker, the action is to restrict it to manual switching until it trips within 60 ms. For the weak pump motor, the action is to rewind or replace it and run the other raw water pumps as duty. The engineer clicks Raise defects for all 7. Seven defect notifications are drafted for the maintenance planner.

    “7 defects drafted for the maintenance planner · 4 findings still need you”

  9. 09Released

    The steward releases the update, and the health index recalculates tonight

    Asset data steward

    The EAM update file holds a condition update or reading for each finding, each with its source page. The engineer sends 138 ready updates to the data steward. Four stay held until they are decided. The steward releases the 138. Two more changes are waiting. One corrects the register for the pump with the new serial and nameplate. The other is a new asset record for the motor control center.

    “The data steward released 138 updates · the works health index recalculates tonight”

  10. 10For capital planning

    A one-page summary, signed twice

    Condition assessment lead

    The update writer drafts the summary from the findings and the engineer’s decisions, with each line linked to its page. It tells capital planning to keep the filter building roof replacement in next year’s plan. It also says the DN600 rising main, at 6.1 mm against 7.0 mm, supports bringing its renewal forward. The engineer signs it and sends it to the condition assessment lead. The lead signs and sends it to the capital planning manager.

    In one line: “The filter building roof is not improved. It stays at grade 2 until the consultant explains a grade the work history does not support.”

Who it’s for

Who touches a condition assessment, from the asset engineer to the consultant

One survey passes through five jobs. Each card shows that job by hand, and with the agents.

Asset engineer
Accepts and questions findings
Before
Owns 11 works and reads each consultant report for them, then types the grades into the EAM by hand. A 148-page survey gets one proper read.
Now
Opens the report beside its findings, with each row tied to its sentence. Decides only the findings the agents question, with the last survey’s sentence and the work orders beside each one.
Condition assessment lead
Runs the survey program, signs summaries
Before
Runs the five-yearly survey program and the framework contract. Has no quick way to see which grades moved without cause, or the work that moved them.
Now
Sees each grade that moved since the last survey, with the work order that explains it. Signs a summary in which any questioned grade that was accepted carries its written reason.
Asset data steward
Keeps the register, releases EAM changes
Before
Keeps the register, while replaced pumps keep old nameplates and new plant goes unrecorded. Lets nothing into the EAM that cannot be traced to a page.
Now
Releases an update file in which each row carries its source page and held rows stay out. Register corrections and new asset records arrive with their evidence.
Capital planning manager
Ranks the five-year renewals
Before
Ranks renewals on whatever grades reached the index. One wrong good grade lets the roof slip another year.
Now
Reads a signed one-page summary. It says what to act on now, what moves in the capital plan and why, and which grades are still open with the consultant.
Consultant (guest)
Wrote the survey, answers questions
Before
Hears about a disputed grade months later, if at all, and needs only the page to recheck it.
Now
Gets each question with the page, the earlier grade and the work history behind it. Answers on their own reports only, within the 10 working days the framework contract allows.
The agents

How the report reader and history checker review each assessment report

One agent reads the report, and five more extract, match, check and write the update. The asset engineer decides, and a data steward releases.

Report reader

Reads consultant, manufacturer and test reports of any layout, with their sections, tables, photographs and appended certificates. Keeps the page, paragraph and sentence for each statement, and the caption for each photograph.

  • Never rewrites or summarizes a consultant’s finding, and keeps their words
  • Cites page and sentence for every value
Asset matcher

Matches each asset the report names to the asset register, by tag first, then nameplate, serial and location. Reports assets the register does not hold, and nameplates that differ from it.

  • Never creates or edits an asset record. Corrections go to the data steward
  • A mismatch always holds its findings
Findings extractor

Turns each statement into a finding with its element, grade, defect, reading (with unit and certificate) and recommendation. Converts another grading scale to the utility’s, and shows the conversion.

  • A grade is only what the report says
  • No reading without its unit and source
  • Below the confidence threshold, a finding goes to the engineer first
Limits checker

Checks each reading against the limit in the utility’s engineering standards or the manufacturer’s data, and proposes a defect for the planner. The limits cover breaker timing and contact resistance, IEEE 43 insulation and ISO 10816-3 vibration. They also cover oil, under IEC 60422 and the utility’s oil standard, and the utility’s wall thickness standard.

  • Limits come from Settings, never from the report
  • Never closes or raises a defect itself
History checker

Compares each grade with the last two surveys and the work orders since, and questions grades the evidence does not support. Checks photographs against the asset’s material and type. Each night it rechecks questioned grades when work orders close.

  • Never changes a grade
  • Every question shows its three sources
Update writer

Writes one condition update per finding, with its source page. Drafts a defect notification for each out-of-limit reading, and a question to the consultant for each grade kept. Then writes the one-page summary for capital planning.

  • Never writes to the EAM. A data steward releases the file
  • Held findings never enter the file
Asset engineer

Decides flagged findings, and a data steward releases to the EAM.

Ask in plain words

Questions about a doubtful grade, an out-of-limit reading or the capital plan

Ask about any asset, reading or grade in the report, or say what to question. Each answer points to its page. These answers use the sample data.

Why is the filter building roof questioned?

The consultant graded the roof covering 4, good. At the last survey, another firm graded it 2, with blistering, splits and water getting into the filter gallery. That firm recommended replacement within two years. Since then, the work history shows only gutter clearing and a temporary patch, and the replacement project is deferred and not started. Photograph 5.4 shows a single-ply membrane, which is the chemical building roof relaid since. I suggest keeping grade 2 and asking the consultant to recheck.

Which readings at this works are out of limit?

Seven of the 38. They are one breaker’s contact resistance, another breaker’s trip time, and the transformer’s oil breakdown voltage and acetylene. The others are clarifier 2 carbonation, a pump motor’s polarization index and the DN600 rising main wall. The slow breaker is the one to watch. The consultant graded it good, but it trips in 71 ms against 60 ms, and it feeds the ozone plant.

Draft the questions to the consultant

Three questions under the framework contract, with answers due in 10 working days. First, which roof does photograph 5.4 show, and what is the basis for grade 4? Second, what supports grade 4 for the backwash pump, when vibration is 6.8 mm/s, as at the last survey (6.9)? Third, what defect gives the sludge thickener bridge grade 2? The earlier grades stay on all three until the consultant answers.

What changes in the capital plan if we accept this report?

Two things move. The DN600 rising main, with 6.1 mm of wall against 7.0 mm at the river crossing, supports bringing its renewal forward. Taking the roof’s grade of 4 as written would let its replacement slip again. The evidence says it should stay in next year’s plan. The pump motor, the transformer oil and clarifier 2 are maintenance work, and they stay out of the capital plan.

The screens

Screens from one survey review: a questioned roof grade and the EAM file

From the working solution, on its sample data. Pick one to see it large.

The review screenThe consultant’s report beside its findings table. The 12 findings that need the engineer include serials that differ, an asset not in the register and readings out of limit.
A report arrivesThe 148-page survey on the left. On the right are the 63 assets in scope with their grades from the last survey, and the new column not yet read.
Agents at workSix agents read, match, extract, check limits and compare with the last survey, step by step, while the findings table fills in.
Each reading tied to its sentenceThe transformer’s oil at 38 kV against ≥ 40 kV, the sentence highlighted on page 32 and the recommended action.
A questioned gradeThe filter building roof’s rise from 2 to 4. This report, the last report and the work history sit side by side, with the decision buttons.
Asset historyThe roof's grade over three surveys, with the work orders on the timeline. It also shows what each report said, and the register record.
Changes since the last surveyGrade movement for the 63 assets in both surveys, the six questioned grades, and the improvements explained by work done.
Readings against their limitsThe seven readings past their limit, each with its standard, source page and recommended action.
Defects raisedA defect notification drafted for each out-of-limit reading, numbered for the maintenance planner.
The EAM updateEach condition update with its source page, released by the data steward. The held rows, the register correction and the new asset record sit alongside.
The report summaryOne page for capital planning, with sign-off. It covers what to act on now, the capital plan, the questions with the consultant and the register.
Condition reportsEach report, certificate and survey from received to in the EAM, with what is out of limit and questioned in each.
The rulesThe grading scale, how an asset's grade is made, the confidence threshold and the rules for questioning a grade.
Governance

Cited grades, steward release and guest access in condition report review

Each value keeps its page and sentenceEach grade and reading in the findings table, the EAM update file and the summary links to the report page and sentence it came from. Clicking a row scrolls the report to that sentence.
The asset engineer decides each flagged findingAgents extract, check and question. The asset engineer for the site accepts, holds or questions each flagged finding. Accepting a questioned grade needs a written reason, which is shown to the condition assessment lead with the summary.
Nothing reaches the EAM before a steward releases itThe update writer stages the file but does not write to the EAM. Only a data steward releases it, and held findings stay out of it. Asset records are created or corrected only by a data steward.
Three sources behind each questionA grade is held when it improved with no work recorded, fell sharply with no defect described, or does not match its reading. This report's sentence, the last report's sentence and the work orders are shown side by side.
Limits from the utility’s own standardsReadings are checked against the utility’s engineering standards and the manufacturers’ data held in Settings. No limit is taken from the report itself. Changes to rules and limits are versioned and on the audit trail.
Consultants see only their own reportsConsultants and test contractors join as guests. A consultant uploads reports and answers questions on their own reports only. A test contractor uploads certificates. Each decision, release and signature is on the activity trail with its time.
Configuration

Grading scale, questioning rules and who releases a condition assessment

How grades are read, when one is questioned and who releases and signs are settings, chosen by the asset management team.

SettingDefaultChoose from
Grading scale1 to 5 (5 = very good)1 to 5 (5 = very good) · 1 to 5 (1 = very good) · A to E. Reports on another scale are converted, and the conversion is shown on each finding
Asset gradeWorst elementWorst element · Weighted by element · Consultant's overall grade
Extraction confidence to accept without review90%Set up or down. Below it, a finding is shown to the engineer before it is loaded
Grade fell sharply with no defect described2 gradesSet the fall, in grades, that is questioned when the text describes no defect
Other questioning rulesAll onGrade improved with no work recorded · Grade does not match the reading · Nameplate or serial differs · Photograph does not match the asset. Each is On or Off
Releasing the EAM updateAsset data stewardAsset data steward · Second data steward. Nothing is written to the EAM before a data steward releases it
Report summary signed byCondition assessment leadCondition assessment lead · Alternate signer. It is signed before it goes to capital planning
Questions to the consultant10 working days5 · 10 · 15 working days, under the framework contract
Connections

Consultant surveys, test certificates, the asset register and work history

Contractor and OEM condition reportsfive-yearly site surveys, structural and pipe condition surveys, manufacturers' reports, in any layout
Test certificates and lab resultsbreaker timing and contact resistance, insulation, partial discharge, transformer oil analysis
Asset registertags, nameplates, serials, locations and criticality
Work order historycompleted and deferred work and capital projects since the last survey
Previous surveysthe last two reports for the same assets, quoted with their pages
Your EAMan update file of condition values and measurement readings, released by a data steward
What it changes

Condition assessment findings in the health index, each grade checked

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of report findings in the asset health index, each tied to its page
142 of 142 findings
from one 148-page report
target
Sameday
out-of-limit readings in front of an engineer, before the next outage
By handweeks, or never
With agentssame day
target
Every
grade change checked against the last survey and the work history before it is loaded

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate of the working hours for one 148-page site survey with about 140 findings, by hand and with the solution. “Typical” means published figures. In NASSCO PACP condition grading, an averaged Pipe Rating Index of 3 can hide six grade-5 defects behind six grade-1 defects. For context, see CIGRE TB 761 via IEEE Access 2021, on how incomplete records make the health index uncertain. See also the Ontario Energy Board distribution system plan filings, on asset condition assessments. Names on the screens are sample data.

Questions

Grades, limits and the EAM: condition assessment report review FAQ

What is condition assessment report review software?

Condition assessment report review software reads the condition reports and test certificates that consultants, manufacturers and test crews deliver. It turns them into structured findings and readings for the EAM and the asset health index. Condition Assessment Report Review uses six agents to read, match, extract, check limits and compare with the last survey. The asset engineer decides what they question, and a data steward releases the update.

How does condition assessment report data extraction work?

The report reader takes in the whole report, including scanned tables, photographs and appended certificates. Next, the asset matcher finds each asset in the register by tag, nameplate, serial and location. Then the findings extractor records each finding, tied to its page and sentence. A finding holds the element, grade, defect, reading with its unit and certificate, and recommendation.

How does it check a grade against the last survey?

The history checker compares each grade with the last two surveys and the work orders since. It questions a grade that improved with no work recorded, or fell sharply with no defect described. A grade is also questioned if it does not match its reading. The same holds if the asset's serial differs from the register, or its photograph does not match the asset.

Which limits does it check readings against?

Your own engineering standards and the manufacturers’ data, held in Settings. Examples are breaker trip time ≤ 60 ms, contact resistance ≤ 100 µΩ and polarization index ≥ 2.0. Others are oil breakdown voltage ≥ 40 kV, acetylene ≤ 2 ppm and vibration ≤ 7.1 mm/s. No limit comes from the report itself.

Does it write to our EAM directly?

No. The update writer stages an update file with a source page on each row. Nothing is written to the EAM until a data steward releases it, and held findings stay out of the file. Asset records are created or corrected only by a data steward.

Can the agents change a consultant’s grade?

No. Agents do not change a grade. The asset engineer accepts, holds or questions each flagged finding. Accepting a questioned grade needs a written reason. That reason is kept on the audit trail and shown to the condition assessment lead with the summary.

Does it work for water and electricity assets?

Yes. The sample works covers switchgear, transformers, motor control centers, pumps, pipework, civil structures and instrumentation. The report list includes breaker certificates, a cable partial discharge survey, a trunk-main wall survey, oil lab results and a wood pole inspection.

What does an asset team hand over to start condition assessment report review?

You hand over your grading scale, engineering standards, asset register and a sample of past condition reports. The Agentic Solution Engine builds and deploys it from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on one of your own surveys first.

Try condition assessment report review
on one of your own surveys.

We'll run Condition Assessment Report Review on one of your own consultant surveys and its last report.