- Before
- Chases 20 document owners before each audit and rebuilds the control matrix by hand. The evidence exists. The hard part is proving where it is, line by line, in the week the auditor is there.
- Now
- Asks about any clause and sees each line with its passage, each gap with its owner and a drafted request to send.
Clause 6.2 and the new data clause, 35 days before a transition audit
A utility runs electricity distribution up to 132 kV and water supply from source to meter. Its certification body will audit it in 35 days. The audit renews its certificate and moves it to ISO 55001:2024. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning, 35 days out
The whole standard on one wall
Asset management systems leadThe systems lead owns the audit plan and the evidence. The clause map shows all 27 subclauses of ISO 55001:2024, broken into 142 requirement lines. Today the standard is 84 % ready. Of those lines, 119 are evidenced and 16 need work, and 7 documents are missing. The clauses that are new or revised in 2024 are marked. Each gap shows in red on its tile.
6.2 Asset management objectives and planning · REVISED · 14/20 · 2 missing · 70 %
- 02One question
“Are we ready for clause 6.2?”
Asset management systems leadThe lead asks the question in plain words. The clause mapper reads 1,246 documents. It matches 27 passages from 12 of them to the 20 lines of clause 6.2. The evidence checker checks versions, approvals and dates. The gap finder names what the auditor will ask for, and the request drafter finds the owners. Four agents take four steps in 4.6 seconds.
“Mostly: 70 % today.” 14 of 20 lines evidenced · 4 need work · 2 missing
- 03The evidence
Each line with the passage the auditor will read
Clause mapperEach requirement line shows the passages that prove it. SAMP §1.3 puts the Asset Management Policy into effect, naming it and its revision. That is the evidence for line 6.2.1 a. SAMP §4.1 holds the Decision-Making Framework. It also sets the value the utility seeks in four measures: safety, service, whole-life cost and environment. That is the evidence for 6.2.1 b. Open the SAMP and each passage is highlighted, with a margin note on what it proves.
Margin note, 6.2.1 a: “Shows the SAMP is consistent with the policy, by name and revision.”
- 04Needs work
A draft does not count
Evidence checkerSAMP §5.4 says the capabilities needed are identified through the Asset Management Capability Plan, approved by the Steering Group. The only version on file is v0.4, marked draft and not approved. So line 6.2.1 d is graded as needing work. The next step is for the plan's owner to take v0.4 to the Steering Group's next meeting. Then they send in the approved version.
“Needs work: the only version is v0.4, which is not approved. Drafts do not count as evidence.”
- 05Missing
Two documents missing, each with its request drafted
Gap finder and Request drafterSAMP §10.1 promises a review each September. Last year's review is on file, but there is nothing for this year. SAMP §9.2 says Finance checks the plans against the approved budget each June. The latest check found is two budget years old. Each gap names the auditor's likely question and its owner. The owners are the head of asset strategy and the finance business partner. Both requests are drafted, due two weeks before the audit, and the systems lead sends them.
“80 % when the 2 requests come back, 16 of 20 lines.”
- 06The next clause
Clause 7.6 is new, and has the widest gap
Asset management systems leadThe lead asks, “What is missing for 7.6 Data and information?” The clause is 57 % ready, with 4 of 7 lines evidenced. The information requirements register sets out what data is needed. A procedure covers the data life cycle. But the plan to collect, join up, improve and share asset data is missing. The procedure's §5 calls it “to be issued”. The Asset Data Standard, v0.9, covers electricity assets only.
The auditor will ask: “Show me your plan to collect, integrate, improve and share asset data.”
- 07Tracked to the audit
Each request, its owner and its date
Asset management systems leadEach request moves from drafted to sent, received and accepted. The two clause 6.2 requests are sent, due two weeks before the audit. An earlier request, for evidence of competence in roles that make investment decisions, is 4 days overdue. One click sends reminders to owners who are late. Another request has come back: the Asset Data Standard v1.0, Part 3, which covers water assets.
“Requests are due 14 days before the audit.”
- 08Checked before it counts
The new data standard is checked, and coverage moves
Evidence checkerThe systems lead clicks Check it. The evidence checker reads the version and the approval. It is v1.0, approved by the Asset Data Board four days earlier. It reads the scope too: Part 3 covers 11 classes of water asset, from mains to reservoirs. Then it checks the document against requirement 7.6 b. The document is accepted. Clause 7.6 moves to 71 %, and the whole standard to 85 %.
“Checked by the evidence checker: v1.0 approved · 11 water asset classes · meets 7.6 b”
- 09Audit week, planned
Readiness by session, and the questions likely to be asked
Auditor question answererThe certification body's audit plan arrived a week earlier. Each session shows its clauses, who attends and how ready it is. The session on the SAMP, objectives and plans, on the first audit day, is 75 % ready with 2 documents missing. A visit to a 132/33 kV substation is 100 % ready. Last year's two minor findings show as closed, each with the proof that closed it.
Likely question for 13:00 on the first day: “How are your asset management plans aligned with the budget?”
- 10Built, then signed
The audit pack waits for the director’s signature
Director of asset managementThe audit pack assembler collects the cited passages for all 142 lines. It freezes the 212 cited documents at the version cited, and none of them is a draft. It files them in 27 folders by clause, each with its gaps and owners. Known gaps go to the director with the owner's action plan and date. Nothing is shared with the certification body until the director signs.
“Ready for the director. Nothing is shared until the director signs.”