A gasoline certificate prints 212 °F at 50% recovered; the lab system holds 221. Both driveability indexes are inside the limit.
Eight minutes on one certificate of analysis that passed every line
A diesel tank is due to load a tanker at 14:00. Its certificate went out at 10:05 with every limit passed, and the agents held it at 10:07. Here is what the chemist, the lab supervisor and the scheduler did next.
demoThe refinery, the vessel, the buyer, the people and each result are sample data, and the limits are a sample contract.
- 0110:42
Fifteen lines inside their limits, and the certificate is held
Product quality chemistEach line sits on one ruler between its limits, with the method and the test band the lab states. Sulfur reads 14.6 against a maximum of 15, shaded near the edge. Below the ruler runs one time line of the tank, and on it a red bar: 4,100 barrels from Unit 23 after the sample was drawn.
- 0210:43
Sulfur 14.6 from two runs, inside a band of 1 ppm
Product quality chemistShe opens the sulfur line. Two runs, 14.5 and 14.7, by ultraviolet fluorescence on one instrument. The lab states its own test band as plus or minus 1 ppm, a sample value. So the tank could read 15.6 in another lab. The result passes, and it is also the kind of pass a buyer's lab can overturn.
- 0310:44
At 07:30 the rundown swung into the tank, after the 06:10 sample
Product quality chemistThe movement order tells it plainly. Tank 309 hit high level at 07:25, and Unit 23 diesel rundown went to Tank 307 from 07:30 until 09:55. The sample was drawn at 06:10. Nothing on the certificate shows it, because the lab system never reads the movements record.
- 0410:44
Last 20 certificates on this tank read 6.9 to 10.8 ppm
Product quality chemistThe tank screen puts the level, the movements and the history together. This tank's median is 8.6, so 14.6 is odd as well as near the limit. The agent shows how the heel and the fill reach that reading from the analyzer, and labels it a sum, never a result.
- 0510:45
Reject and resample, in her own words, and she cannot sign it
Product quality chemistShe proposes rejecting the certificate under reason code S-1, product entered the tank after sampling, and writes why: the rundown came in after the sample, so close the inlet, mix and resample. The sign button stays off for her. Whoever proposes a decision does not sign it, so it waits for the lab supervisor.
- 0610:47
The gauge goes from 151,800 to 155,900 barrels after the sample
Lab supervisorBefore he can sign, he has to open the records the hold rests on himself. He reads the movement order, then the gauge readings: 151,800 barrels when the sample was drawn, 155,900 after the receipt. Her opens do not count for him; the product records his own, on the trail.
- 0710:48
Rejected: the certificate is void and a resample is ordered
Lab supervisorHe gives his reason and signs. The certificate is void. A resample order goes out, the tank stays closed to receipts, and the time line now shows mixers planned, a resample at 14:30 and an earliest loading of 17:00. The agents found it and held it. Only he could reject it.
- 0810:50
A start request for the berth is refused, with the reason
Tank farm schedulerShe asks for the tanker's start. Refused, with the reason: certificate void, resample ordered, a person has to decide. Her resample plan lists the steps, with the inspector's shore sample moved to 14:30 and loading 3 hours late. No valve moves from here; the product blocks the request and the board operator stays in charge.
- 0910:50
Who opened what, minute by minute, before anyone signed
Internal auditorThe trail reads from the bottom up: the chemist opened the sulfur line and the movement order, then proposed; the supervisor opened the movement order and the gauge, then rejected with his words; the scheduler's start was refused. Each certificate has an evidence file built from the same rows.