Own the disclosed transport figure, steer the agents and prepare the restatement
- Every shipment traceable to its source
- Points an assurer would raise, early
- A method note drafted sentence by sentence
Freight emissions calculation that builds each shipment's transport chain leg by leg and hub by hub, so the Scope 3 transport figure traces to its sources.
Follow one container's emissions from factory to DC ↓A shipper's transport figure mixes three kinds of data, carrier measured, modeled and default, and carriers state theirs on different bases: some count only burning the fuel, others count producing it as well.
Today the total comes from a TMS export, a calculator and carriers' emails. A tank-to-wake intensity added to well-to-wheel defaults understates it, a door move counted by the carrier and again from the gate log overstates it, and returns the customers paid for drift in and out of the boundary.
When the assurer samples a shipment and asks where a number came from, the team rebuilds the trail by hand, and anything it cannot rebuild weakens the conclusion.
Built forSustainability reporting teamsLogistics data analystsControllersProcurement managers
Transport emissions blend carrier, modeled and default data on different fuel bases, and nobody can trace the total back to a shipment.
Assembled by hand before assurance
Built-in controls
The disclosed transport figure can be followed by an assurer from any sampled shipment to its source.
The sustainability reporting manager runs them weeks before limited-assurance fieldwork, with the analyst, the head of sustainability and the controller.
demoEach shipment, carrier and tonne here is sample data.
Four jobs touch the figure before disclosure, each from its own end of the chain.
Own the disclosed transport figure, steer the agents and prepare the restatement
Work the weight, distance and carrier-mapping queues and rebuild chains
Co-sign the disclosed figure after opening the chain and the restatement
Own carrier relationships, data requests and decisions on mode shifts
Each signer opens the chain or the evidence first; the restatement clears if any of them sends it back.
The other screens the reporting team and procurement keep open in the run-up to fieldwork.
demoSample data, from the working solution.
Points the challenger raised on the sample year, each with what happened next.
The carrier's intensity covered only burning the fuel. The read stopped, and a structured request asked for the well-to-wake figure.
Store-door bookings carried the inland truck in the carrier's figure and again from our gate log. The legs were flagged until the carrier states its share.
The planned weight and the signed bill of lading disagreed. The bill of lading weight was used, under a standing rule.
The factor covered the calendar year, not the fiscal year. It was disclosed in the method note, and a structured request went out for the fiscal-year figure.
demoSample data, from the working solution.
Freight emissions calculation turns the transport a company pays for into tonnes of CO2e. Here it runs shipment by shipment: each leg and hub gets its activity in tonne-kilometers, an intensity, a data tier and a source, and the year rolls up by mode, carrier and tier.
The method note states the figure is built in line with ISO 14083 and the GLEC Framework, with well-to-wheel intensities. Whether a disclosure meets a rule is for the head of sustainability and the assurer to judge.
The read stops for that carrier, and the agents draft a structured request for the well-to-wake intensity, its period, method and fuel mix. A person sends it, and only the returned fields change the figure.
The reporting manager can steer, for example moving returns the customers paid for into their own category, and the head of sustainability approves any boundary change as second person.
An evidence pack with the drafts, method note, boundary memo, factor register, the sample traces, carrier statements and the audit trail, plus a list of what was left out and why.
Yes. The mode shift what-if plays lanes forward in tonnes saved, days added and freight cost, every input marked as an assumption, and the decision stays with the procurement manager.
Charges suppliers accept, because both sides read the same facts first.
1-min demoFreight Audit and PaymentEvery carrier bill re-rated against the contract before it is paid, with the working shown.
1-min demoFreight RFP ManagementRates that hold at tender: low bids checked against what each carrier accepted.
1-min demoWe will rebuild one of your shipments' chains with you, leg by leg, and show where each number came from.