Run the bid, rule on the challenger's points, build and submit the award
- Every bid for a lane on one price line
- The carrier's objection heard before tender season
- Answers that re-price bids without reading paragraphs
Freight RFP management where each low bid is checked against what that carrier accepted as primary on your own freight, and each term in the bid's notes is applied before anyone signs.
Follow one dry-van bid from bid files to award notices ↓Bids come back as dozens of spreadsheets. The rate sits in the lane column; the terms that decide whether it is real sit in a notes column, a general terms tab or a covering email: valid with two days' notice, Monday to Thursday only, fuel on our own schedule.
The low bid is compared with the incumbent's rate, never with what that bidder has accepted on the shipper's own freight. Clarifications come back as paragraphs and are scored by whoever reads them. The award goes into the routing guide, and over the year primary carriers turn tenders down and the loads move on the spot market at a premium.
Nobody adds those rejected tenders up against the award, so the saving on the slide the VP approved is not the saving in the books.
Built forShippersTransportation procurement teamsLogistics leadersFreight category analystsFinance partners
A shipper awards the lowest bids, then carriers reject the tenders their rate or their own terms do not cover.
Worked by hand in spreadsheets
Built-in controls
The shipper awards rates tested against its own tender history, before tender season starts.
Procurement managers, analysts and logistics VPs use them to run a truckload bid and award rates that hold. The screens follow one dry-van bid from first read to notices.
demoThe shipper, carriers, staff, lanes and rates shown are invented sample data.
Each desk sees the same lanes in the bid and decides a different thing.
Run the bid, rule on the challenger's points, build and submit the award
Bid files, clarifications, the leak assumptions and the rate load
Sign the award as the second person, and approve learned rules
Confirm the baseline and test what the planned saving depends on
Each starts from an empty reason box, and the audit trail records the meaning of each signature.
The screens finance, the analyst, the VP and the administrator open during the same bid.
demoSample data, from the working solution.
What a price-only award would have carried into tender season.
The low bid on the focus lane came to $2.26 a mile; as primary on nine similar lanes the same carrier accepted $2.55, and 22 of its 24 rejections came with under 48 hours' notice.
One terms tab asked for 48 hours' notice. Once the bidder confirmed it in the fields, all 181 of its lanes in the lowest-cost award counted as at risk.
A draft scenario named a backup on two lanes whose capacity tab said the trucks belonged to the primary. The agents conceded and re-picked from another fleet.
One bid carried $100,000 of cargo cover against $250,000 required; another carrier's liability insurance on file was canceled. Both were excluded, with the record.
demoSample data, from the working solution.
Freight RFP management is how a shipper runs its yearly freight RFP, also called a transportation RFP: a lane file, a requirements document and a deadline, answered by carriers and brokers with a rate per lane. This solution runs that bid, tests the award against what each bidder accepted on the shipper's own freight, and leaves the award to two people.
An optimizer finds the cheapest combination of bids. Here a challenger also plays each award forward against each bidder's primary tender history and its own terms, argues as the carrier's dispatcher would, and names the next bidder whose rate and terms hold.
From the shipper's transportation management system: a year of primary contract tenders per bidder, compared per mile on lanes of similar length in the same region pair. Backup and spot loads are left out.
The agents read notes columns, terms tabs and capacity tabs, cite each to its cell and apply each term to all the lanes the bidder would win. A term waiting on an answer is listed; a confirmed one counts the lane as at risk.
It is an assumption, labeled as one on every screen: a rejection share and a spot premium the analyst confirms against the tender history. Editing either clears that confirmation and blocks the award until it is given again.
Every billed day proved or disputed with its record, well inside 30 days.
1-min demoAccessorial Charge AuditEvery minute of detention tied to the record that proves it.
1-min demoParcel Contract NegotiationWalk into the renewal knowing what each term costs, and what the carrier will say.
1-min demoWe will play your own award forward against what each carrier accepted, lane by lane.