Writes the event as a plain record, with a source for each fact.
- Never says force majeure about the event
Force majeure notice work for counsel and contract teams: one plain event record, each affected contract on the clock its own clause sets, and nothing sent until counsel decides.
Follow one 48-hour notice to delivery ↓When a site closes, every contract that touches it may need a notice, and each clause sets its own terms. One wants notice within hours of the event, another within business days of becoming aware, a third by courier signed by an officer. Some make notice in time a condition of relief.
The team first has to find which contracts are touched, then read each clause, then find the current notice address, which may have moved by a letter years later. Meanwhile the shortest clocks are already running, and the notices that go out first are often the easy ones, not the urgent ones.
Built forSenior counselContract analystsCommercial managersRisk managersInternal auditors
One flood or fire can start dozens of notice clocks, each with its own clause, form and address.
Tracked by hand today
Built-in controls
Counsel works the shortest clocks first, and each notice goes to the address in force, with the reads behind it logged.
The marine terminal at a refinery closes when the river crosses flood stage. On the second evening, one diesel sale has nine hours left on a notice that is a condition of relief.
demoSample data only: the terminal, the buyers, the people and every amount.
The event fan puts the flood on the left as a plain record and the contracts it may touch on the right, shortest clock on top. 36 clocks are running, 1 ran out and 27 have stopped. One has already run out, a towage contract now with counsel. Sale 118 leads the running clocks with nine hours left.
Each fact in the record has its source. Behind the closure is the harbor master's notice: channel and berths closed to vessel movements, no reopening date until a survey. The river peaked at 24.1 feet against a flood stage of 18.0. The record leaves the legal label out on purpose; counsel decides that, contract by contract.
The force majeure clause sits beside the facts on file, line by line: what counts, how hard it must bite, the clock, the form and address, what the notice must say, the duty to limit harm and how it ends. Notice in time is a condition of relief. Two cargoes of 300,000 barrels fall in the window, $57.0M of deliveries. The agents take no view on whether the clause applies.
The draft is addressed to the contracts desk named in the agreement. The check before it can go says no: a letter from the buyer, countersigned, moved all notices under this contract to supply coordination, and the old mailbox has closed. Sent as drafted, the notice would reach nobody, and the clock would run out while it sat there.
The notice address now reads supply coordination, from the later letter, with its source. Method, nature of the event, expected duration and quantities affected all pass their checks against the clause. The analyst prepares the notice, but she cannot decide it. She sends it to senior counsel, nine hours before the clock runs out.
Her decision panel lists what she must read: the clause, the later letter and the draft itself. Each opens from its source, and each opening is logged. The clause reads as the contract wrote it: notice within forty-eight hours of the start of the event, stating its nature, expected duration and the quantities affected.
She decides the notice goes, as drafted, and the delivery is logged by email to the notice address with the receipt kept. The clock reads stopped. The decision line records who decided and how much time was left. Only a logged delivery or counsel's recorded decision can stop a clock; the clock keeper cannot.
Filtered to reads, the audit trail shows counsel opening the notice, the letter and the contract clause, the analyst opening the letter and the harbor notice, and the event recorder's first entry from the terminal duty log. Who agreed, what they read, and when, answered on one screen.
Back on the fan, the stopped filter lists every line delivered, ruled or closed with no notice by counsel, Sale 118 first. Its clock no longer counts. The headline row now names the next notice due, with 9 hours 12 minutes left, and the counts read 35 running, 1 ran out and 28 stopped.
The clause beside the facts, as the analyst and counsel read it.
| The clause asks | What the file holds |
|---|---|
| Notice within forty-eight hours of the start of the event | Closure at 06:40 on day one, so the clock runs out at 06:40 on day three |
| Notice in time is a condition of relief | Marked on the line before anything else |
| Email to the notice address, receipt kept | Address moved by a later countersigned letter; draft corrected |
| Nature of the event, expected duration, quantities affected | Harbor master's closure, first damage report, two cargoes of 300,000 barrels |
| Reasonable efforts to limit the harm | Rail rack at 22,000 barrels a day for all product |
demoSample data, from the working solution.
The screens behind the rest of the touched contracts and the proof.
demoSample data, from the working solution.
They record, find, read, time and draft. Every legal call is counsel's.
Writes the event as a plain record, with a source for each fact.
Proposes contracts in and out of scope, each with a reason.
Sets the clause's words beside the facts on file.
Starts and watches each clock from the clause's own terms.
Drafts, checks address and method, and logs delivery.
Checks notices received against their own clause.
Tracks proof, updates, last dates and closing notices.
Agents prepare. Senior counsel and the terminal duty manager decide.
Read only, from the systems the legal and terminal teams keep.
A force majeure notice tells the other party that an event beyond your control is stopping or delaying performance, as the contract's force majeure clause requires. Each clause sets its own deadline, form, address and contents. This solution finds the contracts an event touches, times each force majeure notice by its own clause and drafts it for counsel to decide.
The clock keeper reads the clock from the clause itself: hours from the start of the event, business days, or from awareness. Clauses with no fixed clock sort on counsel's working target, shown in a band of their own.
The clause reader marks it on the line, and those lines sit with the shortest clocks. Counsel still decides whether the clause applies and whether to send.
The notice drafter checks the address in the contract against later letters in correspondence. If a letter moved it, the check fails, shows the letter, and the analyst corrects the draft before counsel sees it.
Yes. The received-notice reader checks each one against its own clause and lists what it leaves out, such as an expected duration. Counsel decides any reply.
No. Agents draft. The analyst prepares and sends to counsel, and only senior counsel's decision, after reading the sources, releases a notice.
Every deviation pinned to the part it affects, with prices sealed until engineers sign.
1-min demoLocal Content Plan ComplianceWhat is claimed kept apart from what is proven, and the gap closed with proof.
1-min demoEPC Tender ResponseHidden scope reaches the estimate before the bid closes.
1-min demoTell us about one event you lived through; we rebuild its notice clocks with you from the clauses.