Full radiography on one line class, three levels below the invitation
Annex 7, one sentence, three levels down, and 3,800 welds missing from the bid
Twenty-three days before a gas train tender closes, the bid desk opens the depth gauge. Overnight the package was read and its references followed; by mid-morning one of them has a price.
demoSample data only: bidder, client, tender, people and numbers.
- 0108:02
86% of the unpriced work sits in the standards, below the annexes
Proposal managerThe depth gauge draws the tender as it is built: the invitation on top, 38 annexes under it, 212 referenced standards under those. 3,348 of 6,214 requirements are priced. At the third level, 2,479 requirements are not yet tied to the estimate, which is where the gauge glows. Her next step is already named: route one line to the lead estimator.
- 0208:05
Annex 7 points to 34 standards holding 498 more requirements
Proposal managerOpening the piping annex shows why it glows. On its own pages sit 196 requirements, 148 priced. The standards it names hold 498 more, 339 unpriced, and 7 of them could not be followed. The most unpriced is the client's piping fabrication, examination and testing standard, with 39 requirements nobody has tied to a line.
- 0308:07
Inside the piping standard: 61 requirements, 22 priced
Proposal managerOne dot opens the standard itself, reached through Annex 7. Among its 61 requirements she sees test packs witnessed by the company, film kept and handed over as digital copies, and the one that matters most: radiography on class D2S butt welds, where random selection does not apply. Each line in the panel opens its row in the matrix.
- 0410:14
The count is confirmed: 3,800 welds the estimate does not carry
Piping discipline leadThe trail reads in four steps: Annex 7 clause 4.3, the standard's section 8.4, clause 8.4.2 on page 37, and Table 8-1. Against the line list, only D2S is used on this train. Of 4,222 butt welds, 422 are priced at 10% already, so 3,800 are missing. The piping lead confirms the count before anyone puts a number on it.
- 0510:20
The estimator types his own rate, and the line is priced at $2,280,000
Lead estimatorUntil now the figure was indicative, from the rate sheet, with no person behind it. The lead estimator enters his rate per weld and sets the price, and the answer for the compliance form goes in as comply. So far the bid itself is unchanged. Next in line is the bid director, who must open the source before she can sign.
- 0610:26
The bid director reads clause 8.4.2 on its page before she signs
Bid directorSign stays locked until the source is opened. The clause appears as the client wrote it: butt welds in the listed line classes receive full radiographic examination, and random selection does not apply. She reads it in context with the page reference beside it. Her signature then means she saw the sentence the money rests on.
- 0710:29
Nine requirements move to priced, and the count goes to 3,357
Bid directorShe signs as written. Into the estimate goes the line, nine requirements change to priced with the answer comply, and the counter at the top climbs from 3,348 to 3,357 of 6,214. The note under her name says who priced it and who signed it. The proposal manager sees the new count without asking anyone.
- 0810:32
Where the client standard is not in the package, the agent stops
Reference followerA metering clause in Annex 13 points to a client standard that the package does not contain. The agent opens the clause, finds the standard missing, and stops there. It will not guess what the standard says. It writes the requirement to the matrix with its trail and drafts a question for the client, which waits for the bid director to release it.
- 0910:40
$11,471,590 of base scope found on 11 lines, $2,280,000 signed
Lead estimatorThe estimate view adds it up for the desk: base scope found on 11 valued lines, how much a person has priced, how much is still indicative, what is signed into the estimate, and one priced option kept outside the base. Each line names its requirements, its quantity and rate, its discipline and where it stands, so the estimator knows what still needs him.