- Before
- Writes bills, notices, letters and text messages in English and reviews the second language. Shares 46 templates with a second writer. Rewrites what is asked, without knowing which sentence is the problem.
- Now
- Sees the calls each paragraph caused and the customers' own words, beside a plain rewrite in both languages. Accepts, edits or rejects each one.
A monthly bill that drew 641 calls, rewritten in two languages and released to print
A utility sends about 412,000 electricity and water bills a month, in two languages. A change request opens on the monthly bill as part of the quarterly bill refresh. It is due for the next print run. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0109:10
The bill opens with the calls beside each paragraph
Customer communications writerThe writer opens the bill. The live wording is redlined, with the plain rewrite beside it. A call gutter on the left shows the calls each paragraph caused. The greeting has 0 calls, the amount due 147 and the estimated reading 212. Across the top, the scoreline shows a reading age of 13 against a target of 9, and 7 of 12 required items. It also shows 641 linked calls plus 101 emails and chats. Ten findings are open: 6 high, 2 medium and 2 low.
¶3 Estimated reading · “Drove 212 calls last quarter” · Missing · how to send your own reading · regulator's clause
- 02Two minutes
The agents read, score, check, link and rewrite the bill
The six agentsThe template reader splits the draft into 8 paragraphs and pairs each with its second-language twin. Next, the plain-language reviewer scores reading age 13 in English and 14 in the second language. It finds 15 terms from the word list. The required-content checker finds 7 of 12 items present and 4 missing, and ¶7 contradicts the notice clause. Then the call-driver linker searches 18,240 customer contacts from 90 days and links 641 calls to 7 paragraphs. Last, the rewrite writer drafts 7 rewrites in both languages.
Bilingual checker: “2 mismatches in the live wording · 0 in the rewrites”
- 03Why they called
Readings ignored, so bills stay on estimates
Call-driver linkerIn Call drivers, Voice of Customer challenges are joined to the words that cause them. A challenge is one problem customers keep raising. This one carries 268 calls last quarter. Of those, 212 land on ¶3 of the bill and 56 on the estimated-bill text message. The linker judges that words can fix it, because the bill does not say how to send a reading, or by when. Customers also sent 38 photo readings that were never booked. That is a process cause for Billing operations.
In their words: “It says estimated. Estimated how? I sent a photo of my meter two weeks ago.”
- 04One click
The rewrite tells customers how to send a reading
Customer communications writerThe plain rewrite of ¶3 says the meter could not be read. It explains that the estimate is based on use at the same time last year. Then it asks the customer to send a reading in the utility's app by a stated date. Its reading age falls from 14 to 8, and it adds required item 5. The writer accepts it. Now the bill's reading age moves from 13 to 12, and its required items from 7 to 8.
“¶3 accepted · reading age 13 → 12 · required items 7 → 8”
- 05Compare languages
Both language versions must say the same thing
Bilingual checkerThe two language versions sit side by side, paragraph by paragraph. Checks run on numbers, dates, content, merge fields and plain tone. Merge fields are the slots filled in for each customer, such as a name or an amount. The live bill has 2 mismatches. In ¶3, the second language asks for a reading before the 15th, while the English gives no date. In ¶2, the second language leaves out the sentence on payments applied to the oldest balance. The rewrites give one date in both.
Reading age 13 in English, 14 in the second language · 6 merge fields, the same in both languages
- 06High · Legal signs
The late-payment line broke the 10-day notice rule
Required-content checker¶7 says non-payment “may result in suspension of supply without further notice”. It does not mention payment plans. Its 81 calls include one from a customer whose father is on oxygen at home. The rewrite offers a payment plan in the app or by phone. It also says supply is not cut off without 10 days' written notice. Then ¶8 adds the right to ask the ombudsman, an independent reviewer, to look at a complaint. It also adds the priority care register for customers who rely on medical equipment. Both go to Legal.
In their words: “Your bill says you can cut me off without telling me. My father is on oxygen at home.”
- 07Words cannot fix it
Some calls are not the wording's fault
Customer communications writerA second challenge is “Planned-outage notice arrives after the outage starts”. It carries 403 calls on the electricity interruption notice. This time the linker finds the wording clear. The notice goes out 24 hours before the work. But 31 % of notices in Q3 reached customers after the work had started. So the second writer sent it to Network operations as a timing problem, with the calls as evidence. Nobody rewrote a notice that was not the cause.
“Words cannot fix this. Owner: Network operations.”
- 08Sent for approval
Compliance confirms 12 of 12, and Legal e-signs the rights
Compliance officer and legal counselWith all 7 rewrites accepted, the writer sends the change request for approval at reading age 8. The regulatory compliance officer confirms 12 of 12 required items. Legal counsel e-signs ¶7 Late payment and ¶8 Help and complaints, in both languages. The signature records what it means: “Approved as legally correct”.
“We will never cut off your supply without writing to you at least 10 days before.”
- 09Released
Released to the next print run
Head of customer communicationsThe head of customer communications releases the bill to the print run in 1 day. That is inside the 5-working-day review clock. The record holds each step, by people and agents alike. It covers the agents' review, each rewrite the writer accepted, the compliance confirmation, the legal signature and the release. It exports with its findings, edits, signatures and versions.
“Released · prints on the next run · calls measured for 90 days”
- 1090 days later
Calls counted after release, from the last rewrite
Call-driver linkerImpact shows the proof from the last rewrite, the 10-day disconnection notice released the quarter before. Its calls went from 312 to 198 a quarter. Payment plans set up from it rose from 410 to 655. Complaints about it to the ombudsman fell from 9 to 2. For the open change request, the forecast is 418 calls a quarter, against a target of 427 or fewer.
“Target: a third fewer · met” · these 5 challenges account for all 114 fewer calls